throbber
R1-081711
`
`
`
`
`
`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`Agenda item
`3
`Title:
` Final Report of 3GPP TSG RAN WG1 #52bis v1.0.0
`
`
`(Shenzhen, China, 31 march – 4 April, 2008)
`Document for:
` Approval
`Source:
`
`MCC Support
`
`
`
`
`
`
`
`Fact Summary
`Meeting:
`Dates:
`Venue:
`Host:
`Attendees:
`Documents:
`
`3GPP TSG RAN WG1 #52bis
`31st March through 4th April, 2008
`Intercontinental Shenzhen, CHINA
`ZTE Corporation
`199 delegates
`542 (including some withdrawn and post-meeting artefacts)
`
`Patrick Mérias
`ETSI Mobile Competence Center
`F-06921 Sophia Antipolis Cedex
`Tel: +33 4 92 94 42 06
`
`Patrick.merias@etsi.org
`
`1
`
`
`
`
`
`Samsung Exhibit 1019, Page 1
`
`

`

`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`Table of contents
`
`
`
`R1-081711
`
`
`Executive summary ......................................................................................................................................... 4
`1. Opening of the meeting ........................................................................................................................ 6
`1.1
`Call for IPR ....................................................................................................................................................... 6
`2.
`Approval of the agenda ......................................................................................................................... 6
`3.
`Approval of the minutes from previous meeting ............................................................................... 6
`4.
`Liaison statement handling .................................................................................................................. 7
`5. Maintenance of UTRA Release 99 – Release 8 ............................................................................. 14
`6. Maintenance of Evolved UTRA and UTRAN ................................................................................... 18
`6.1
`Finalization of TS 36.211 .............................................................................................................................. 18
`6.1.1
`Downlink reference signals .................................................................................................................... 18
`6.1.2
`Uplink reference signals ......................................................................................................................... 22
`6.1.3
`Downlink Control Signaling .................................................................................................................... 23
`6.1.4
`Uplink Control Signaling ......................................................................................................................... 31
`6.1.5
`Mapping of virtual resource blocks to physical resource blocks ....................................................... 38
`6.1.6
`Remaining issues for TDD and FDD HD .............................................................................................. 39
`6.1.7
`Other remaining issues for 36.211 ........................................................................................................ 41
`6.2
`Finalization of TS 36.212 .............................................................................................................................. 41
`6.3
`Finalization of TS 36.213 .............................................................................................................................. 42
`6.3.1
`Timing synchronization ........................................................................................................................... 43
`6.3.2
`UL/DL Power Control .............................................................................................................................. 43
`6.3.3
`Inter-cell Interference Coordination ....................................................................................................... 47
`6.3.4
`RACH timing and preamble sequence selection ................................................................................ 49
`6.3.5
`UE Procedures for downlink shared channel ...................................................................................... 50
`6.3.6
`UE Procedures for uplink shared channel ........................................................................................... 56
`6.3.7
`Remaining issues for TDD and FDD HD .............................................................................................. 57
`6.3.8
`Other remaining issues for 36.213 ........................................................................................................ 58
`6.4
`Finalization of TS 36.214 .............................................................................................................................. 59
`6.5
`Finalization of TS 36.306 .............................................................................................................................. 59
`
`2 2
`
`Samsung Exhibit 1019, Page 2
`
`

`

`R1-081711
`
`
`
`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`7
`Enhanced Uplink for CELL_FACH State in FDD ............................................................................ 60
`8.
`HS-PDSCH serving cell change enhancements............................................................................. 62
`9.
`Study Item on Dual-Cell HSDPA Operation ..................................................................................... 63
`10. 64QAM for 1.28 Mcps TDD HSDPA ................................................................................................. 65
`11. Enhanced CELL_FACH state in 1.28 Mcps TDD (UL/DL) ............................................................ 66
`12. Continuous Connectivity for packet data users for 1.28Mcps TDD ............................................. 67
`13. Study Item on Scope of future HSPA Evolution for 1.28Mcps TDD ............................................. 67
`14. Closing of the meeting ........................................................................................................................ 68
`Annex A: List of participants at RAN1 #51 .............................................................................................. 69
`Annex B: TSG RAN WG1 meetings in 2008 .......................................................................................... 70
`Annex C: List of CRs agreed at RAN1#51 .............................................................................................. 71
`Annex D: List of Outgoing LSs from RAN1#51 ...................................................................................... 73
`Annex E: List of Tdocs at RAN1 #51 ....................................................................................................... 75
`Annex F: List of actions ............................................................................................................................. 76
`
`3 3
`
`
`
`Samsung Exhibit 1019, Page 3
`
`

`

`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`
`
`
`R1-081711
`
`Executive summary
`3GPP TSG WG RAN1 #52bis meeting took place at Intercontinental Shenzhen, CHINA.
`
`The meeting started at 9:20 on Monday 31st March and finished at 17:30 on Friday 4th April 2008.
`
`
`
`The week was scheduled as follows:
`
` Monday: Common session on Agenda items 1, 2, 3, 4, 6.1, 6.1.1 and 6.1.2.
`
` Tuesday: Agenda items 6.1.6, 6.3.7, 6.3, 6.3.6 and 6.1.3.
`
` Wednesday: Agenda items 6.3.4, 6.3.2 and 6.1.4.
`
` Thursday morning: Main room (España) DVRB (AI 6.1.5), Channel coding (AI 6.2), UE categories (AI 6.5)
`chaired by Sadayuki Abeta. Breakout room (Madrid 3) HSPA FDD (AI 5) chaired by Dirk Gerstenberger.
`
` Thursday afternoon: Main room (España) CQI (AI 6.3.5) chaired by Juho Lee. Breakout room (Madrid 3)
`HSPA FDD (AI 7, 8 and 9) chaired by Dirk Gerstenberger.
` Breakout room (Madrid 8) Drafting sessions on
`TBS Table, Downlink RS issues, UL SRS
`
` Friday morning: Agenda items 6.3.3, and revisions on 4 and 5.
`10, 11, 12 and 13) chaired by Sadayuki Abeta.
`
`Breakout room (Madrid 3) HSPA TDD (AI
`
` Friday afternoon: Revisions
`
`
`
`The list of action points that required RAN1 close follow-up is listed in Annex F (end of document).
`
`
`
`The number of contribution documents for this meeting was 518, and those documents were categorized as followed.
`
`Agenda Item
`Liaison statement handling
`Maintenance of UTRA R99 – Rel8
`Maintenance of Evolved UTRA and UTRAN
`Enhanced Uplink for CELL_FACH State in FDD
`HS-PDSCH serving cell change enhancements
`Study item on Dual-Cell HSDPA Operation
`64QAM for 1.28Mcps TDD HSDPA
`Enhanced CELL_FACH in 1.28Mcps TDD (UL/DL)
`Continuous Connectivity for Packet Data users for
`1.28Mcps TDD
`Study Item on Scope of future HSPA Evolution for
`1.28Mcps TDD
`
`Input
`Document
`34
`38
`386
`17
`5
`17
`4
`7
`5
`
`Discussed
`Document
`34
`38
`130
`17
`5
`17
`4
`3
`4
`
`5
`
`5
`
`
`
`4 4
`
`Samsung Exhibit 1019, Page 4
`
`

`

`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`The following set of documents is missing. The corresponding contributions have not been handed over by companies.
`
`
`
`R1-081711
`
`R1-081238
`
`Timing for Enhanced Uplink in Cell_FACH
`
`Samsung
`
`R1-081252
`
`PHICH resource allocation in TDD
`
`LG Electronics
`
`R1-081277
`
`Remaining details on UL DM RS hopping pattern generation
`
`Motorola
`
`R1-081288
`
`CCE Sizing
`
`R1-081300
`
`Remaining details on Nd=2 DVRB operation
`
`R1-081315
`
`Mapping of precoded WB CQI to non-precoded WB CQI
`
`R1-081319
`
`Disscussion on the inter-cell interference for EUL
`
`Motorola
`
`Motorola
`
`Motorola
`
`HUAWEI
`
`R1-081333
`
` CCE Size Selection and the Hashing Function
`
`Freescale Semiconductor
`
`R1-081350
`
`DTX/DRX aspect for 1.28Mcps TDD CPC
`
`TD Tech
`
`R1-081368
`
`Blind decoding for PDCCH
`
`Texas Instruments
`
`R1-081397
`
`Details of the Common and UE Specific Search spaces
`
`NEC Group
`
`R1-081505
`
`Hashing function for starting-point of UE-specific search space
`
`Philips
`
`R1-081554
`
`PMI bit length for EUTRA TDD
`
`R1-081627
`
`DVRB To PRB Mapping
`
`R1-081689
`
`Block-Code for CQI on PUSCH
`
`
`
`Via Technology
`
`ZTE
`
`Marvell
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`(R1-081412)
`
`
`
`5 5
`
`Samsung Exhibit 1019, Page 5
`
`

`

`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`
`
`
`R1-081711
`
`Opening of the meeting
`1.
`Mr. Dirk Gerstenberger (RAN1 Chairman) welcomed the participants to the 52bis RAN WG1 meeting and opened the
`meeting at 09:20.
`
`Mr. Zhisong Zuo from ZTE Corporation welcomed the delegates on behalf of the Chineese Friends of 3GPP.
`
`Call for IPR
`1.1
`The Chairman drew attention to Members’ obligations under the 3GPP Partner Organizations’ IPR policies. Every
`Individual Member organization is obliged to declare to the Partner Organization or Organizations of which it is a
`member any IPR owned by the Individual Member or any other organization which is or is likely to become
`essential to the work of 3GPP.
`
`
`The attention of the members of this Technical Specification Group is drawn to the fact that 3GPP
`Individual Members have the obligation under the IPR Policies of their respective Organizational Partners
`to inform their respective Organizational Partners of Essential IPRs they become aware of.
`
`The members take note that they are hereby invited:
`
`
`
`
`
`
`
`2.
`
`to investigate in their company whether their company does own IPRs which are, or are likely to become
`Essential in respect of the work of the Technical Specification Group.
`
`to notify the Director-General, or the Chairman of their respective Organizational Partners, of all
`potential IPRs that their company may own, by means of the IPR Statement and the Licensing declaration
`forms (e.g. see the ETSI IPR forms http://webapp.etsi.org/Ipr/).
`
`Approval of the agenda
`
`Draft Agenda for RAN1#52bis meeting
`R1-081165
`Dirk Gerstenberger (Chairman) proposed the agenda for the meeting.
`
`RAN1 Chairman
`
`
`
`Discussion (Question / Comment): Scheduling for HSPA was discussed. Parallel session is foreseen by Thursday to let
`more time for preparation.
`Decision: The agenda was approved.
`
`
`
`3.
`
`Approval of the minutes from previous meeting
`
`Draft report of RAN1#52 meeting
`R1-081574
`The document was presented by Patrick Mérias.
`
`Discussion (Question / Comment):
`Decision: The document is noted and approved.
`
`MCC Support
`
`(R1-081166)
`
`6 6
`
`Samsung Exhibit 1019, Page 6
`
`

`

`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`
`
`
`4.
`
`Liaison statement handling
`
`R1-081711
`
`= R2-081311
`Reply LS on code rate limitations for HS-DSCH UE cat 13 and 15 RAN2, Ericsson
`R1-081168
`The document was presented by Johan Bergman from Ericsson. RAN2 agrees to implement the correction in TS 25.306 as
`proposed by RAN1.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`Response LS to RAN5 on HSPA RB and SRB configurations in
`R1-081169
`34.108
`The document was presented by Johan Bergman from Ericsson.
`
`RAN2, Ericsson
`
`= R2-081319
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`= R2-081320
`RAN2, Ericsson
`LS on new MCCH radio bearer configuration in 34.108
`R1-081170
`The document was presented by Johan Bergman from Ericsson. RAN2 has checked and confirmed the correctness of the
`layer-2 parameters of the new MCCH radio bearer configuration proposed in the CR (section 6.10.2.4.3.9) attached to the
`LS RAN2 received from RAN5.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`LS on UTRAN enhancements for the support of inter-cell
`R1-081178
`interference cancellation
`The document was presented by Sharad Sambhwani from Qualcomm.
`
`RAN3, Qualcomm
`
`= R3-080548
`
`Discussion (Question / Comment): NSN mentioned the existence of contributions related to that topic for further
`discussion.
`Decision: Document is noted and Mr Chairman decided to look at them.
`
`Inter-cell Interference Cancellation in CELL_DCH and
`
`Qualcomm Europe
`R1-081357
`CELL_FACH
`The document was presented by Sharad Sambhwani from Qualcomm. The document demonstrates some use-case
`scenarios where inter-cell interference cancellation (IC-IC) may be beneficial in evolved HSPA networks and proposes one
`additional message over NBAP/RNSAP to allow the S-RNC to signal to an ICIC-capable NodeB appropriate information
`on interfering UEs that are served by neighbor NodeBs.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`System Performance of ICIC
`R1-081436
`Not treated during Monday’s session.
`
`Qualcomm Europe
`
`
`
`On the benefits of Inter-cell interference cancellation to HSPA
`R1-081428
`Nokia Siemens Networks
`
`networks
`The document was presented by Thomas Chapman from NSN and concludes that further analysis is required of the likely
`impact on RoT of terminals that have not yet been added to the active set. Also, the RX DPCCH levels typical of such UEs
`should be analyzed in order to check whether inter-cell interference cancellation is indeed likely to be feasible in such
`cases.
`
`NSN does not feel that RAN1 can yet reply to RAN3 that signaling to support inter-cell interference cancellation could be
`beneficial.
`
`Discussion (Question / Comment):
`
`7 7
`
`Samsung Exhibit 1019, Page 7
`
`

`

`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`Decision: Document is noted. The topic shall be revisited on Thursday.
`
`
`
`Thursday 3rd
`
`R1-081711
`
` (R1-081436)
`Qualcomm Europe
`System Performance of ICIC
`R1-081615
`The document was presented by Sharad Sambhwani from Qualcomm and shows simulation results of the system
`performance of HSPA networks where inter-cell interference cancellation (IC-IC) is enabled.
`
`Discussion (Question / Comment):
`Decision: Document is noted. Continue discussion at next meeting.
`
`
`
`GERAN, Nokia Siemens
`R1-081167
`Reply LS on CSG related mobility (stage 2 text)
`= GP-080417
`Networks
`The document was presented by Mieszko Chmiel from NSN. In this Liaison Statement, GERAN is requesting more
`clarifications from RAN2 on:
`
` Segregation of identities between CSG cells and public E-UTRAN cells
`
` Support of handover to CSG cells
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`Reply LS on radio problem detection as part of radio link failure
`R1-081171
`handling
`The document was presented by Lars Lindbom from Ericsson
`
`RAN2, Ericsson
`
`= R2-081358
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`RAN2, Ericsson
`LS on the change rate of physical layer parameters
`R1-081172
`The document was presented by Erik Dahlman from Ericsson. Actions for RAN1 are:
`
`= R2-081362
`
` RAN2 kindly asks RAN1 to reply to the following question:
`
`What is the anticipated change rate of the aforementioned uplink control parameters (P0,NOMINAL_PUSCH, , P0,
`
`UE_PUSCH, P0, PUCCH ) and the PRACH transmit power setting parameter?
`
` RAN2 would appreciate if RAN1 could, in future updates of the draft L1parameter list to be configured by RRC,
`indicate which parameters are expected to change often (i.e. change more often than once per hour) and provide
`the expected frequency of change for those parameters.
`
`Discussion (Question / Comment): PC discussion is foreseen on Thursday’s session
`Decision: Document is noted. This shall be revisited in connection with PC discussion.
`
`Friday 4th
`
`Update of the parameter list is available (in R1-081645). Erik Dahlman from Ericsson suggested the LS be postponed until
`next meeting.
`
`
`
`LS on various aspects related to GERAN to E-UTRAN
`= R2-081363
`RAN2, Motorola
`R1-081173
`interworking
`The document was presented by Robert Love from Motorola where RAN2 is requesting action from GERAN on the topic
`of E-UTRA neighbour lists used for mobility from GERAN to E-UTRAN.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`8 8
`
`Samsung Exhibit 1019, Page 8
`
`

`

`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`
`
`
`
`R1-081711
`
`LS on PRB usage measurements in reply to R1-080617
`R1-081174
`The document was presented by Sadayuki Abeta from NTT DoCoMo
`
`RAN2, NTT DoCoMo
`
`= R2-081368
`
`Discussion (Question / Comment): NTT DoCoMo requested clarification where PRB related measurements should be
`described (RAN1 or RAN2 specifications?)
`Decision: Document is noted. RAN1 preferences are to specify these measurements in RAN2 specs.
`
`
`
`Reply LS on Signaling of additional spectrum emission
`R1-081175
`requirements
`The document was presented by Rapeepat Ratasuk from Motorola
`
`RAN3, Motorola
`
`= R3-080449
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`LS on RAN performance monitoring
`R1-081176
`The document was presented by Sadayuki Abeta from NTT DoCoMo.
`
`RAN3, NTT DoCoMo
`
`= R3-080530
`
`Discussion (Question / Comment): Ongoing discussions between RAN3 and SA5
`Decision: Document is noted.
`
`SA5, Nokia Siemens
`R1-081183
`LS reply on RAN Performance monitoring
`= S5-080540
`Networks
`The document was presented by Mieszko Chmiel from NSN and is a response LS from SA5 clarifying role when working
`on performance measurement definitions.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`LS on Self Configuring and Self Optimizing Network Use Cases
`R1-081177
`and Solutions TR
`The document was presented by Georg Wannemacher from T-Mobile.
`
`RAN3, T-Mobile
`
`= R3-080536
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`LS on Scale of Reported Measurement Quantities
`R1-081180
`The document was presented by Ylva Jading from Ericsson
`
`Discussion (Question / Comment): No actions to RAN1
`Decision: Document is noted.
`
`
`
`RAN4, Ericsson
`
`= R4-080484
`
`Response to LS on switch time requirements for LTE TDD
`R1-081181
`The document was presented by Lars Lindbom from Ericsson.
`
`RAN4, Ericsson
`
`= R4-080535
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`= R4-080541
`RAN4, NTT DoCoMo
`LS on signaling Intra/Inter-frequency measurement bandwidth
`R1-081182
`The document was presented by Sadayuki Abeta from NTT DoCoMo. As a conclusion, RAN4 asks RAN2 to develop the
`relevant RRC signaling such that the eNode B can indicate to the UE the channel bandwidth of neighbour E-UTRA cells
`
`9 9
`
`Samsung Exhibit 1019, Page 9
`
`

`

`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`that the UE is required to measure in both ACTIVE and IDLE states, such that the UE can accurately make use of a wider
`measurement bandwidth in these states.
`
`R1-081711
`
`
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`Nokia Siemens Networks,
`Comments and Simulation Results Related to RAN2 LS on
`R1-081441
`
`Nokia
`BCCH Transmission (R1-080632)
`The document was presented by Mieszko Chmiel from NSN and provides simulation results to evaluate the worst case
`number of transmissions needed for System Information delivery and proposes the following:
`
` The worst case number of BCCH transmissions in case of time consecutive and time spares system information
`transmission
`
` Time diversity is beneficial from the system information transmission point of view
`o The reception of multiple SUs in parallel, when feasible from the RAN2 point of view, introduces a
`manageable UE complexity increase comparing to the serial SU reception
`o Furthermore, if retransmissions are confined within an 80 ms window (SU-1’s TTI), the latency increase
`due to time diversity is moderate
`
`Discussion (Question / Comment):
`Decision: Document is noted. Mr Chairman decided to look at R1-081206 as proposed by Panasonic.
`
`R1-081206
`BCCH on DL-SCH
`Panasonic
`The document was presented by Hidetoshi Suzuki from Panasonic and proposes the following:
`
`
`
` The (re)transmissions of SI-1 are in the subframe #5 in every radio frame with an even SFN.
`
` Both initial transmissions and retransmissions of SIs except SI-1 are done within a single time window.
`
` A timing restriction is applied for all SIs except SI-1. The number of transmissions (including retransmissions) of
`SIs except SI-1 is limited to two per 10ms. One is within subframe #0 to #4. The other is within subframe #5 to
`#9.
`
`Discussion (Question / Comment):
`Decision: Document is noted. Mr Chairman asked for off line discussion.
`
`Friday 4th
`
`Draft LS on SI-1 transmission
`R1-081607
`The document was presented by Erik Dahlman from Ericsson.
`
`Discussion (Question / Comment):
`Decision: Document is noted and LS is agreed in R1-081676
`
`Ericsson
`
`
`
`
`
`LS on implications of MIMO precoding schemes on RAN4
`R1-081179
`RAN4, Nokia
`= R4-080426
`requirements
`The document was presented by Asbjörn Grovlen from Nokia and indicates three precoding features which may need to be
`re-assessed in RAN1.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-081247
`
`Draft response to LS on implications of MIMO precoding
`schemes on RAN4 requirements
`
`LG Electronics, Samsung,
`ETRI
`
`
`
`10 10
`
`Samsung Exhibit 1019, Page 10
`
`

`

`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`The document was presented by (…) from LGE and proposes a reply LS to RAN4 with following conclusion: to keep
`staying with the current working assumption of both zero/small-delay CDD, as well as the wideband precoding support
`
`
`
`R1-081711
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-081379
`Performance of wideband precoding and small delay CDD
`Texas Instruments
`
`The document was presented by (…) from TI and take a look at the performance of small-delay CDD and wideband
`precoding. In this document, Zero-delay CDD is also used in conjunction with wideband precoding as a reference.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-081575
`Reconsideration on 2 Tx Codebook for Precoding
`NEC Group
` (R1-081556)
`The document was presented by Ng, Boon loong (…) from NEC and proposes to remove the Identity Matrix from the 2Tx
`rank-2 codebook as it does not provide any gain over the one without the first entry (as shown by simulation results in
`Section-2).
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-081573
`Comments on RAN4 LS on MIMO precoding (R1-081179)
`Nortel
`
`The document was presented by Hua Xu from Nortel and as a conclusion, recommends keeping antenna selection for 2-tx
`system in LTE.
`
`Discussion (Question / Comment): Questions on cross polarized antenna were raised and discussed.
`Decision: Document is noted.
`
`R1-081565
`
`Refinement on MIMO Precoding Schemes
`
`Ericsson, Fujitsu,
`Motorola, NEC, Nokia,
`Nokia Siemens Networks,
`NTT DoCoMo,
`Panasonic, Texas
`Instruments
`The document was presented by George Jöngren from Ericsson and is a text proposal to refine MIMO precoding schemes in 36.211.
`
`(R1-081541)
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`LGE requested to further present the following contribution:
`
`
`LG Electronics
`Further System Level Evaluation of Closed-loop MIMO
`R1-081262
`The document was presented by (…) from LGE and provides an evaluation of two closed-loop combinations under several
`channel and system scenarios. It concludes as follows:
`
` Zero-delay CDD mode is appropriate for the wideband precoding in order not to hurt the precoding gain in a high
`correlation channel.
`
` Small-delay CDD mode is beneficial for the frequency selective precoding in order to increase multi-user
`scheduling gain under high loaded cell.
`
` Timing misalignment across the transmit antennas degrades the performance of wideband precoding significantly,
`thereby requiring fine tuning of the misalignment for wideband precoding.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`As a conclusion of the LS and above set of contributions, proposal is as follow:
`
` Agree on reduction of codebook as stated in R1-081565, including removing small delay CDD. In addition
`Identity Matrix for 2 layers closed loop case for 2 TX antennas can be removed.
`
`11 11
`
`Samsung Exhibit 1019, Page 11
`
`

`

`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`
`
`
`R1-081711
`
` Above proposal is supported by Nokia, NSN, NTT DoCoMo, Panasonic, Ericsson, Motorola, Mitsubishi,
`Qualcomm, NEC, Huawei, TI, Interdigital, Icera, and Fujitsu. In order not to slow down the entire process, both
`LGE and Samsung finally agree with the proposal.
`
` Nortel still maintains their objection as they believe antenna selection for 2-tx system in LTE is a feature that
`should remain in the specs and requested extra time for off line discussion, and further evaluation on the
`performance impact at the system-level. Nortel argued that, although RAN4 simulation results have shown no
`performance difference, their link-level simulation results have shown a more significant performance impact in
`removing the AS codewords.
`
`Friday 4th
`
`R1-081668
`Way Forward for Antenna Selection
`Nortel, Alcatel-Lucent
`
`The document was presented by Miss Anna Tee from Nortel and explains Nortel’s recommendations in response to the LS
`from RAN4.
`
`Discussion (Question / Comment): Nortel confirmed they maintain their objection. As Mr Chairman proposed the topic
`being revisited at next meeting, NTT DoCoMo with others expressed their disagreement for postponing the decision.
`Vodafone, Vierzon Wireless and Alcatel-Lucent confirmed also their objection to R1-081565.
`Decision: Document is noted. As no decision could have been reached, decision shall be taken at next meeting, by vote if
`no consensus possible.
`
` Above way forward in R1-081668 is rejected by Ericsson, Nokia, NSN, NTT DoCoMo, Samsung, Panasonic,
`NEC, Qualcomm, Huawei, Fujitsu and Mitsubishi.
`
`Nortel, Alcatel-Lucent,
`Philips, Vodafone,
`Verizon, Orange, T-
`Mobile
`
`
`
`R1-081669
`
`Draft response to LS on implications of MIMO schemes on RAN4
`requirements R1-081179 (R4-080426)
`
`
`
`Recently received Incoming LS
`
`Thursday 3rd
`
`LS on RAN2 status on Enhanced uplink for CELL_FACH state in FDD RAN2, Huawei
`R1-081590
`The document was presented by (…) from Huawei.
`
`= R2-081969
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-081643
`Reply LS to HS-DPCCH usage with Enhanced Uplink in Cell_FACH
`The document was presented by Karri Ranta-aho from NSN.
`
`RAN3, Nokia Siemens
`Networks
`
`= R3-080963
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`Friday 4th
`
`LS on Half-Duplex FDD
`R1-081644
`The document was presented by Ylva Jading from Ericsson.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`RAN4, Ericsson
`
`= R3-081644
`
`R1-081647
`LS on E-UTRAN Neighbour Cell list information for GERAN
`The document was presented by Prakash Bhat from Vodafone.
`
`GERAN2, Telecom Italia,
`Vodafone
`
`= G2-080231
`
`12 12
`
`Samsung Exhibit 1019, Page 12
`
`

`

`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`R1-081711
`
`13 13
`
`Samsung Exhibit 1019, Page 13
`
`

`

`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`
`
`
`R1-081711
`
`5.
`
`Maintenance of UTRA Release 99 – Release 8
`
`
`
`25.212 CR0262 (Rel-8, B) HS-SCCH orders for HS-SCCH-less
`R1-081515
`Ericsson
`
`operation
`The document was presented by Johan Bergman from Ericsson and deals with scenarios where HS-SCCH-less operation is
`configured in the UE but not needed from a network performance point of view (e.g. in low-load scenarios), the UE power
`consumption can be reduced if the serving NodeB has a possibility to deactivate (and, if needed, reactivate) HS-SCCH-less
`operation for the UE. For further description, see R1-080904.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Corresponding CR to 25.214 is in R1-081618
`
`25.214 CR0483r1 (Rel-8, B) HS-SCCH orders for HS-SCCH-less
`R1-081618
`operation
`The document was presented by Johan Bergman from Ericsson.
`
`Ericsson
`
`(R1-081516)
`
`Discussion (Question / Comment): NSN expressed their doubt having such technique implemented. Question: is the CR
`really needed?
`As equivalent CRs have been presented in RAN2 with same question mark, RAN2 decision is conditioned to RAN1
`agreement.
`Another approach to the text could be made (Philips’ proposal).
`Decision: Document is noted. Discussion should go on and topic will be revisited at next meeting.
`
`
`
`R1-081424
`
`Nokia, Nokia Siemens
`25213CR0092 (Rel-7, F) Range of E-DCH amplitude ratios with
`Networks
`QPSK
`Nokia, Nokia Siemens
`25213CR0093 (Rel-8, A) Range of E-DCH amplitude ratios with
`R1-081425
`
`Networks
`QPSK
`The documents were presented by Antti Hiltunen from Nokia and clarify how high amplitude ratios UEs not sustaining
`16QAM must support.
`
`
`
`Discussion (Question / Comment):
`Decision: Documents are noted. CRs shall be revised in R1-081628 and are for email approval until Friday 11th April.
`
`
`
`25.213 CR0094r1 (Rel-7, F) Restricted Beta Factor
`R1-081617
`Combinations for UL 16QAM
`The document was presented by Johan Bergman from Ericsson
`
`Ericsson
`
`(R1-081514)
`
`Discussion (Question / Comment):
`Decision: Document is noted. The CR is agreed in principle (wording issue) in R1-081629 and shall be merged with
`Nokia, NSN CR in R1-081628.
`
`
`
`R1-081613
`
`25214CR0481R1 (Rel-7, F) CPC DTX cycle change clarification
`
`Nokia, Nokia Siemens
`Networks, Alcatel-Lucent
`Nokia, Nokia Siemens
`R1-081614
`25214CR0482R1 (Rel-8, A) CPC DTX cycle change clarification
`(R1-081427)
`Networks, Alcatel-Lucent
`The document was presented by Antti Hiltunen from Nokia and intends for better description of the Uplink DPCCH burst
`pattern when the DTX cycle changes during an Uplink DPCCH burst.
`
`(R1-081426)
`
`Discussion (Question / Comment):
`Decision: Document is noted. CRs shall be revised in R1-081630
`
`Friday 4th
`
`14 14
`
`Samsung Exhibit 1019, Page 14
`
`

`

`3GPP TSG RAN WG1 Meeting #53
`Kansas City, USA, 5 – 9 May, 2008
`
`
`
`
`CPC DTX cycle change clarification
`R1-081630
`Decision: Document is agreed.
`
`
`
`R1-081711
`
`Nokia, Nokia Siemens
`Networks, Alcatel-Lucent
`
`(R1-081613)
`(R1-081614)
`
`R1-081598
`
`25.212 CR0263 (Rel-7, F) Clarification to number of HS-PDSCH
`codes in HS-SCCH less operations
`25.212 CR0264 (Rel-8, F) Clarification to number of HS-PDSCH
`R1-081599
`codes in HS-SCCH less operations
`CR category in Rel-8 shall be A instead of F.
`
`InterDigital
`Communications LLC
`InterDigital
`Communications LLC
`
`(R1-081268)
`
`(R1-081268)
`
`The document was presented by Eldad Zeira from InterDigital and is an attempt making the interpretation of the specs
`much better, regarding the number of HS-PDS

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket