`Office of Energy Projects
`Division of Dam Safety and Inspections – New York Regional Office
`19 West 34th Street, Suite 400
`New York, NY 10001
`
`Telephone No. (212) 273-5900
`
` Fax No. (212) 631-8124
`
`In reply refer to:
`P-2738-NY, Saranac River Project
`NATDAM ID Nos. NY00247, NY00225,
`NY00234
`P-2835-NY, Rainbow Falls
`NATDAM ID No. NY00240
`
`March 6, 2024
`
`VIA Electronic Mail
`
`Richard Ayling, P.E.
`Lead Engineer, Hydro Engineering
`Rochester Gas & Electric Corporation
`richard_ayling@rge.com
`
`Subject:
`
`Saranac River Project (FERC No. 2738) and Rainbow Falls Project
`(FERC No. 2835) Design Documents
`
`Dear Mr. Ayling:
`
`By letter dated September 11, 2023, you submitted design documents for the High Falls,
`Cadyville and Kent Falls Developments of the Saranac River Project and Rainbow Falls
`Project for the following proposed construction:
`
`Installation of access stairs at Saranac River near the High Falls Development.
`•
`• Regrading in front of the powerhouse main door and construction of sidewalk
`slab, and regrading of vehicle parking area and construction of concrete slab at
`the Kents Falls Development.
`• Access road improvements and construction of new concrete slab within vehicle
`access area and debris stockpiling area at the right abutment of the Cadyville
`Dam.
`Installation of access platforms at the fish bypass flume and debris flume at the
`Kent Falls Development.
`Installation of access platforms at the fish bypass flume and debris flume at the
`Rainbow Falls Project.
`
`•
`
`•
`
`
`
`P-2738-NY and P- 2835-NY
`
`
`
`
`
`Our review of the design drawings find that the proposed work would not affect the safety
`of the project structure, or the adequacy of the project works to perform their intended
`functions.
`
`You are reminded to obtain permits and concurrence for the proposed construction from
`all necessary state and federal resource agencies. Any drawdown of the headpond levels or
`modifications of the operation modes should be coordinated with the agencies to address
`any potential environmental concerns. Please note that if any changes are made that result
`in the modification of project operations, it is also your responsibility to coordinate these
`changes with FERC.
`
`Your cooperation and continued interest in dam safety are appreciated. If you have any
`questions, please contact Mr. Eyob at (212) 273-5929 or email at mussie.eyob@ferc,gov.
`
`Sincerely,
`
`
`
`John Spain, P.E.
`Regional Engineer
`
`
`
`
`
`
`
`2
`
`