`Asbestos Control Program Construction Reopening Guidance | City of New York
`NYSCEF DOC. NO. 5
`RECEIVED NYSCEF: 06/29/2020
`
`https://www1.nyc.gov/site/dep/news/040620/asbestos-control-program-construction-reopening-guidance
`
`1/3
`
`Menu
`
`Search
`
`News
`
`Asbestos Control Program Construction
`Reopening Guidance
`
`June 4, 2020
`
`COVID-19 Asbestos Project Health and Safety Recommendations
`
`All owners and contractors should review the New York State Department of Health (NYSDOH) Interim
`Guidance for Construction Activities During the COVID-19 Public Health Emergency and affirm
`understanding and implementation of the requirements to reopen construction projects. At a minimum,
`the following should be adhered to:
`
`Implement health screening check of each incoming employees prior to the work shift.
`Implement a temperature check of incoming employees prior to the work shift. Any worker with a
`temperature reading above 100.4° F must not be allowed to work. The date and time temperature
`was taken for each work shift should be entered into the asbestos handler supervisor’s project
`logbook.
`When a worker tests positive for COVID-19, this must be reported immediately to the DEP Abestos
`Control Program (ACP) at COVID19asbestos@dep.nyc.gov.
`Develop and post on-site all the COVID-19 worker protection plans required by NYSDOH and the
`NYC Department of Buildings.
`All workers/individuals who are engaged with any activities outside of the work area must at all
`times comply with the social distancing and face covering guidelines.
`Remind workers that there is no eating, drinking, smoking or congregating at the workplace.
`
`Asbestos Projects
`
`Asbestos projects pose multiple hazards to workers. However, in relation to COVID-19, the
`decontamination process has been identified as the area where exposure to COVID-19 would occur.
`
`

`

`INDEX NO. 154637/2020
`FILED: NEW YORK COUNTY CLERK 06/29/2020 01:08 PM
`6/22/2020
`Asbestos Control Program Construction Reopening Guidance | City of New York
`NYSCEF DOC. NO. 5
`RECEIVED NYSCEF: 06/29/2020
`
`https://www1.nyc.gov/site/dep/news/040620/asbestos-control-program-construction-reopening-guidance
`
`2/3
`
`Specifically, within the decontamination unit, the shower room and clean room pose the most risk for
`worker exposure to COVID-19. Therefore, in addition to compliance with the 15 RCNY, it is strongly
`recommended that abatement contractors employ these additional COVID-19 safety precautions during
`the work shift:
`
`Decontamination Unit
`
`Sanitize the clean room and shower room at the end of each shift and between all breaks (lunch hour).
`These activities must be documented in the asbestos handler supervisor’s project logbook. Approved
`sanitizing/disinfectant agents must be used at all times. View the List of Disinfectants that are approved
`by the Environmental Protection Agency.
`
`Clean Room: When social distancing requirements cannot be met, allow only one worker in the
`clean room at any one time. If lockers are utilized they should be sanitized at the end of each shift.
`Install and maintain hand sanitizer in the clean room at all times.
`Shower Room: When social distancing requirements cannot be met, allow only one worker in the
`shower room at any one time. Ensure that sufficient quantity of soap and hot water are available at
`all times.
`Holding Area and Waste Transfer: All workers involved in the transferring of asbestos containing
`materials waste outside the holding area must continue to wear personal protective equipment and
`respirators if social distancing cannot be complied with. When an elevator is being used to
`transport waste, there should be a maximum of two workers per elevator.
`Exterior Projects: No general construction work should be conducted within 50 linear feet of
`regulated area. General construction workers must wear face coverings and comply with the social
`distancing policies while working.
`Asbestos Project—ARTS Instructions
`
`On June 8, 2020, the Asbestos Control Program will start approving Non-Essential projects, including
`filings on hold or fall within three categories (Postponed Status or Objection (COVID) Status or In
`Progress Status). To expedite the APPROVAL process follow these instructions:
`
`1. POSTPONED PHASE: Projects which were in progress at the time of the mandate and were
`placed on postponement by the applicant may be un-postponed by applicant:
`If the project was postponed after the start date, take the project out of postponement to
`change status to “Submitted”
`If the project was postponed before/on start date, file ACP-8 to set a new start date to
`change the project status to “Submitted”. If no amendment remained for start date change,
`contact ykim@dep.nyc.gov to add one more amendment.
`2. COVID-19 HOLD PHASE: For filings which have been reviewed, all objections satisfied and are
`ready to be approved in ARTS, the system does not require a 7 day waiver.
`When the applicant is ready to start, they should respond to the COVID-19 hold objections
`ACP-7, ACP-8, ACP-9, 1-22b and/or ATRU permit.
`If the start date has passed, the system requires new start date to be entered by the DEP
`reviewer to approve ACP-7.
`The applicant should be prepared to provide DEP with the new start date.
`3. IN PROGRESS PHASE: For filings which have been reviewed and that the applicant did not move
`forward, they will need to respond by external comments in order to continue the review process.
`
`

`

`INDEX NO. 154637/2020
`FILED: NEW YORK COUNTY CLERK 06/29/2020 01:08 PM
`6/22/2020
`Asbestos Control Program Construction Reopening Guidance | City of New York
`NYSCEF DOC. NO. 5
`RECEIVED NYSCEF: 06/29/2020
`
`https://www1.nyc.gov/site/dep/news/040620/asbestos-control-program-construction-reopening-guidance
`
`3/3
`
`If the start date has passed, the system requires new start date to be entered by the DEP
`reviewer to approve ACP-7.
`The applicant should be prepared to provide DEP the new start date.
`
`For more information, visit Asbestos Abatement Forms and Filing Instructions.
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket