`1SO NEW ENGLAND OPERATING PROCEDURE NO. 1
`
`APPROVED: July 28, 1983 by the NEPOOL Operating Committee
`REVISED: By NEPOOL Operating Committee,
`December 5, 1996 Effective When ISO NE assumes SPORT
`responsibilities
`REFERENCES: 1. Revised NEPOOL Agreement - Sections 10.1 and 11.1
`SATELLITE INSTRUCTIONS:
`AM1BEEI0N
`COpVER e JioEiAL MNEBOT BROTLATOBT O Dy L
`D] 237400, 555
`Maine: MNone Docket : ,_f' ke
`teew Hampshire: None fimmdl — g'f’"‘fi e anaen
`
`NEPOOL 4879
`
`
`
`
`
`
`
`
`D7 3188 FRI 15:07 FAX 413 535 4343 SEPEX ooz
`
`IS0 NEW ENGLAND OPERATING PROCEDURE NO. 1
`
`E DISP o PO R
`W EN R L.
`
`INTRODUCTION
`
`The NEPOOL Agreement Sections 10.1 and 11.1 assign responsibility for the day-to-day
`operation of the New England bulk power supply facilities to the Regional Marketing Operations
`Committee (RMOC) and the Regional Transmission Operations Commitiee (RTOC). These
`Regional Operations Commitees (ROC), acting through ISO New England, carry out their
`responsibility for day-to-day operations.
`
`Because central dispatch responsibilities are divided and/or shared between the ISO, the
`Satellites and Participants (Participant Dispatch/SCADA Centers, Generations Stations,
`Transmission stations), it is necessary to establish overal] responsibilines and authority. This
`procedure defines the overall parameters within which the more specific Operating Procedures
`can be formulated.
`
`PRENCIPLES
`
`The following principles are adopted. Appendix A expands upon the principles by
`assigning responsibilities to specific operational groups.
`
`1 150 New England is responsible 1o the ROCs for the day-to-day operation of the
`New England bulk power supply system in accordance with applicable
`procedures, criteria, rules and standards.
`
`2. Satellites have a responsibility o the Panicipants whose equipmenl they operale.
`Also, they have a responsibility to assist the ISO in meeting the objectives of
`central dispatch by carrying out instructions, orders and directions received from
`the 150,
`
`3. To most efficiently achieve the objective of central dispatch, it is necessary that
`
`the ISO. the Satellites and the Participants execute their responsibilitics with a
`spirit of cooperation and with an understanding of the tasks to be accomplished.
`
`NEPOOL 4854
`
`
`
`
`
`
`
`
`WisaLswae FRE LDIUY PARL L3 333 4343 REFEX &ooa
`
`GENERAL STATEMENT OF RESPONSIBILITIES
`
`IS0 New England is responsible to the ROCs and has the authority to act for them in
`matters pertaining to the central dispatch of all ransmission facilities rated 69KV and above and
`all generating facilities committed by NEPOOL Participants to central dispatch. This assigned
`responsibility and authority extends to include decisions, instructions, and orders issued 1o
`Satellites and Participant facilities verbally or in writing, as required for day-to-day, minute-1o-
`minute operation of both generation and transmission facilities.
`
`Satellites have a comprehensive responsibility for the secunty of all transmission
`facilities 69KV and above for specified regions within New England. Individual Satellite
`responsibilities include SCADA functions, security of lower voltage transmission facilities,
`coordination of station generation activities and switching and tagging of facilities not controlled
`by the operating Panicipants. These extended responsibilities are established by the individual
`Satellite’s member companies subject to the general provisions of this procedure.
`
`Each Participant shall, to the fullest extent practical, cause all transmission facilities rared
`69 KV or above owned or controlled by it and all generating facilities in which it has
`Entitlements, to be designed, constructed, maintained and operated in accordance with good
`utility practice. Participant facilities will also contribute to central dispatch in accordance wilh
`approved Operating Procedures, Criteria, Rules and Standards and 1SO New England
`Transmission Operating Guides.
`
`IS0 New England, the Satellites and Participants share a responsibility to initiate dispatch
`
`actions deemed necessary 1o prevent injury, loss of life, equipment damage, and/or service
`interruptions.
`
`NEPOOL 4831
`
`
`
`
`
`
`
`
`___07/31798 FRI 15:07 FAX 413 535 4343 NEPEX
`
`ifoo4
`
`Tahle of Contents
`
`TRANSMISSION OPERATION A-Z
`SECURITY ANALYSIS A-3
`ECONOMIC DISPATCH A-4
`AUTOMATIC GENERATION CONTROL (AGC) A-5
`CONTROL AREA INTERCHANGE AND INADVERTENT A-5
`CONTRACT ADMINISTRATION A-5
`CONVENTIONAL HYDRO AND PUMPED STORAGE OPERATION A-6
`INTERCONNECTION SCHEDULING A-B
`MAINTENANCE COORDINATION - GENERATION A-8
`GENERATOR TESTS AND AUDITS A-B
`OPERATING RESERVE A-9
`SYSTEM LOAD FORECASTING A-10
`THERMAL UNIT COMMITMENT A-10
`UNIT CONTROL MODES AND OPERATIONS LIMITS A-11
`BACK-UP FACILITIES A-12
`COMMUNICATIONS - DATA A-12
`COMMUNICATIONS - VOICE A-13
`
`DISPATCH COMPUTER AND PERPHERAL DISPATCH EQUIPMENT A-13
`
`NEPOOL 4832
`
`
`
`
`
`
`
`
`07/31/88 FRI 15:08 FAX 413 535 4343 NEFEX
`
`W N i3 PRO ;
`DISPATCH OPE d N Y
`| T P
`
`Consistent with the Principles and general responsibilities stated within the procedure
`and to assure the effectiveness of New England central dispatch through the IS0, the Satellites
`and Participant facilities, the following dispatch assignments are made. The listed assignments
`include most of the fundamental responsibilities of central dispatch but are not inclusive of all
`responsibilities assigned by the Regional Operations Committees. It is expected that these
`responsibilities will receive continual review and will be updated as needed to assure efficient
`operation of the power system.
`
`L. TRANSMISSION OFPERATION
`A. ISO New England
`
`Monitor power flows on all transmission facilities operating at 115 KV
`and above, all inter-Satellite ransmission facilities, all inter-pool
`transmission facilities and all facilities associated with pre-determined
`inter-area power flows.
`
`Initiate dispatch actions, including the commitment/decommitment and
`MW adjustment of generators, required to insure that the facilities noted in
`(1) above are operated in compliance with ISO New England Operating
`Procedures, 150 New England Critena, Rules and Standards and ISO New
`England Transmission Operating Guides.
`
`Direct voltage and reactive dispatch of facilities when normal schedules
`are unable to be maintained by one or more Satellites.
`
`Coordinate the Satellite implementation and restoration of load shedding,
`voltage reduction and system restoration following system disturbances .
`
`B. Satellites
`
`Monitor power flows on all transmission facilities including voltages
`below 115 KV and interconnection points associated with each satellite’s
`region.
`
`Dispatch voltage and reactive power of all facilities within the Satellite as
`long as normal schedules can be maintained. MW redispatch orders to
`A-2
`
`NEPOOL 4883
`
`@003
`
`
`
`
`
`
`
`
`WisalsEo PRI LDIUE FAA 413 BAL 4343 KREPFEX
`
`generating stations will be distnbuted through ISO New England unless
`emergency conditions or a mutual understanding with the ISO staff
`Jjustifies direct contact with the generation station.
`
`3 Dispatch all ransmission facilities radial, and/or operating below 115KV,
`if assigned that responsibility by its member Panticipants.
`
`4. Direct restoration of intra-Satellite transmission facilities in accordance
`with Satellite Operating Procedures, ISO New England Operating
`Procedures and ISO New England Criteria, Rules and Standards.
`
`3. Lead in communicating to ISO New England, dispatch actions required
`when Participants’ facilities require operation under a higher level of
`reliability than would be achieved within normal procedures.
`
`6. Assume other dispatch duties such as switching and tagging as agreements
`are reached between each Satellite and its members.
`
`1. Direct implementation and restoration of load shedding and system
`restoration following system disturbances as coordinated by ISO New
`England.
`
`8. Direct implementation and restoration of voltage reduction as coordinated
`by ISO New England.
`
`C. Participants
`
`L. Shall at all times be the sole judge as to whether or not and to what extent
`environmental conditions, equipment conditions andfor safety requires any
`facilities to be operated at less than full capacity or not at all,
`
`2 Assume responsibilities for local transmission facilities to the extent that
`the responsibility has not been transferred to a Satellite.
`
`Il SECURITY ANALYSIS
`A. IS0 New England
`
`1. Receive cutage applications for transmission facilities operating at 115KV
`and above unless declared as radial transmission facilities by ISO New
`England Operating Procedure #3. Evaluate, and approve or disapprove
`applications based on contingency analysis that will assure reliable
`operalion.
`
`A3
`
`NEPOOL 4884
`
`B oog
`
`
`
`
`
`
`
`
`07T/31/08
`
`.
`
`FEI 153:08 FAX 413 535 4243 NEPEX
`
`Monitor power flows on transmission facilities operating at 115KV and
`above unless declared as radial transmission facilities by ISO New England
`QOperating Procedure #3. Based on contingency analysis, initiate dispatch
`actions to assure reliable operation.
`
`B. Satellites
`
`1.
`
`[
`
`Receive generator and transmission outage applications. Evaluate
`applications based on contingency analysis to assure reliable operation.
`Disapprove any application that adversely impacts Satellite operations
`and/or deemed to be in violation of SO New England Criteria, Rules and
`Standards, ISO New England Operating Procedures and 1SO New England
`Transmission Operating Guides.
`
`Using contingency analysis, review unit commitrment schedules issued by
`IS0 Mew England to assure that the reliability standards specified by
`Satellite Operating Procedures, ISO New England Criteria, Rules and
`Standards, 150 New England Operating Procedures, and ISO New England
`Transmission Operating Guides are met.
`
`Monitor Power flows on all transmission facilities including voltages below
`115KV and interconnection points associated with each satellite's region,
`Inform ISO New England of any operating condition that has the potential
`to reduce reliability of the bulk power system below the level prescribed by
`Sarellite Operating Procedures. ISO New England Criteria, Rules and
`Standards, ISO New England Operating Procedures and 1SO New England
`Transmission Operating Guides,
`
`ECONOMIC DISPATCH
`A. IS0 New England
`
`Cemtinuously monitor the bulk power sysiem loading conditions and determine
`the most economical allocation of energy resources considering system frequency,
`system load, reserve, reliability, and other system specific requirements. ISO New
`England will improve economic dispatch through the purchase and sale of energy
`reserves from dispatchable contracts or Agreements with external control areas.
`
`A
`
`NEPOOL 4E85
`
`& oo7
`
`
`
`
`
`
`
`
`UT/31/88 FHI 15:09 FAX 413 535 4343 KEPEX
`V. M OL. A
`A. IS0 New England
`1. Maintain a sufficient number of generating units on AGC 1o satisfy
`
`reliability, economic and tie line regulation requirements. Units on AGC
`should be selected to achieve the best economics possible while
`mainizining system reliability and/or control performance.
`
`2 Supply AGC pulsing and setpoint directives to units under AGC on the
`approved Data Communications Network,
`
`Satellites or Participant/SCADA Centers
`
`Satellites or Participant/SCADA Centers with units that have been designated as
`required to provide automatic generation control, will supply or support a data
`communications facility that can receive set point or pulsing data from ISO New
`England and re-transmit the control signals to the individual unit controllers under
`the standards defined by Crileria Rules and Standards No, 13 (IS0 New England
`Metering and Telemetering Criteria) .
`
`V. CONTROL AREA INTERCHANGE AND INADVERTENT
`
`A, IS0 New England
`
`1. Schedule, monitor, and maintain the 1SO New England Control Area
`Interchange with HQ, NB and NYPP while adhering to NERC, NPCC and
`[SO Mew England system operating criteria.
`
`2 Forecast Inter-area transfer capabilities, consistent with scheduling
`peniods, (hourly, weekly, monthly) to be used as delimiters in the
`scheduling of inter-area transfers.
`
`VL CONTRACT ADMINISTRATION
`A. IS0 New England
`
`Monitor, schedule for delivery, andfor suspend available power contracts with
`other Control Areas and external non-Participants based upon contract availability
`criteria, the optimization of system economics and/or system reliability
`constraints.
`
`A-5
`
`NEPOOL 4886
`
`igoos
`
`
`
`
`
`
`
`
`Wisaiswa PRL Loiud PAL 4)d 535 4343 NEPEX
`
`VII. Co
`
`] P
`
`(DUTIES UNIQUE TO HYDRO PLANTS) (tentative)
`A. 150 New England
`
`1.
`
`Develop hourly energy schedules for the Moore, Comerford, Wilder and
`Harriman stations, based on the daily energy totals provided by
`Participant.
`
`Direct generation contro] of Connecticut and Deerfield River stations
`through the appropriate Panticipant river dispatch center,
`
`Provide economic dispatch schedules to stations that are managed by the
`owning company for which ISO New England schedules the energy.
`
`Develop weekly, daily, and hourly generation/pump schedules in
`conjunction with water resource management for Northfield Mountain and
`Bear Swamp.
`
`Schedule and monitor the hourly energy allocations for the Harris and
`Wyman stations based on period energy allocations supplied by the Maine
`Satellite.
`
`Issue generation control directive for the Maine hydro units through the
`Maine Satellite.
`
`Callect other hydro systems” hourly/daily generation totals from
`Participants, Satellites or SCADA cenlers to be incorporated into unit
`commitment, development of hourly real-time load and the interchange
`
`PTICINg processes.
`
`Develop hourly generation estimates for run-of-the-river hydro units, for
`the purpose of creating an input to unit commitment and the calculation of
`hourly real-time load, when such estimates are derived from historical
`plant averages.
`
`NEPOOL 4887
`
`@oos
`
`
`
`
`
`
`
`
`L 1
`
`FEI 15:08 FAL 413 535 43423 KEFEX
`
`Satellites (General)
`No special treatment for hydro units unless specified below.
`Maine
`
`1. Determine the daily energy allocation total for the Harris and Wyman
`stations,
`
`2 Schedule and manage the Maine river systems while utilizing the hourly
`Harris and Wyman station schedules supplied by ISO New England.
`
`3. Manage and operate all Maine miscellaneous hydro units.
`
`4, Supply IS0 New England with all its hydro unit limitations and
`COnsiraints,
`
`PSNH
`1. Manage and operate all New Hampshire hydro units,
`2. Supply ISO New England with all its hydro unit limitations and
`COnsiraints.
`REMVEC
`
`Maintain the remote “dump-the-pump™ capability for Bear Swamp used for
`system secunty/reliability.
`
`VELCO Dispaich/SCADA Center
`
`1. Provide hydro scheduling and data collection services for all the VELCO
`Participants.
`
`2. Manage and operate all VELCO miscellaneous hydro units.
`
`3, Supply ISO New England with all its hydro unit limitations and
`constraints.
`
`- Housatonic Hydro
`
`k. Manage the Rocky River, Shepaug, Stevenson, Derby plants. Supply ISO
`
`A-7
`
`NEPOOL 4888
`
`dolo
`
`
`
`
`
`
`
`
`07/31/88 FRI 15:10 FAX 413 535 4343 NEFEX
`
`New England, for central dispatch purposes, with 24 hour energy totals
`and operating limits for the same facilities.
`
`Supply ISC New England with hour by hour energy estimates for Falls
`Village and Buils Bridge.
`
`H. NEPCO (tentative)
`
`2,
`
`Manage the Connecticut and Deerfield River Systems.
`
`Supply ISO New England, for central dispatch purposes, with 24 hour
`energy totals and operating limits for Moore, Comerford, Wilder and
`Hamriman stations.
`
`Supply IS0 New England with hourly energy schedules and operating
`limits for all other NEPCO Connecticut and Deerfield River conventional
`hydro stations.
`
`Supply IS0 New England with hourly discharge (kefh) from Vemon and
`Deerfield No. 5.
`
`V. INTERCONNECTION SCHEDULING
`
`A, IS0 New England
`
`1.
`
`3
`
`IX. MAIN
`
`Develop and/or coordinate hourly, weekly, monthly, etc. interchange
`schedules for all interchange arrangements between NEPOOL and non-
`NEPOOL Participants. This includes Pool to Pool and Participant to/from
`non-Participant interchange arrangements.
`
`Incorporate all scheduled power contracts into the daily unit commitment
`process and communicate to all necessary external parties.
`
`Maintain a record by contract of interchange activity.
`
`DINATION - GENERATION
`
`A. IS0 New England
`
`Receive and administer requests for long and short term maintenance in
`accordance with ISO New England Operating Procedure No. 5 (Unit Outages).
`IS0 New England will forward requests 1o appropriate Satellites,
`
`A-8
`
`NEPOOL 4889
`
`@o11
`
`
`
`
`
`
`
`
`07731788 FRI 15:10 FAX 413 535 4343 XEPEX o1z
`
`B. Satellites (Gencral)
`
`Receive and study requests for shor term maintenance and recommend
`approval/disapproval to ISO New England.
`
`C. Maine
`
`The Maine Satellite will coordinare short term maintenance requests for all
`generators under their dispatch jurisdiction and forward all requests to ISO New
`England for final approval/disapproval.
`
`D. Paruicipants
`
`Participant personnel, excluding Maine companies, will submit requests for long
`and short term generator maintenance directly to designated 1S0 New England
`staff. Maine companies will submit requests for long term generator maintenance
`directly to ISO Mew England and short term requests will be coordinated by the
`Maine Satellite as noted in jtem IX C. above.
`
`X NER
`A. IS0 New England
`
`L. Initiate and administer Claimed Capability and Response Rate audits on
`Participant hydro and thermal generating units in accordance with ISO
`New England CRS #4 - Rating and Auditing Generating Capability and
`CR3 #9 - Response Rate Tests.
`
`2. Give authonzation for Participant initiated demonstrations.
`
`3. Assure that the appropriate Satellite is informed whenever a ISO New -
`England or Participant initiated Demonstration is scheduled.,
`
`XI. OPERATING RESERVE
`A, IS0 New England
`
`Maintain a sufficient amount of Operating Reserve in accordance with IS0 New
`England OF #8 - Operating Reserve. If available capacity is insufficient 1o
`provide adequate Operating Reserve, 1SO New England will implement the
`various Actions of ISO New England OP #4 - Action During a Capacity
`
`A-9
`
`NEPOOL 4830
`
`
`
`
`
`
`
`
`0730708
`
`FRI 15:10 FAX 413 535 4343 NEFEX
`
`Deficiency andfor ISO New England OP #7 - Action in an Emergency.
`Satellites
`
`Support ISO New England in maintaining the ISO New England Operating
`Reserve by implementing the various Actions of ISO New England OP #4 -
`Action During a Capacity Deficiency and/or ISO New England OP #7 - Action in
`an Emergency.
`
`XO. SYSTEM LOAD FORECASTING
`
`IS0 New England
`
`Forecast and update the present day's forecast of IS0 New England hourly loads
`for the purpose of wnit commitment and power contract scheduling,
`
`XM THERMAL UNIT COMMITMENT
`
`[SO New England
`
`1 Develop unit commitment/de-commitment schedules for all generators
`available for central dispatch.
`
`8 Supply the ISO New England Satellites, and a contact point declared by
`the lead Participant of dispatchable units with the most current unit
`commitment/de-commitment schedules.
`
`3. Coordinate activities between ISO New England, Satellite and Participant
`personnel on marters relative to the operation of the NEPOOL Participant
`generating facilities.
`
`Satellites
`
`Recommend changes to unit commitments or incremental loading of units for the
`purpose of maintaining area voltage, maintaining system stability, andfor meeting
`thermal transmission requirements. Requests will normally be made to ISO New
`England unless emergency conditions justify immediate communications with the
`generation staticns.
`
`Paricipant Dispatch/SCADA Centers
`
`Recommend changes to unit commitments or incremental loading of units to
`maintain area voltage and or to meet thermal transmission requirements. Requests
`
`A-1D
`
`NEPOOL 4891
`
`@o1z
`
`
`
`
`
`
`
`
`07/31/88 FRI 15:11 FAX 413 535 4343 NEPEX o1
`
`will normally be made to ISC New England unless emergency conditions justify
`immediate communications with the gencration stations.
`
`XTV. UNIT CONTROL MODES AND OPERATING LIMITS
`A. IS0 New England
`
`L. Maintain all unit control modes and operating limits on all units under IS-EI-
`' MNew England direct generation control.
`
`2. Maintain operating characteristics, such as heat rate curves, response rates,
`fuel price, ete. of all NEPOOL Panicipant generating units via the ISO
`New England Energy Management System andfor by communicating with
`specific generating units or the appropriate Satellite or Participant system
`operator,
`
`3 Compile and maintain all necessary information, as required by 1SO New
`England Billing to properly reflect all NABS limitations and constrainis,
`for generating units under IS0 New England direct generation control (see
`exceptions for Maine and PSNH listed in items C and D below).
`
`4. Notify appropriate Satellite(s) whenever 1SO New England identifies a
`generator resiriction or limitation that may affect System security.
`
`B. Satellites (General)
`I. Incorporate known generator operating restrictions into security analysis.
`
`2. Notify ISO New England whenever the Satellite identifies a generator
`restriction or limitation that may affect Sysiem security.
`
`C. Maine
`
`1. In conjunction with IS0 New England, monitor and update, as required,
`all unit control modes and operating limits of all Maine Satellite
`Eenerating units.
`
`2. Compile and maintain all necessary information, as required by ISO New
`England Billing, 1o properly reflect all NABS limitations and constraints,
`for generating units in Maine.
`
`D. PSNH
`
`NEPOOL 4892
`
`
`
`
`
`
`
`
`WisdlsHe
`
`FRL B5:0l]l FAL 413 535 4343 NEPEX
`
`XVI.
`
`Compile and maintain all necessary information, as required by ISO New England
`Billing, 1o properly reflect all NABS limitations and constraints, for hydro units
`controlled by the PSNH Satellite.
`
`NEPOOL Participant Generators
`
`Generators have an obligation to notify ISO New England directly o:r through an
`intermediary of all restrictions or limitations.
`
`BACK-UP FACILITIES
`
`IS0 New England
`
`1 Be responsible for supplying a back-up plan for all functions for which
`ISO New England is responsible.
`
`2. Supply or make arrangements for all necessary hardware/software to
`execute the plan required by (1).
`
`Satellites
`
`Supply a back-up plan and back-up hardware adequate to meet the Satellite's
`dispatch abligations.
`
`ATI
`
`IS0 New England
`
`Supply to the Data Communications Network, dispatch data that originates within
`or is collected by the ISO New England Energy Management System and is
`needed by the Satellites or Participant Dispatch/SCADA centers.
`
`Participants or Sate]lite
`
`Provide facilities 1o collect the real-time data required to perform central dispatch
`and place the data onto the ISO New England Data Communications Network
`either directly or indirectly through an intermediary such as a satellite. Criteria
`Rules and Standards No. 13 (ISO New England Metering and Telemetering
`Critenia) defines specific requirements.
`
`NEPOOL 4853
`
`Bo1s
`
`
`
`
`
`
`
`
`07/31/988 FRI 15:11 FAX 413 535 4343 KEPEX
`
`Rois
`
`XVIL COMMUNICATIONS -VOICE
`A. IS0 Mew England
`
`Provide the necessary voice communications required to disseminate centrel
`dispatch operational directives directly to wility owned and non-utility generating
`stations and units. Maine will act as an intermediary for units in Maine. Other
`Satellites or Participant Dispatch/SCADA centers may act as voice
`communications intermediaries, provided that ISO New England and the Satellites
`agree to the change, and that the speed and reliability offered by direct
`communications is not compromised.
`
`B. Satellites
`
`L. Issue security related MW dispatch orders to 150 New England. Under
`emergency conditions, and under all conditions for units in Maine, the
`appropriate satellite can initiate direct contact with the generalion station.
`
`2. Act as liaisons of dispaich orders fram 15O New England related o
`Dispatchable Loads.
`
`XVIL DISPATCH COMPUTERS AND PERIPHERAL DISPATCH EQUIPMENT
`
`A. 150 New England
`
`Be responsible for scheduling and coordinating of planned outages of 150 New
`England, Satellite, Participant Dispatch/SCADA operating computers, Data
`Communications Network, microwave communications channels, and any other
`equipment that deprives 1SO New England, the satellites or Participant of normal
`operating data, AGC pulsing capability or voice communications.
`
`OP-1-5PT-noc-approved doc
`
`NEPOOL 4894
`
`
`
`
`
`
`
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket