`August 8, 2006 Sl
`
`T Tl
`Mr. Marty Douglas 0l A 1y p 27
`Public Affairs Manager
`Eugene Water & Electric Board M e e
`500 East 4th Street Seil it e
`Eugene, OR 97401
`
`RE: Commenis on Carmen-Smith Hydroelectric Project Draft License Application
`FERC No. 2242
`
`[ have been closely following the DLA process for Carmen-Smith for some time. I had
`myself placed on the interested parties list to receive updates on the development of the
`license; 1 am a citizen of Eugene, EWEB rate payer, and civil/ structural engineer with 32
`years of experience. [ am interested that EWEB address environmental impacts caused
`by the project over the past 50 years to the highest possible extent. Please accept this
`letter of interest and place me on EWEB's interested parties list for DLA, FLA, and
`FERC and NEPA processes for project licensing.
`
`EWEB's mission statement for licensing is:
`
`"Obtain a new federal license for the Carmen-Smith Hydroelectric Project so that the
`project can continue o operate in an environmental, socially and economically
`sustainable manner."
`
`Throughout the draft license, EWEB tends to minimize the past and current
`environmental impacts of the project. In Exhibit "A" and elsewhere, EWEB calls the
`project a "run-of- the- river” hydroelectric project. Run-of-the-river hydroelectric plants
`use the power in river water as it passes through the plant without causing an appreciable
`change in the river flow. Carmen-Smith project dewaters approximately 7 miles of the
`main stem of the McKenzie River (via Carmen Diversion and tunnel) and dewaters
`approximately 3 miles of the Smith River (via Smith Dam and tunnel). This is in no way
`a run-of-the-river project and references that it is should be eliminated throughout the
`applicati
`
`The draft license application does not quantify what EWEB is proposing. The executive
`summary in Exhibit "A" provides of condensed list of proposed actions; there is no where
`in the document that I could find a detailed (or even simplified) description of the action
`proposed. In order words, it's an executive summary drawing on ... nothing, For
`example "Make one time payment for..." or "Develop plan to...(woody debris and ather
`enhancements)” are overly subjective. Make a $50,000 payment or $19.997 [s EWER
`
`
`
`
`
`
`
`
`Mr. Marty Douglas
`Page 2
`
`only planning to place woody debris, placing woody debris (or not), and how much? 1f
`the details of enhancements are buried in the Appendix E environmental reports, say
`where, develop reasonably understandable summary descriptions, and provide cost break
`down for and magnitude of work proposed.
`
`Currently EWEB is only proposing upstream fish and lamprey passage at Trail Bridge
`Dam. Downstream passage is "to be determined”. No up or downstream passage at
`Smith Dam and Carmen Diversion is proposed. Economics alone should not determine if
`populations of species behind dams not planned for any passage should continue to be
`isolated from others of its kind. No mention of the study of up and downstream fish and
`lamprey passage, environmental impacts, or costs has been provided for Carmen and
`Smith dams in the DLA. How can the public understand the decision not to provide
`passage? In a typical NEPA process, these critical issues would be fully addressed.
`Attached 15 a concept for Smith passage that [ believe has not been looked at for your
`information.
`
`EWERB is proposing to provide 200 cfs minimum year around flow in the Carmen by-pass
`reach and 1o divert excess over that amount to Smith Dam "to protect cut throat fish®. It
`is my undersianding that only very minimal studies have been performed on the Carmen
`by-pass reach. How does EWEB know 200 cfs is the correct amount? The resource
`agencies feel up to 350 cfs should be considered. How does EWEB know not bypassing
`higher flows would not be beneficial to Beaver March wetlands and/ or other species?
`Obviously, the more water bypassed, the less can be used for generation in the Carmen
`plant. Ramping of bypass flow may mitigate the effect on cut throat trout and provide
`
`EWEB 15 propasing to provide 20 efs minimum year around flow in the Smith by-pass
`reach. [ have all of the same comments as the Carmen by-pass. The flow is extremely
`minimal by any measure. In addition, there is no description of how the flow will be
`provided.
`
`In Trail Bridge Reservoir, draw down limits and pool and river ramping rates may have
`to be made more resirictive to protect fish. Sweetwater Creek needs year around fish
`passage from Trail Bridge Reservoir pool and is often stranded. These environmental
`improvements may require EWEB to generate less overall and peaking power from
`Carmen and Trail Bridge Plants.
`
`EWEB indicates that many envircnmental improvements may not be practical or cost
`effective. in terms of short term effects on species and cost. Much of this has to do with
`1) not listening to the resource agencies concerns, 2) the extremely conservative and non-
`innovative engineering EWEB is having performed, and 3) cost estimating inefficient
`designs. Some of these types of issues can be resolved by using underwater construction
`techniques, innovative design, input from experienced heavy civil contractors, and peer
`review. Itis my understanding that none of this is occurring for this crucial EWER
`project. I recommend that the resource agencies require or hire experienced consultant
`
`
`
`
`
`
`
`
`Mr. Marty Douglas
`Page 3
`
`peer review all of EWEB's preliminary engineering for fish passage, or EWEB provides
`it before it being excepted as fact by the resource agencies.
`
`In Exhibit "D", project finances, a better break down of costs is needed. I believe there is
`a blending of environmental and life extension costs. EWEB indicates that licensing will
`cost $65M. For example, where is the new proposed access road to Smith Dam; in fish
`
`and agquatic resources (environmental) or life extension improvements? One reason this
`
`is important is that the public needs to understand how much EWEB is spending on the
`
`environment and how much on normal and deferred O&M so that the total cost does not
`get represented as the environmental costs. [ don't think $20M to place worn out runner
`blades at Carmen Plant should be counted as an environmental licensing cost.
`
`In closing, the licensing of this project will probably not be win-win for EWEB in term of
`paying for environmental improvements by generation of more power to offset the cost. |
`believe EWERB may have to generate less power and pay a high cost for environmental
`enhancement, especially if EWEB continues to not listen to the resource agencies
`concemns, and not follow its mission statement for licensing.
`
`Ay & B
`
`2373 Washington Street
`Eugene, OR 97405
`
`C.C. M Sehs Feec -%.4,,:7;{., 2
`
`
`
`
`
`
`
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket