`Pacific Gas and
`flectric Company
`
`August 7, 2006
`
`Mr. Takashi Yamashita, Regional Director
`Federal Energy Regulatory Commission
`901 Market Street, Room 350
`San Francisco, CA 94103
`
`Re: Feather River Operations Inspections
`Transmission Line Information
`
`Dear Mr. Yamashita:
`
`245 Market Street
`San Fransiscu, o- 94705
`
`Maing Agarass
`Mal Cade N1a
`FY Re 77050
`Sat Frariiseg, C= 92177
`
`A gga
`
`Your July 13, 2006 letter concerning the 2006 operations inspections for the Rock Creek —
`Cresta and Bucks Creek Projects requested information on several transmission lines. These
`included not only the Bucks (FERC No. 619) and Rock Creek — Cresta (FERC no. 1962)
`projects but also several transmission line only licenses, including Woodleaf — Palermo TL
`(FERC No, 2281), French Meadows TL (FERC o, 2479) and Rollins TL FERC No. 2784).
`The attached table provides the transmission line information on these projects. The Rock
`Creek — Cresta Project has no transmission. The Pacific Gas and Electric Companypatrols
`transmission lines annually by air and performsa details inspection every five years.
`Vegetation is managed in compliance with California Public Resources Code 4293.
`
`Sincerely,
`
`Bill Zemke
`Senior License Coordinator
`
`Attachment
`
`dug \o,ten6
`
`
`
`Mr. Takeshi Yamashita
`August 7, 2006
`Page 2
`
`WEZemke (223-1646)(It ferc SFRO.doc)
`
`File copy: Project 619, 026.1192
`
`Attachment
`
`
`
`FERC Questionnaire on Transmission Line Information
`
`Forbestown
`Powerhouse”
`32,675°
`115 kV
`
`3793°
`60 kV
`
`[22,1007
`115 kv
`
`7 K
`
`anaka Junction
`
`Bucks Switch 135
`
`Drum-Grassvalley-
`Weimar 60 kV Junction
`POPp
`[Noid
`No
`
`
`
`Bucks Creek Project
`Rollins Powerhouse
`Woodleaf-Palermo
`
`FERCProject No. Tap FERC Project|FERC Project No. 619
`
`2281
`No. 2784
`
`
`
`Woodieaf-Kanaka Rollin Powerhouse Tap|Grizzly 115 kv Tap Line
`Transmission Line
`Name
`Junction & Forbestown
`
`
`Tap
`Source Powerhouse
`
`
`
`
`
`
`
`
`
`ROW Width
`
`Termination Point
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`River
`
`River
`
`
`
` Public Use Area
`
`"On May 16, 2000 FERCissued an Order Granting License Amendment and Revising Annual Charges [91
`FERC 962,111 (2000)] for the Woodleaf-Palermo Transmission Line. The portion of this line from Kanaka
`Junction to Palermo Substation was originally a project feature in Pacific Gas and Electric Company's
`Woodleaf-Palermo Minor Part License (FERC Project No. 2281-002) but is no longer considered a
`“primary transmission line.” On July 21, 2006, FERC issued an Order Amending License and Changing
`Project Name [116 FERC { 62, 057 (2006)} to Woodleaf-Kanaka Junction. An Application for a New
`License for the Woodleaf-Kanaka Junction transmissionline will be filed no later than March 31, 2007.
`? Woodleaf and Forbestown Powerhouses and Ponderosa Reservoir are Project features for FERC Project
`2088.
`3 Rollins Powerhouse is a Project feature for FERC Project 2266
`
`T-L Data 2006.doc
`
`
`
`French Meadows Transmission Line Project
`
`
`Transmission Length|VoltageSource i Termination Crossings
`
`
`
`
`Line Name|Powerhouse’|in Feet ‘of Point
`
`
`
`
`Meadows Powerhouse|American River5,659’ 185°
`
`
`
`American River
`
`
`
`Ralston
`37,450’
`Powerhouse
`American River
`
`Raison vaso’ |_|145"|Powsrhowe|amerizanRiver
`
`Ralston Powerhouse|American River37,450°
`
`
`
`
`
`Ralston- 188,245”|230 kVRalston Goldhill Highway 49,
`
`Goldhill
`Substation
`Rubicon River,
`South Fork
`American River,
`Commercial Rafting
`
`
`
`Ralston-Oxbow|Ralston 6,371 6OKV40"|Oxbow|Middle Fork
`
`Junction
`American River
`
`
`Oxbow- 27,185’|60kVOxbow Foresthill North Fork of the
`
`Foresthill
`;
`Substation
`Middle Fork
`
`
`
`“On May 16, 2000 FERC issued an Order Granting License Amendment and Revising Annual Charges [91
`FERC [62,112 (2000)] for the French Meadows Transmission Line. The Order amends the license deleting
`all transmission exceptfor the French Meadows 60 kV,the Ralston PH 230 kV tap and the Oxbow Ph 60
`kV tap. The order is effective when the Eldorado National Forest issues their land use authorization for the
`portion of these transmission lines located on National Forest System lands. The Eldorado National Forest
`has notissued their land use authorization.
`> Source powerhouses are project features for FERC Project 2079
`® The French Meadows 60 kV is a 60’ right of way. The Middle Fork-Ralston 230 kV, the Middle Fork-
`Ralston 60 kV and the French Meadows 60 kV occupya joint right of way 185’ in width, The Middle
`Fork-Raiston 230 kV and the Middle Fork-Ralston 60 kV occupya joint right of way 145’ in width, The
`Ralston-Goldhili 230 kV occupies a 100’ right of way. The Ralston-Oxbow 60 kV occupies a 40° right of
`way and the Oxbow-Foresthill 60 kV occupies a 40° right of way on National Forest system lands and a 60°
`right of way on private lands.
`
`T-L Data 2006.doc
`
`