`November 2, 2022
`
`
`Ms. Kimberly D. Bose, Secretary
`Federal Energy Regulatory Commission
`888 First Street, N.E.
`Washington, D.C. 20426
`
`Re: Corpus Christi Liquefaction, LLC
`Docket No. CP18-512-000
`Implementation Plan D - Request for Authorization to Commence Installation of Underground Piping -
`Supplemental Information
`
`On November 22, 2019, the Federal Energy Regulatory Commission (“FERC”) issued an Order Issuing Authority
`Under Section 3 and Section 7(c) of the Natural Gas Act (“Order”) granting the necessary authorization to Corpus
`Christi Liquefaction, LLC (“CCL”) for construction and operation of an expansion of the Corpus Christi Liquefaction
`Project (“Stage 3 Project”).
`
`On October 20, 2022, CCL filed Implementation Plan-D to demonstrate compliance with Conditions 36, 44, 47, 74,
`and 98 of the Order. CCL is herein submitting supplemental information in response to an information request from
`FERC dated October 26, 2022.
`
`CCL respectfully requests FERC’s authorization to proceed with the activities described in Implementation Plan-D at
`the earliest date possible, but no later than November 14, 2022.
`
`Portions of the information submitted in the instant filing includes confidential and/or proprietary design information.
`In accordance with Sections 388.112 of the Commission’s regulations, the Company requests that the information
`submitted be accorded Privileged and Confidential treatment. Accordingly, the material has been marked “CUI//PRIV
`– Privileged & Confidential – Do Not Release”. Questions regarding this request for privileged and confidential
`treatment should be directed to the undersigned.
`Should you have any questions about this filing, please feel free to contact the undersigned at (713) 375-5503.
`
`Respectfully,
`
`/s/ Akayla Broussard
`
`Akayla Broussard
`Environmental and Regulatory Projects
`Corpus Christi Liquefaction, LLC
`
`
`cc: Mr. John Lesser – Federal Energy Regulatory Commission
`Ms. Nancy Fox-Fernandez – Federal Energy Regulatory Commission
`Mr. John Bugno – Federal Energy Regulatory Commission
`Ms. Janna Romaine Chesno – Cheniere Energy, Inc.
`Ms. Lisa Tonery – Orrick, Herrington & Sutcliffe, LLP
`
`
`
`
`
`

`

`
`
`
`
`
`Corpus Christi Liquefaction, LLC
`
`Stage 3 Project
`
`Implementation Plan D –
`Request to Commence Installation of Underground Piping
`November 2 Supplement
`
`
`CP18-512-000
`
`
`
`
`
`November 2, 2022
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`

`

`Corpus Christi Liquefaction Stage 3 Project
`FERC Docket No. CP18-512-000
`Request to Commence Installation of Underground Piping
`November 2 Supplement
`
`
`INTRODUCTION
`
`On November 22, 2019, the Federal Energy Regulatory Commission (“FERC” or “Commission”) issued an
`Order Issuing Authority Under Section 3 and Section 7(c) of the Natural Gas Act (“NGA”) (“Order”) granting
`the necessary authorization to Corpus Christi Liquefaction, LLC (“CCL”) and Cheniere Corpus Christi
`Pipeline, L.P. (“CCPL”) for the construction and operation of the Corpus Christi Liquefaction Stage 3 Project
`(“Stage 3 Project”).
`
`On October 20, 2022, CCL filed Implementation Plan-D to demonstrate compliance with Conditions 36, 44,
`47, 74, and 98 of the Order. CCL is herein submitting supplemental information in response to an information
`request from FERC dated October 26, 2022.
`
`CCL respectfully requests FERC’s authorization for Implementation Plan-D no later than November 14, 2022.
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`

`

`Corpus Christi Liquefaction Stage 3 Project
`FERC Docket No. CP18-512-000
`Request to Commence Installation of Underground Piping
`November 2 Supplement
`
`
`FERC comment received via email on October 26, 2022:
`
`FERC staff’s review of the October 20th filing for underground piping identified missing or deficient
`information. To facilitate our review of the underground piping, including line sizing, provide responses to the
`following and file response to the eLibrary docket:
`
`1. Provide detailed plot plans (or areas) of the ISBL and OSBL areas. Plot plans should label or tag all
`equipment and vessels in these areas.
`2. Provide piping specifications for all underground lines in the scope of this authorization request.
`3. Attachment 74, Section 3.5.1 makes references to Fire Water Demand Calculation Doc. No. 26290-
`100-U1C-3033-00001. This document was not included in the filing. Provide this document for FERC
`staff review.
`4. Condition 96 of the November 22, 2019 Order specifies active protection, passive protection, or a
`combination of the two for each significant component within the 4,000 Btu/ft2-hr radiant heat zone
`from pool or jet fires. Firewater would be component of active protection. Provide the quantitative
`analysis if available. Otherwise, explain how the design of the underground firewater system piping
`has the capacity to support adequate mitigation.
`
`
`
`CCL Response:
`
`1. Detailed plot plans for ISBL and OSBL areas are provided in Attachment 1A.
`2. Piping specifications for all underground lines within the scope of this approval are provided in
`Attachment 2A.
`3. Fire Water Demand Calculation, Document. No. 26290-100-U1C-3033-00001 is provided in
`Attachment 3A.
`4. Attachment 01 (Firewater Coverage Schedule) on page 13 of the Fire Water Demand Calculation
`provided in Attachment 3A above, provides a synopsis of the necessary fire water for the
`applicable equipment in order to satisfy NFPA 15 (2017) Cl 7.3.2 and Cl. 7.4.2. All necessary fire
`water coverage for the equipment that falls within the 4000 btu/ft2-hr thermal contour will be
`covered by the total sizing capacity of the Project fire water system which has a maximum
`capacity of 4,000gpm, and/or passive fire protection. The maximum capacity for the fire water
`ring main basis can be found in Table 7.3-1 ISBL Fire Zone -wise Fire Water Demand on page 8
`of the above referenced fire water demand calculation, which depicts the basis of one fire zone
`that requires five (5) fire water monitors and a hose allowance. This results in a capacity of
`3,500gpm. A margin is added on top of that total application need. As the 4,000gpm maximum
`capacity is higher than any fire water coverage need, the fire water underground pipe to be
`installed under this requested approval will be able to handle any scenario where active protection
`is needed.
`
`
`
`

`

`Corpus Christi Liquefaction Stage 3 Project
`FERC Docket No. CP18-512-000
`Request to Commence Installation of Underground Piping
`November 2 Supplement
`
`CCL proposes to demonstrate compliance with Condition 96, in the context of overall adequacy
`of active and passive mitigations, at a later date in association with filings related to fire and gas.
`
`
`
`

`

`Certificate of Service
`
`I hereby certify that I have this day served the foregoing document upon each person designated on the official service
`list compiled by the Secretary in this proceeding.
`
`Dated at Houston, Texas this 2nd day of November, 2022
`
`/s/ Akayla Broussard
`
`Akayla Broussard
`Corpus Christi Liquefaction, LLC
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket