`December 23, 2019
`
`Mr. John Spain, P.E., Regional Engineer
`Federal Energy Regulatory Commission
`Division of Dam Safety and Inspections
`New York Regional Office
`19 West 34th Street; Suite 400
`New York, NY 10001
`Via E-filing and Hardcopy
`
`CEll and Non-Internet Public Materials
`
`Emergency Action Plan Exemption Annual Review
`
`RE:
`
`
`
`Dear Mr. Spain:
`
`Chapter 6 (Emergency Action Plans) of the Commission’s “Engineering Guidelines for the
`Evaluation of Hydropower Projects” states (in section 6-2.2.7) that:
`
`“Licensees of projects exempt from filing an EAP must annually perform a field
`reconnaissance to verify if there were any changes to upstream and downstream
`conditions affecting the determination that no reasonably foreseeable project emergency
`would endanger life, health, or property (see Section 6-6.2).
`
`Licensees should also develop, maintain, post, and annually verify a contact list of people
`and organizations such as local emergency management authorities and upstream and
`downstream dam owners that will be called during flood events, if their dam is in danger of
`failing, or has failed (see Section 6-6.3).
`
`In accordance with 18 C.F.R., Part 12, Subpart C, § 12.21, by December 31 of each year,
`licensees of projects exempt from filing an EAP should send a letter to the Regional
`Engineer: (1) discussing the results of the field reconnaissance, (2) if appropriate,
`requesting a continuation of the exemption from filing an EAP, and (3) including, as a
`separate enclosure, the contact list along with a statement that the information provided
`was verified to be accurate.”
`
`On behalf of the licensees for the projects listed below, Brookfield Renewable Partners (BRP) is
`providing this letter to provide the Commission with the annual Emergency Action Plan (EAP)
`exemption review for these projects:
`
`• Bar Mills Project (FERC No. 2194), licensed to Brookfield White Pine Hydro LLC
`• Brunswick Project (FERC No. 2284), licensed to Brookfield White Pine Hydro LLC
`• Shelburne Project (FERC No. 2300), licensed to Great Lakes Hydro America, LLC
`• Lewiston Falls Project (FERC No. 2302), licensed to Brookfield White Pine Hydro LLC
`
`150 Main Street Tell: 207.755.5600
`Lewiston, ME 04240 www.brookfieldrenewable.com Fax: 207.755.5655
`
`
`

`

`
`
`• Gulf Island Project (FERC No. 2283), licensed to Brookfield White Pine Hydro LLC
`(Deer Rips and Andro 3 Developments only)
`• Gorham Project (FERC No. 2311), licensed to Great Lakes Hydro America, LLC
`• Shawmut Project (FERC No. 2322), licensed to Brookfield White Pine Hydro LLC
`• Williams Project (FERC No. 2335), licensed to Brookfield White Pine Hydro LLC
`• Sawmill Project (FERC No. 2422), licensed to Great Lakes Hydro America, LLC
`• Riverside Project (FERC No. 2423), licensed to Great Lakes Hydro America, LLC
`• Cataract Project (FERC No. 2528), licensed to Brookfield White Pine Hydro LLC
`• Bonny Eagle Project (FERC No. 2529), licensed to Brookfield White Pine Hydro LLC
`• Hiram Project (FERC No. 2530), licensed to Brookfield White Pine Hydro LLC
`• Milford Project (FERC No. 2534), licensed to Black Bear Hydro Partners, LLC,
`including the Milford Dam and Gilman Falls Dam
`• GLHA Storage Projects (FERC No. 2634), licensed to Great Lakes Hydro America LLC
`(Caucogomoc Development, Dole Pond Development, Harrington Lake Development,
`Long Pond Development, Loon Lake Development, Penobscot Lake Development,
`Ragged Lake Development, only, an EAP is in place for the Project’s Canada Falls and
`Seboomook Developments)
`• Penobscot Mills Project (FERC No. 2458), licensed to Great Lakes Hydro America
`LLC (East Millinocket Development only, an EAP is in place for the Project’s North Twin,
`Stone Dam, Dolby and Millinocket Lake Developments)
`• Lockwood Project (FERC No. 2574), licensed to Merimil Limited Partnership
`• West Enfield Project (FERC No. 2600), licensed to Bangor Pacific Hydro Associates,
`including the West Enfield Dam and Run Around Dam
`• Hydro Kennebec Project (FERC No. 2611), licensed to Hydro Kennebec LLC (dam
`and powerhouse only; an EAP is in place for the Project’s canal headgate structure)
`• Medway Project (FERC No. 2666), licensed to Black Bear Hydro Partners, LLC
`• Moosehead Project (FERC No. 2671), licensed to Kennebec Water Power Co,
`including the East and West Outlet developments
`• Orono Project (FERC No. 2710), licensed to Black Bear Hydro Partners, LLC; Black
`Bear SO, LLC; and Black Bear Development Holdings, LLC
`• Stillwater Project (FERC No. 2712), licensed to Black Bear Hydro Partners, LLC; Black
`Bear SO, LLC; and Black Bear Development Holdings, LLC
`• Pontook Project (FERC No. 2861), licensed to Pontook Operating Limited Partnership
`• Errol Project (FERC No. 3133), licensed to Brookfield White Pine Hydro LLC; and Errol
`Hydroelectric Co., LLC
`
`
`
`Project Exemption Reviews
`
`BRP personnel routinely evaluate the conditions upstream and downstream of the projects listed
`above, which are exempt from filing an EAP. As a result of these field reconnaissance
`evaluations during 2019, no changes were identified upstream or downstream of these facilities
`that would reasonably be expected to adversely affect public health, safety or property in the
`event of a dam failure emergency at these projects. Therefore, BRP is not aware of any changes
`that would affect the hazard potential classification of any of these structures, and BRP thus
`requests a continuation of the exemptions from filing EAPs for the subject projects.
`
`150 Main Street Tell: 207.755.5600
`Lewiston, ME 04240 www.brookfieldrenewable.com Fax: 207.755.5655
`
`
`

`

`Contact List Verification
`
`
`
`EAPs flowcharts were developed for all low and significant hazard projects as part of the BRP’s
`efforts for continual improvement in the area of public safety. Contact lists to be used in the
`event of a dam failure emergency have been established for each of the subject projects.
`Updated notification flowcharts for all Projects were submitted under separate cover on
`December 23, 2018 and were verified to be accurate.
`
`If you have any questions regarding our EAP program, please contact Ernie Deluca at (207)
`755-5619 or ernest.deluca@brookfieldrenewable.com.
`
`Sincerely,
`
`
`
`Kelly Maloney
`
`Licensing and Compliance Manager
`
`Attachments
`
`Cc: S. Michaud, N. Stevens, K. Murphy, J. Seyfried, P. McDonough, M. Swett, J. Cole, J. Rancourt,
`E. Thone, S. Gregg, B. Brochu, M. Craig, J. Auser, J. Clere, M. Pelletier; C. Karam, S. Hofacker,
`BREG
`
` BREG File: 0000 FERC General
`
`
`
`
`
`
`
`150 Main Street Tell: 207.755.5600
`Lewiston, ME 04240 www.brookfieldrenewable.com Fax: 207.755.5655
`
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket