`CyboEnergy Pat-488 Claim Chart Deye ESS Tech — July 2025
`
`Exhibit D. CyboEnergy Patent-488 Claim Chart vs. Deye ESS Tech
`
`Patent-488: “Enclosure and Message System of Smart and Scalable Power Inverters"
`
`C. Claim Chart of CyboEnergy US Patent No. 9,331,488, Claim 16
`
`Independent Claim
`
`Deye SUN600G3, SUN8S800G3, SUN1000G3, SUN1300G3,
`SUN1600G3, and SUN2000G3 Inverters
`
`16. A method for indicating
`status, comprising:
`
`monitoring the status of a
`power inverter having
`multiple DC input channels
`and monitoring each of the
`input channels;
`
`Deye ESS Technology USA Inc., and its affiliate companies (Deye) manufacture
`and sell solar inverters. The infringing Deye inverters include SUN600G3,
`SUN800G3, SUN1000G3, SUN1300G3, SUN1600G3, and SUN2000G3
`microinverters (SUN Series Microinverters) as shown below. [1] [2][3]
`
`Deye SUN600G3, SUN800G3, SUN1000G3
`
`References [1][2][3] show that the Deye SUN600G3, SUNS00G3, SUN1000G3,
`SUN1300G3, SUN1600G3, and SUN2000G3 microinverters have multiple DC
`input channels or input ports.
`
`See marked words in the SUN600G3, SUN800G3, SUN100G3 image and in
`SUN1300G3, SUN1600G3, SUN200G3 image below.
`
`
`
`
`
`
`
`
`
`Case 2:25-cv-07964-AH-PD Document 1-4
`
`Filed 08/22/25 Page 2 of 4 Page ID
`
`#:64
`
`CyboEnergy Pat-488 Claim Chart Deye ESS Tech — July 2025
`
`Deye SUN600G3, SUN800G3, SUN1000G3
`
`AC Input Port AC Output Port
`
`DC Input Port 1
`
`DC Input Port 2
`
`Deye SUN1300G3, SUN1600G3, SUN2000G3
`
`DC Input
`Port 1 > hd
`~
`
`DC Input
`Port 3
`
`DC Input
`
`AC Input Port ~ Port2
`
`DC Input
`
`AC Output Port
`Port 4
`
`and actuating LEDs (light-
`emitting diodes) based on the
`monitoring, wherein a system
`status LED is controlled and
`arranged to indicate that
`
`a) the inverter is working;
`
`b) the inverter is working but
`has warnings;
`
`¢) the inverter has errors;
`d) the AC grid has errors; and
`
`e) the inverter is off.
`
`In Deye “Installation User Manual for Photovoltaic Grid-connected Microinverter
`(Built-in WIFI-G3-US-220V)” [3], the Status Indications and Error Reporting
`include the following inverter status monitoring functions:
`
`Status Indications and Error Reporting
`
`Start up LED
`
`One minute after DC power is first applied to the microinverter,one
`short red blinks indicate a successful microinverter startup sequence,
`be equal or greater than two short red blinks after DC power is first
`applied to the microinverter indicate a failure during microinverter
`
`setup.
`
`Operation LED
`Flashing Slow Blue - Producing small power
`Flashing Fast Blue - Producing big power
`Flashing Red - Not producing power
`
`Red blinking two times - AC low-voltage or high-voltage
`Red blinking three times - Grid failure
`
`
`
`
`
`
`
`
`
`Case 2:25-cv-07964-AH-PD Document 1-4 Filed 08/22/25 Page 3 of 4 Page ID
`#:65
`
`CyboEnergy Pat-488 Claim Chart Deye ESS Tech — July 2025
`
`These instructions show the Deye SUN Series Microinverters perform:
`
`monitoring the status of a power inverter having multiple DC input channels and
`monitoring each of the input channels; and actuating LEDs (light-emitting diodes)
`based on the monitoring, wherein a system status LED is controlled and arranged
`to indicate that
`
`a) the inverter is working, (Flashing Fast Blue, Producing Power);
`
`b) the inverter is working but has warnings, (Flashing Slow Blue, Only Producing
`Small Power);
`
`c) the inverter has errors, (Flashing Red, Not Producing Power);
`d) the AC grid has errors, (Red Blinking Three Times); and
`
`e) the inverter is off, (LED is not flashing or not on).
`
`Key Words
`LED - Light-Emitting Diodes
`
`PV — Photovoltaic.
`
`PV Modules — Photovoltaic Modules or Solar Panels.
`DC — Direct Current.
`
`AC — Alternating Current.
`
`DC Source — DC power source that includes but is not limited to photovoltaic (PV) solar
`modules, fuel cells, batteries, and other DC power generators.
`
`Grid — Electric Grid or Power Grid
`
`On-Grid, Grid-Tie, or Grid-Interactive — A DC to AC power conversion or inversion system such
`as a solar power system that provides or feeds generated power to the electric grid.
`
`References
`
`[1] Deye SUN600G3, SUN800G3, SUN1000G3 Microinverter Datasheet.
`https://asset.conrad.com/medial 0/add/160267/c1/-/de/839521818DS00/datenblatt-838401264-
`balkonkraftwerk-mikro-wechselrichter-deye-sun600¢3-eu-230.pdf
`
`
`
`
`
`
`
`
`
`Case 2:25-cv-07964-AH-PD Document 1-4 Filed 08/22/25 Page 4 of 4 Page ID
`#:66
`
`CyboEnergy Pat-488 Claim Chart Deye ESS Tech — July 2025
`[2] Deye SUN1300G3, SUN1600G3, SUN2000G3 Microinverter Datasheet.
`
`https://www.deyeinverter.com/deyeinverter/2021/06/12/%E3%80%90b%E3%80%9 1 microinvert
`ersun1300-200023-eu-230.pdf
`
`[3] Deye Installation User Manual for Photovoltaic Grid-connected Microinverter (Built-in
`WIFI-G3-US-220V).
`https://www.deyeinverter.com/deyeinverter/2023/02/11/rand/8486/%E3%80%90B%E3%80%91
`30240301001503-%E5%BE%AE%E9%80%86%E8%AF%B4%E6%98%8E%E4%B9%A6-
`SUN(300%EF%BD%9E2000)G3(%E5%90%AB%E9%85%8D%E7%BD%91)-US-220-
`
`Verl.2.pdf
`
`[4] Deye 2024 Catalog - World-leading Energy Storage System Provider.
`https://deyeinverter.eu/downloads/Catalog DEYE 2024 EU_ENG.pdf
`
`Deye Company Info:
`
`Deye ESS Technology USA Inc.
`215 North Sunset Avenue
`City of Industry, CA 91744 USA
`
`
`
`
`
`
`
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket