throbber
3GPP TR 21.900 V6.2.0 (2004-06)
`
`Technical Report
`
`3rd Generation Partnership Project;
`Technical Specification Group Services and System Aspects;
`Technical Specification Group working methods
`(Release 6)
`
`GLOBAL SYSTEM FOR
`MOBILE COMMUNICATIONS
`
`R
`
`The present document has been developed within the 3rd Generation Partnership Project (3GPP TM) and may be further elaborated for the purposes of 3GPP.
`
`The present document has not been subject to any approval process by the 3GPP Organisational Partners and shall not be implemented.
`This Specification is provided for future development work within 3GPP only. The Organisational Partners accept no liability for any use of this Specification.
`Specifications and reports for implementation of the 3GPP TM system should be obtained via the 3GPP Organisational Partners' Publications Offices.
`
`NAC1016
`Page 1
`
`

`

`Release 6
`
`2
`
`3GPP TR 21.900 V6.2.0 (2004-06)
`
`Keywords
`GSM, UMTS, methodology
`
`3GPP
`
`Postal address
`
`3GPP support office address
`650 Route des Lucioles - Sophia Antipolis
`Valbonne - FRANCE
`Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
`
`Internet
`http://www.3gpp.org
`
`Copyright Notification
`
`No part may be reproduced except as authorized by written permission.
`The copyright and the foregoing restriction extend to reproduction in all media.
`
`© 2004, 3GPP Organizational Partners (ARIB, ATIS, CCSA, ETSI, TTA, TTC).
`All rights reserved.
`
`3GPP
`
`NAC1016
`Page 2
`
`

`

`Release 6
`
`3
`
`3GPP TR 21.900 V6.2.0 (2004-06)
`
`Contents
`
`Foreword.............................................................................................................................................................5
`Introduction ........................................................................................................................................................5
`1
`Scope........................................................................................................................................................6
`1A References................................................................................................................................................6
`2
`Definitions and abbreviations...................................................................................................................6
`3
`General responsibilities of the Support Team ..........................................................................................7
`4
`Handling of Specifications.......................................................................................................................8
`4.0
`Numbering scheme.................................................................................................................................................. 8
`4.0A
`Version nomenclature ...................................................................................................................................... 10
`4.0B
`Releases ........................................................................................................................................................... 10
`4.1
`Overview ............................................................................................................................................................... 11
`4.1.1
`General............................................................................................................................................................. 11
`4.1.2
`Role of the rapporteur...................................................................................................................................... 12
`4.2
`Characteristics of a specification........................................................................................................................... 12
`4.3
`Characteristics of a major version of a specification............................................................................................. 12
`4.4
`Characteristics of a version of a specification ....................................................................................................... 13
`4.5
`(void) ..................................................................................................................................................................... 13
`4.6
`Change Request regime......................................................................................................................................... 13
`4.6.1
`Change Requests.............................................................................................................................................. 13
`4.6.2
`Change Request forms..................................................................................................................................... 14
`4.6.3
`Contents of Change Requests .......................................................................................................................... 16
`4.6.4
`Handling of the Change Requests.................................................................................................................... 16
`4.6.5
`Updating and release of new versions of the specifications............................................................................. 17
`4.6.6
`Other changes to specifications ....................................................................................................................... 17
`4.7
`"Freezing" of specifications................................................................................................................................... 18
`4.8
`"Closing" of specifications .................................................................................................................................... 18
`4.9
`"Withdrawing" of specifications............................................................................................................................ 18
`4.10
`Release control................................................................................................................................................. 18
`4.10.1
`Creation of a new Release version of a specification ...................................................................................... 18
`4.10.1.1
`With no technical changes compared to the previous Release ................................................................... 18
`4.10.1.2
`When introducing technical changes.......................................................................................................... 19
`4.10.1.3
`Specifications not propagated to next Release ........................................................................................... 19
`4.10.2 Mirror Change Requests .................................................................................................................................. 19
`4.10.3
`Release mechanisms ........................................................................................................................................ 19
`4.10.3.1
`Corrections to Releases .............................................................................................................................. 19
`4.10.3.2
`New features............................................................................................................................................... 20
`4.10.3.3
`Release naming .......................................................................................................................................... 20
`4.10.3.4
`Introduction of features into Releases ........................................................................................................ 20
`5
`Availability and distribution of specifications .......................................................................................21
`5A File naming conventions ........................................................................................................................21
`6
`Work items .............................................................................................................................................23
`6.0
`Introduction ........................................................................................................................................................... 23
`6.0.1
`Introduction: why manage a project?............................................................................................................... 23
`6.0.2
`How to manage a project? ............................................................................................................................... 24
`6.0.2
`Types of modifications to specifications ......................................................................................................... 25
`6.1
`Creation of a Work Item........................................................................................................................................ 25
`6.2
`Type of Work Items............................................................................................................................................... 26
`6.3
`Start and continuation of the work and responsibilities......................................................................................... 26
`6.3.1
`General............................................................................................................................................................. 26
`6.3.2
`Role of the rapporteur...................................................................................................................................... 27
`
`3GPP
`
`NAC1016
`Page 3
`
`

`

`Release 6
`
`4
`
`3GPP TR 21.900 V6.2.0 (2004-06)
`
`Realization of Work Items..................................................................................................................................... 27
`6.4
`Planning and categorization of the deliverables (and control thereof)............................................................. 27
`6.4.1
`Choice of deliverables ..................................................................................................................................... 28
`6.4.2
`Contents of deliverables................................................................................................................................... 28
`6.4.3
`Service requirements........................................................................................................................................ 28
`6.4.3.1
`Technical realization specifications................................................................................................................. 28
`6.4.3.2
`Test specifications ........................................................................................................................................... 28
`6.4.3.3
`Completion of Work Items.................................................................................................................................... 28
`6.5
`6.6 Work item model................................................................................................................................................... 29
`7
`Management documents and tools .........................................................................................................30
`7.1
`Status List of Specifications .................................................................................................................................. 30
`7.2 Work Item Status List............................................................................................................................................ 30
`7.3
`Change Request data base ..................................................................................................................................... 30
`7.4 Mailing lists and Membership data bases.............................................................................................................. 30
`7.5
`Electronic tools used/preferred.............................................................................................................................. 30
`7.6 WEB and FTP services.......................................................................................................................................... 30
`7.7
`E-mail reflectors .................................................................................................................................................... 30
`8
`Email decisions ......................................................................................................................................31
`8.1
`Email drafting phase.............................................................................................................................................. 31
`8.2
`E-mail decision declaration ................................................................................................................................... 31
`8.3
`Status reporting...................................................................................................................................................... 31
`8.4
`Decision announcement......................................................................................................................................... 32
`8.5
`Timing ................................................................................................................................................................... 32
`8.6
`General .................................................................................................................................................................. 32
`Annex A:
`Change history ......................................................................................................................33
`
`3GPP
`
`NAC1016
`Page 4
`
`

`

`Release 6
`
`5
`
`3GPP TR 21.900 V6.2.0 (2004-06)
`
`Foreword
`This Technical Specification has been produced by the 3rd Generation Partnership Project (3GPP).
`
`The contents of the present document are subject to continuing work within the TSG and may change following formal
`TSG approval. Should the TSG modify the contents of the present document, it will be re-released by the TSG with an
`identifying change of release date and an increase in version number as follows:
`
`Version x.y.z
`
`where:
`
`x the first digit:
`
`1 presented to TSG for information;
`
`2 presented to TSG for approval;
`
`3 or greater indicates TSG approved document under change control.
`
`y the second digit is incremented for all changes of substance, i.e. technical enhancements, corrections,
`updates, etc.
`
`z
`
`the third digit is incremented when editorial only changes have been incorporated in the document.
`
`Introduction
`In order to ensure correctness and consistency of the specifications (i.e., technical specifications and technical reports)
`under responsibility of the Technical Specification Groups (TSG) of the 3rd Generation Partnership Project (3GPP),
`clear, manageable and efficient mechanisms are necessary to handle version control, change control, document
`updating, distribution and management.
`
`Also, the fact that the specifications are/will be implemented by industry almost in parallel with the writing of them
`requires strict and fast procedures for handling of changes to the specifications.
`
`It is very important that the changes that are brought into the standard, from the past, at present and in the future, are
`well documented and controlled, so that technical consistency and backwards tracing are ensured.
`
`The 3GPP TSGs, and their sub-groups together with the Support Team are responsible for the technical content and
`consistency of the specifications whilst the Support Team alone is responsible for the proper management of the entire
`documentation, including specifications, meeting documents, administrative information and information exchange with
`other bodies.
`
`3GPP
`
`NAC1016
`Page 5
`
`

`

`Release 6
`
`6
`
`3GPP TR 21.900 V6.2.0 (2004-06)
`
`Scope
`1
`This document outlines the working methods to be used by the 3GPP Technical Specification Groups and their Working
`Groups and their Sub-Groups, and by the 3GPP Support Team in relation to document management, i.e. handling of
`specifications, updating procedures, change request procedures, version control mechanisms, specifications status
`information etc. It complements the rules and procedures defined for 3GPP. This document does not stipulate the details
`of the internal working of the TSG Sub-Groups. From the Technical Specification Group point of view, a task and
`responsibility is given to a Working Group directly answering to the Technical Specification Group. In practice, the
`work/task may be carried out in a subgroup of that Working Group.
`
`References
`1A
`The following documents contain provisions which, through reference in this text, constitute provisions of the present
`document.
`
`• References are either specific (identified by date of publication, edition number, version number, etc.) or
`non-specific.
`
`• For a specific reference, subsequent revisions do not apply.
`
`• For a non-specific reference, the latest version applies. In the case of a reference to a 3GPP document (including
`a GSM document), a non-specific reference implicitly refers to the latest version of that document in the same
`Release as the present document.
`
`3GPP TR 21.801: "Specification drafting rules".
`
`3GPP TR 21.905: "Vocabulary for 3GPP Specifications".
`
`3GPP TS 21.101: "Technical Specifications and Technical Reports for a UTRAN-based 3GPP system".
`
`3GPP TS 41.101: "Technical Specifications and Technical Reports for a GERAN-based 3GPP system".
`
`ITU-T Recommendation I.130: "Method for the characterization of telecommunication services supported by an
`ISDN and network capabilities of an ISDN".
`
`Definitions and abbreviations
`2
`For the purposes of the present document, the following terms and those in 3GPP TR 21.905 apply.
`
`building block: sub-division of a feature, representing a coherent set of technical functionality which would generally
`be expected to reside in a single system element.
`
`change control: procedure whereby proposed modifications to a specification are presented for approval to the TSG as
`formal Change Requests.
`
`closed: specification status in which no changes of any kind to the specification are permitted.
`
`Change Request (CR): formal proposal presented on a standard form to modify a specification which is under change
`control.
`
`draft: specification status prior to change control, in which changes may be made without formal Change Requests.
`
`feature: new or substantially enhanced functionality which represents added value to the existing system.
`
`frozen: specification status in which only essential corrections are permitted.
`
`Group: TSG or TSG Sub-Group.
`
`3GPP
`
`NAC1016
`Page 6
`
`

`

`Release 6
`
`7
`
`3GPP TR 21.900 V6.2.0 (2004-06)
`
`major version: For version x.y.z of a specification, x is called the major version.
`
`Example:
`
`For version 3.2.0 of a specification, the major version is 3.
`
`specification: generic term standing for Technical Specification and Technical Report.
`
`TSG: Technical Specification Group.
`
`TSG change control: specification status in which the Technical Specification Group is responsible for approval of
`Change Requests.
`
`TSG Sub-Group: Working Group or subgroup of a Working Group or of a Sub-Group.
`
`Working Group (WG): official subgroup of a TSG reporting to that TSG.
`
`WG Change Control: specification status in which the Working Group is responsible for agreeing Change Requests
`for submission to the TSG for approval.
`
`version: unique identifier in the form x.y.z for a specification at a given point in time.
`
`Example:
`
`version 3.12.3.
`
`withdrawn: specification status in which the given version of the specification no longer belongs to the appropriate set
`of valid specifications.
`
`Work Item (WI): description of an enhancement to a technical area, which may be categorized as feature, building
`block or work task.
`
`Work Item description (WID): description of a Work Item in a standard Work Item Description sheet.
`
`work task: sub-division of a building block, representing a self-contained, well-scoped and well-scheduled item of
`work.
`
`General responsibilities of the Support Team
`3
`The Support Team is responsible for the management of the work of the TSGs. This includes editorship and
`management of specifications once they have been put under TSG change control. It also includes preparation of and
`support for the meetings (including meeting reports) of the TSGs and their Working Groups, and subgroups in
`descending priority.
`
`It furthermore includes liaison with other bodies and relevant groups and institutions.
`
`3GPP
`
`NAC1016
`Page 7
`
`

`

`Release 6
`
`8
`
`3GPP TR 21.900 V6.2.0 (2004-06)
`
`4
`
`Handling of Specifications
`
`Numbering scheme
`4.0
`The specifications shall be numbered according to the following scheme:
`
`3GPP TS aa.bbb (for Technical Specifications); or
`
`3GPP TR aa.bbb (for Technical Reports).
`
`The fields aa and bbb shall be selected according to the nature of the specification as given in tables 1 and 2. The
`provisions of table 1 shall be strictly enforced, but those of table 2 should be used for guidance: it is acceptable to
`deviate from these provisions for backwards compatibility or other reasons.
`
`Table 1: Specification number ranges aa
`
`Range for
`GSM
`Release 4
`onwards
`
`Range for
`UMTS
`Release
`1999
`onwards
`
`Use
`
`Remarks
`
`41.bbb
`
`21.bbb
`
`Requirements specifications
`
`Often transient specifications containing
`requirements leading to other specifications;
`may become obsolete when technical
`solutions have been fully specified; they could
`then, e.g., be replaced by reports describing
`the performance of the system, they could be
`deleted without replacement, or be kept for
`historical reasons but treated as background
`material.
`Services, service features, building blocks or
`platforms for services (a service feature or
`service building block may provide certain
`generic functionality for the composition of a
`service, including the control by the user; a
`platform may comprise one or more network
`elements, e.g. UIM, mobile terminal, auxiliary
`system to the core network etc.); also
`appropriate stage 1 specifications; also reports
`defining services which can be realized by
`generic building blocks etc.
`Mainly stage 2 specifications (or specifications
`of a similar nature describing interworking over
`several interfaces, the behaviour in
`unexceptional cases, etc.).
`Detailed and bit-exact stage 3 specifications of
`protocols between MS/UE and the Core
`Network.
`25.1bb: UTRAN radio performance
`25.2bb: UTRA layer 1
`25.3bb: UTRA layers 2 & 3
`25.4bb: UTRAN Iub, Iur & Iu interfaces
`Speech and other codecs (video etc.).
`Functions necessary to support data
`applications.
`Detailed and bit-exact stage 3 specifications of
`protocols between radio subsystem (eg BSS)
`and periphery of CN (eg MSC). (Not used in
`Release 1999.)
`Detailed and bit-exact stage 3 specifications of
`protocols within the Core Network.
`
`Range for
`GSM up
`to and
`including
`Release
`1999
`01.bb
`
`02.bb
`
`42.bbb
`
`22.bbb
`
`Service aspects
`
`03.bb
`
`43.bbb
`
`23.bbb
`
`Technical realization
`
`04.bb
`
`44.bbb
`
`24.bbb
`
`Signalling protocols (UE to
`CN)
`
`05.bb
`
`45.bbb
`
`25.bbb
`
`Radio access aspects
`
`06.bb
`07.bb
`
`08.bb
`
`46.bbb
`47.bbb
`
`48.bbb
`
`26.bbb
`27.bbb
`
`28.bbb
`
`Codecs
`Data
`
`Signalling protocols (RSS to
`CN)
`
`09.bb
`
`49.bbb
`
`29.bbb
`
`Core Network signalling
`protocols
`
`3GPP
`
`NAC1016
`Page 8
`
`

`

`9
`
`3GPP TR 21.900 V6.2.0 (2004-06)
`
`Use
`
`Remarks
`
`Range for
`GSM
`Release 4
`onwards
`
`Range for
`UMTS
`Release
`1999
`onwards
`
`50.bbb
`
`30.bbb
`
`Programme management
`
`51.bbb
`
`52.bbb
`
`31.bbb
`
`32.bbb
`
`SIM / UIM
`
`Charging and OAM&P
`(Operations, Administration,
`Maintenance & Provisioning)
`
`3rd Generation Mobile System, project plans /
`project work programme and stand-alone
`documents for major work items.
`Subscriber / User Identity Module and the
`interfaces between it and other entities.
`Application of TMN for the 3GPP 3rd
`Generation Mobile System and other functions
`for operation, administration and maintenance
`of a 3rd Generation Mobile System network.
`Regulatory test specifications. (Transferred
`from ETSI TC SMG to ETSI TC MSG.)
`
`Release 6
`
`Range for
`GSM up
`to and
`including
`Release
`1999
`10.bb
`
`11.bb
`
`12.bb
`
`13.bb
`
`NOTE:
`
`33.bbb
`34.bbb
`35.bbb
`
`Security aspects
`Test specifications
`Algorithms
`
`Specifications of encryption algorithms for
`confidentiality and authentication, etc.
`Column 1 refers to the original GSM specification series used up to Release 1999.
`Column 2 refers to the specifications peculiar to GSM implementations for Release 4 onwards – that is,
`those specifications relating solely to GSM/EDGE radio access.
`Column 3 refers to the specifications created by 3GPP for Release 1999 onwards implementations having a
`UTRAN radio access. Many of these are common to GSM/EDGE and UTRAN systems (see table 2).
`Separate specifications list the specs required to implement Releases GSM/EDGE and UTRAN systems
`(3GPP TSs 21.101, 01.01 / 41.101).
`
`Table 2: Specification number ranges bbb
`
`Range
`aa.bb
`
`aa.0bb
`
`Use
`Specification applicable to pre-Release-4 GSM
`systems.
`Specifications applicable to both 2G (GSM) and
`3G systems.
`
`aa.1bb
`
`Specification either (a) derived from earlier 2G
`(GSM) specification, but with technical
`modification; or (b) new specifications.
`
`New specifications.
`
`aa.2bb
`to
`aa.7bb
`
`aa.8bb
`
`Technical Reports not intended for publication.
`
`aa.9bb
`
`Technical Reports intended for publication.
`
`Remarks
`Continue to be maintained by 3GPP. Not propagated
`beyond Release 1999.
`aa in range 21 to 39:
`For most specifications in this range for a given
`Release, a GSM specification numbered [aa - 20].[bb]
`will have existed for earlier Releases.
`Example: 3GPP TS 28.032 replaces GSM 08.32 for
`Release 1999 onwards.
`aa in range 41 to 59:
`Direct equivalent to aa.bb GSM specification for
`previous Releases.
`aa in range 21 to 39:
`For most specifications in this range for a given
`Release, a GSM specification numbered
`[aa - 20].[bbb - 100] will have existed for earlier
`Releases, and may continue to exist (in parallel) for the
`same Release.
`Example: 3GPP TS 28.133 will have been based on
`GSM 08.33, but both specifications exist for
`Release 1999 onwards.
`aa in range 41 to 59:
`New GSM specification for Release 4 or later.
`Not, in general, derived from pre-Release 4 GSM
`predecessors.
`NOTE:
`See table 1 for specific allocation within
`25.bbb series.
`Working documents of 3GPP Groups not intended to be
`transposed into publications by the Partner
`Organizations.
`As distinct from those of the aa.8bb series.
`
`3GPP
`
`NAC1016
`Page 9
`
`

`

`Release 6
`
`10
`
`3GPP TR 21.900 V6.2.0 (2004-06)
`
`Version nomenclature
`4.0A
`Each specification is associated with a "version number" in the form x.y.z which uniquely identifies the document. The
`significance of the three fields is defined in table 3.
`
`Table 3: Version number fields
`
`Field
`
`x
`
`Use
`
`major
`also referred to as "release"
`
`y
`
`z
`
`technical
`
`editorial
`
`Remarks
`
`0:
`1:
`
`2:
`
`draft
`presented to TSG for information
`(specification estimated by prime responsible
`Group to be at least 60% stable)
`presented to TSG for approval (specification
`estimated by prime responsible Group to be
`at least 80% stable)
`3 or greater: approved by TSG and under change
`control; the value indicates the Release
`according to table 4.
`Incremented every time a technical change is
`introduced into the specification. Once under change
`control, such changes shall only occur when the TSG
`approves one or more Change Requests. Reset to zero
`every time the "major" field is incremented.
`Incremented every time a purely editorial change is
`introduced into the specification. Reset to zero every
`time the "technical" field is incremented or reset to zero.
`
`Table 3 shows the estimated degree of stability to be used as a guideline for determining when to raise a specification to
`version 1.y.z and to 2.y.z. Such figures are obviously subjective, and the decision is ultimately at the discretion of the
`responsible Group.
`
`Releases
`4.0B
`Specifications are grouped into "Releases". A mobile system can be constructed based on the set of all specifications
`which comprise a given Release. A Release differs from the previous Release by having added functionality introduced
`as a result of ongoing standardization work within the Groups.
`
`Specifications pertaining to a given Release shall be distinguished by the first field of the version number ("x" in x.y.z)
`according to table 4. Table 0 also shows for comparison the equivalent significance of the GSM Releases.
`
`For further details on Release control, see subclause 4.10.
`
`Table 4: Version numbers vs. Releases
`
`Spec under change control for …
`
`GSM Phase 1
`GSM Phase 2
`Release 1996
`GSM Phase 2+
`Release 1997
`GSM Phase 2+
`Release 1998
`GSM Phase 2+
`Release 1999
`GSM Phase 2+
`3GPP (excl GSM) Release 1999
`3GPP
`Release 4
`3GPP
`Release 5
`…
`
`NOTE:
`
`spec number
`format and
`version
`aa.bb
`aa.bb
`aa.bb
`aa.bb
`aa.bb
`aa.bb
`aa.bbb
`aa.bbb
`aa.bbb
`…
`From Release 4 onwards the 3GPP format for
`specification numbers and versions applies to all
`specifications (including those only relevant for
`implementation of a stand-alone GSM system).
`
`v3.y.z
`v4.y.z
`v5.y.z
`v6.y.z
`v7.y.z
`v8.y.z
`v3.y.z
`v4.y.z
`v5.y.z
`
`3GPP
`
`NAC1016
`Page 10
`
`

`

`Release 6
`
`11
`
`3GPP TR 21.900 V6.2.0 (2004-06)
`
`Overview
`4.1
`Where appropriate, the three-stage methodology defined in ITU-T Recommendation I.130 should be employed:
`
`Stage 1 is an overall service description from the user’s standpoint.
`
`Stage 2 is an overall description of the organization of the network functions to map service requirements into
`network capabilities.
`
`Stage 3 is the definition of switching and signalling capabilities needed to support services defined in stage 1.
`
`In addition, it is often appropriate to perform a feasibility study prior to formal specification work. This is sometimes
`referred to as "stage 0".
`
`Furthermore, it will often be appropriate to follow stage 3 with the production of test specifications – a stage 4.
`
`General
`4.1.1
`A new specification shall be created in a Group. At creation, a rapporteur shall be appointed. The rapporteur shall
`produce an initial draft, version 0.0.0, and subsequent revised versions (version 0.1.0, possibly 0.1.1, 0.1.2 and so on,
`then version 0.2.0 etc.). Details of the role of the rapporteur are described in subclause 4.1.2.
`
`The rules for drafting specifications, and the software tools to be used are listed in 3GPP TR 21.801.
`
`Versions 0.1.0, 0.2.0, 0.3.0 etc. should be presented to the responsible Group. Versions 0.i.1, 0.i.2 etc. may be internal
`to the drafting group.
`
`Further drafts may be produced, with appropriate increments in the "technical" / "editorial" fields of the version
`number. Every new draft with an incremented "technical" version field shall be presented to the responsible Group.
`Although two or more Groups may have an interest in contributing to the development of a specification, ultimate
`responsibility vests in a single (responsible) Group. The responsible Group shall ensure that all other Groups which
`might have an interest are given the opportunity to participate in the drafting.
`
`The Support Team is responsible for allocating specification numbers. As soon as title, scope and some other
`information on the specification is stable, the Support Team shall assign a specification number according to the
`provisions of subclause 4.0 and shall enter the specification into the Status List of Specifications (see clause 7). The
`TSG Sub-Group responsible for the specification shall inform its parent TSG that such a new specification is under
`construction.
`
`When a specification is sufficiently stable (see table 3), it shall be converted to version 1.0.0 (with no technical changes
`with respect to the previous version 0.y.z) by the Support Team, and presented to the TSG for information. Further
`drafts bearing version numbers 1.y.z may be produced until the specification is sufficiently stable to be approved by the
`TSG. At this stage, and until formal approval by the TSG, the specification is, unless it belongs directly to a TSG, under
`the control of the responsible TSG Sub-Group. The modalities governing the introduction of changes shall be decided
`on a case by case basis by the WG concerned.
`
`Once the responsible Group considers that the draft is sufficiently stable (see table 3) that it is desirable to place it under
`change control, the latest version 1.y.z shall be converted to version 2.0.0 (with no technical changes with respect to the
`previous version 1.y.z) by the Support Team and presented for approval at the TSG.
`
`If the TSG does not approve the draft, further drafts version 2.y.z may be produced by the responsible Group.
`
`If the TSG does approve the draft, the approved version (with no technical changes) shall be converted to version x.0.0
`where "x" corresponds to the Release identity

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket