throbber
Historical Perspective BOEING FRONTIERS
`
`A step
`to the moon
`
`DC-X experimental lander set up Boeing for future NASA work
`By Ed MEMi
`
`You probably remember the Apollo lunar lander from the
`
`1960s. But did you know that Boeing has more recent expe-
`rience with this type of space vehicle? McDonnell Douglas,
`a Boeing predecessor company, built the Delta Clipper–
`Experimental DC-X, a prototype experimental lander, and the
`more-advanced Clipper Graham DC-XA vehicle. Boeing will
`put that expertise to good use when it competes to build the
`United States’ next lunar lander in 2011 or 2012.
`The DC-X program was an unmanned prototype of a reusable
`single-stage-to-orbit launch vehicle. The one-third-scale DC-X was
`never designed to achieve orbital altitudes or velocity. Instead, it
`was meant to demonstrate various flight concepts, such as verti-
`cal takeoff and landing and responsive operations.
`McDonnell Douglas received its DC-X contract on Aug. 16,
`1991, from the U.S. Department of Defense’s Strategic Defense
`Initiative Office; the contract was taken over by NASA’s Marshall
`Space Flight Center when it became the DC-XA program.
`The cone-shaped 42-foot (12.8-meter) DC-X and DC-XA vehi-
`cles were assembled in Huntington Beach, Calif., with test flights
`taking place at the White Sands Missile Range, N.M. The DC-XA
`was a lighter-weight version of the DC-X that relied on the use of
`more-advanced technologies to provide improved performance.
`
`‘VERY COMPLEx SYSTEMS’
`The DC-X conducted its first of eight test flights on Aug. 18,
`1993, while another four flights were flown under the DC-XA pro-
`gram. The flights lasted from 59 to 142 seconds, and the highest al-
`titude was 10,300 feet (3,140 meters).
`“Rocket-powered vertical landers are very complex systems, and
`we have a really deep understanding of how those systems work,”
`said James Ball, who was on the original DC-X proposal team and
`eventually went on to lead the DC-XA software team. Ball, now a
`Boeing manager for the flight function at Huntington Beach, noted
`that the lunar lander was a simpler vehicle than the DC-X; for ex-
`ample, the DC-X featured four engines, while previous landers had
`just one.
`The DC-X demonstrated that aircraft-like operations are possible
`using rocket-powered reusable vehicles. “The vehicle flew forward,
`backward, sideways and could hover. Most vehicles don’t do that,”
`said Dan Nowlan, a Boeing technical fellow who was the DC-X
`guidance, navigation and control lead.
`
`There were also a host of performance requirements for the
`vehicle, which used innovative fuel-tank technologies such as
`lightweight composite tanks, lines and valves. The DC-X pro-
`gram featured new propulsion technologies such
`as gaseous oxygen and hydrogen roll-control
`thrusters. Other innovations included an auton-
`omous checkout to include leak detection and
`isolation. These technologies can be directly
`applied to future lunar lander designs.
`One of the objectives of the test program
`was to demonstrate that the DC-X had a robust,
`adaptive vehicle design. During the fifth test
`flight, a portion of the side of the vehicle was
`damaged, but the design was so robust that the
`vehicle was able to land safely. Lt. Col. Jess
`Sponable, Single Stage Rocket Technology
`program manager for the Ballistic Missile
`Defense Organization, was quoted in a com-
`pany press release saying, “This anomaly
`resulted in successful demonstrations of sev-
`eral important firsts: executing the autoland
`sequence demonstrating an ‘aircraft-like’
`abort mode; landing on the gypsum (des-
`ert ground), demonstrating the ability to
`land future vehicles virtually anywhere;
`and demonstrating the system’s tough-
`ness and robustness, since the DC-X
`continued to fly despite the aeroshell
`damage.”
`During another test flight, a vehicle
`fire destroyed a control flap, but the ve-
`hicle was repaired in time for its next test
`flight. On test flight three, the vehicle sur-
`vived a propellant helium bubble during
`liftoff and autonomously recovered
`
`the Mcdonnell douglas dc-X blasts off from
`the desert at White Sands Missile range, n.M.
`the dc-X needed only two years from contract
`award to first flight.
`McdonnELL dougLaS photo
`
` AUGUST 2008 BOEING FRONTIERS
`8
`8
`
`Space Exploration Technologies; NEW PETITION
`Exhibit 1014
`Page 1 of 2
`
`

`

`Historical Perspective BOEING FRONTIERS
`
` DC-X
`Tale of the tape:
`
`Height: 42 feet (12.8 meters)
`Diameter: 13 feet 4 inches at base (4.06 meters), conical
`shape
`Weight empty: 20,000 pounds (9,072 kilograms)
`Weight with full load of propellants: 41,600 pounds
`(18,869 kilograms)
`Propellants: Liquid oxygen and liquid hydrogen
`Engines: Four RL-lOA5 rocket engines, each
`generating 13,700 pounds (6200 kilograms) thrust.
`Reaction Controls: Four 440-pound-thrust
`(200-kilogram-thrust) gaseous oxygen, gaseous
`hydrogen thrusters
`
`Workers pose under the dc-X following its
`rollout from the factory floor in huntington
`Beach, calif. the dc-X spacecraft dem-
`onstrated that aircraft-like operations are
`possible using rocket-powered reusable ve-
`hicles and pioneered the use of lightweight
`composite fuel tanks, lines and valves with
`potential for future lunar landers.
`McdonnELL dougLaS photo
`
`control, demonstrating the equivalent of an
`engine-out capability. “This showed how
`the DC-X’s highly adaptive flight-control
`system could adjust to an unplanned ma-
`neuver and save the vehicle,” Ball said.
`
`‘FLY A LITTLE, BREAK A LITTLE’
`The DC-X was designed for reliability,
`maintainability, supportability and operabil-
`ity. Given the uncertainties of the design, the
`plan was to produce a deliberately simple test
`vehicle and to “fly a little, break a little” to
`gain experience with a fully reusable quick-
`turnaround spacecraft. Demonstration objec-
`tives included a 7-day turnaround between
`flights with a 3-day goal and use of 50 or
`fewer on-vehicle maintenance personnel.
`The program achieved a 26-hour turn-
`around with 10 maintenance personnel.
`“My heroes during the flights were the
`operations and maintenance folks. They
`did amazing things in turning this vehicle
`around in terms of repairs and doing things
`quickly,” Nowlan said. The DC-X program
`flew with a total field-support team of only
`25 engineers and technicians.
`The DC-X used fast-track management
`rules for the $60 million contract. Nowlan
`said one of the reasons for success was
`the reliance on system-level, end-to-
`end testing to spot problems before each
`flight. Independent reviewers were im-
`pressed with the speed with which prob-
`lems were addressed and resolved. “The
`reason DC-X was successful was because
`of our customer commitment to rapid pro-
`totyping principles and our internal pro-
`gram management,” Nowlan said.
`Even with these achievements in flight,
`prototyping and program management, one
`of the program’s most significant techni-
`cal advances was its streamlined software-
`development process. This helped increase
`efficiency over previous systems and great-
`ly cut support-infrastructure requirements
`during test flights. “We literally could turn
`around software in small fractions of what
`it takes to launch current systems,” Ball
`said. Echoed Don Barnes, a Boeing Ares
`I engineer who was a DC-XA stress en-
`gineer for the first use of a composite hy-
`drogen tank in the spacecraft: “We did not
`have much in way of paperwork—which I
`liked, since it was such a fast-paced devel-
`opment program.” n
`edmund.g.memi@boeing.com
`
`BOEING FRONTIERS AUGUST 2008 9
`
`Space Exploration Technologies; NEW PETITION
`Exhibit 1014
`Page 2 of 2
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket