PUBLIC SAFETY PLAN
`
`NEWBURY HYDROELECTRIC PROJECT
`FERC PROJECT NO. 5261-VT
`
`
`
`
`
`
`
`
`
`
`
`
`Green Mountain Power Corporation
`2152 Post Road Rutland, VT 05701
`
`November 2022
`
`
`
`
`
`

`

`Introduction
`
`1.0
`
`The Newbury Hydroelectric Project (Project), located on the Wells River in Orange County,
`Vermont was issued a new license by the Federal Energy Regulatory Commission (FERC)
`on September 8, 1983. The Project (FERC No. 5261) is located in the Town of Newbury,
`Vermont. The Project is owned and operated by Green Mountain Power Corporation
`(GMP).
`
`This revised plan is focused on the safety of the general public and does not address worker
`safety issues related to project operation.
`
`2.0
`
`Project Description
`
`The Project consists of the following facilities: (1) a 76’ long concrete gravity dam founded
`on bedrock, with a maximum height of approximately 20’, and a 5’ diameter inflatable
`spillway; (2) an 11.4 acre reservoir with a normal surface elevation of 563.87 feet USGS
`datum; (3) one intake with an external trashrack and a head gate in the right abutment; (4)
`one 400’ long, 5’ diameter steel penstock not externally observable; (5) one powerhouse
`containing a single turbine; (6) one minimum flow bypass with a single turbine; (7) one
`substation; and (8) appurtenant facilities. The locations of the primary project components
`are shown in Attachment 1, Sheet S1.
`
`The primary public use of Project facilities is recreational and generally limited to fishing.
`
`Existing recreational facilities include:
`• Warning signs
`• Project information signs
`
`
`Access to the site is via US Route 302 (Mill Street). There is no public parking area at this
`facility.
`
` A
`
` boat barrier is located upstream of the dam. Warning signs for the dam are posted on
`both sides of the river upstream of the boat barrier. There is no delineated canoe portage
`path due to difficult downstream river access.
`
`Access to the intake is limited by a chain link fence and a locked gate. Various warning
`signs are posted in this area.
`
`The Newbury powerhouse is located on the right side of the river in an old factory building
`approximately 400 feet below the dam. Public access to the station is limited by a locked
`door. A sign warning of rapidly rising water is posted at the tailrace. Access to the turbine
`on the minimum flow bypass is limited by a chain gate and warning signs. The control
`building for this unit has a locked door and various warning signs.
`
`
`

`

`Public Safety Measures
`
`The facility substation consists of pole mounted transformers near the powerhouse. Various
`warning signs are posted.
`
`
`3.0
`
`GMP will operate and maintain the safety measures described in this plan to ensure the
`safety of the public utilizing recreational and other areas of the Project. Safety measures
`include fences with locking gates; warning and informational signs; and a boat barrier.
`Safety measures at existing project features are detailed in the following table. Site aerial
`photographs showing the locations of safety features and signage are shown in Attachment
`1 on Sheets S1 and S2.
`
`Table 1: Public Safety Measures
`
`
`Location
`Dam and Spillway
`
`Substation
`Intake Structure
`
`Powerhouse
`
`Tailrace
`Recreation Area
`
`Installed Safety Measures
`Chain link fence with a locked
`gate
`Boat barrier and warning signs
`Warning signs
`Chain link fence with a locked
`gate
`Boat barrier and warning signs
`Locked door
`Project sign
`Warning sign
`Boat barrier
`Warning signs
`
`Reference Sheet ID
`S1, S2
`
`S1, S2
`S1, S2
`
`S1, S2
`
`S1, S2
`S1, S2
`
`

`

`ATTACHMENT 1
`
`DRAWINGS
`
`S1
`S2
`
`Newbury Public Safety Plan (1)
`Newbury Public Safety Plan (2)
`
`

`

`
`
`
`
`
`
`
`
`
`
`
`
`
`Minimum Flow Unit
`
`Dam with Inflatable
`Rubber Spillway
`
`Control Room
`
`Boat Barrier
`
`Intake
`
`Headgate
`
`UPDATED: NOVEMBER 2022
`
`Tailrace
`
`Substation
`
`Powerhouse
`
`Approximate Route of
`Buried Penstock
`
`
`
`
`
`
`
`
`N
`
`GREEN MOUNTAIN POWER CORP.
`NEWBURY HYDROPOWER PROJECT
`NEWBURY, VERMONT
`
`PUBLIC SAFETY
`PLAN
`
`
`
`PROJECT FACILITIES
`
`SHEET S1
`
`

`

`
`Description
`
`Danger
`Dam Ahead
`
`Danger
`Keep Away From Dam
`
`Danger
`No Trespassing
`
`Danger
`No Swimming
`Severe Undercurrent
`
`Danger
`Authorized Personnel Only
`
`GMP Project Sign
`
`Danger
`Keep Away
`Dam Ahead
`
`Danger
`High Voltage
`
`Danger
`High Voltage
`Keep Away
`
`
`
`
`
`
`Sign #
`
`
`
` 1
`
`
`
`
`
` 2
`
`
`
`
`
` 3
`
`
`
`
`
` 4
`
`
`
`
`
`
` 5
`
`
`
`
`
`
`
` 6
`
` 7
`
`
`
`
`
`
` 8
`
`
`
`
`
` 9
`
`
`
`
`
`
`Wood Fence
`
`Wire Fence
`
`Pole Mounted Transformers
`
`Warning Sign #9
`
`Chain Gate with
`Warning Sign #5
`
`Warning Sign #8
`
`Warning Sign #1
`
`Powerhouse with Locked Door and Sign #6
`
`Chain Link Fence
`
`Warning Sign #3
`
`Control Building with Locked
`Door and Warning Signs #3, 5
`
`Warning Sign #7
`
`Sign #6
`
`Boat Barrier
`
`Warning Signs #3, 4
`
`Warning Sign #2
`
`Locked Gate
`Warning Sign #3
`
`
`
`
`
`
`N
`
`GREEN MOUNTAIN POWER CORP.
`NEWBURY HYDROPOWER PROJECT
`NEWBURY, VERMONT
`
`PUBLIC SAFETY
`PLAN
`
`PUBLIC SAFETY MEASURES
`
`SHEET S2
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`UPDATED: NOVEMBER 2022
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket