`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`Agenda item
`3
`Title:
` Report of 3GPP TSG RAN WG1 #52 v1.0.0
`
`
`(Sorrento, Italy, 11 – 15 February, 2008)
`Document for:
` Comment
`Source:
`
`MCC Support
`
`
`
`
`
`
`
`
`Fact Summary
`Meeting:
`Dates:
`Venue:
`Host:
`Attendees:
`Documents:
`
`
`3GPP TSG RAN WG1 #52
`11th through 15th February, 2008
`Hilton Sorrento Palace, Sorrento, ITALY
`European Friends of 3GPP
`162 delegates
`519 (including some withdrawn and post-meeting artefacts)
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`Patrick Mérias
`ETSI Mobile Competence Center
`F-06921 Sophia Antipolis Cedex
`Tel: +33 4 92 94 42 06
`
`Patrick.merias@etsi.org
`
`1 1
`
`Ericsson Exhibit 1023
`ERICSSON v. ETRI
`
`
`
`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`Table of contents
`
`
`R1-081166
`
`Executive summary ......................................................................................................................................... 3
`1
`Opening of the meeting ........................................................................................................................ 5
`1.1
`Call for IPR ........................................................................................................................................................... 5
`2
`Approval of the agenda ......................................................................................................................... 5
`3
`Approval of the minutes from previous meeting ............................................................................... 5
`4
`Liaison statement handling .................................................................................................................. 6
`5. Maintenance of UTRA R99 – Rel-8 .................................................................................................... 9
`6.
`Evolved UTRA and UTRAN ............................................................................................................... 13
`6.1
`Finalization of TS 36.211 ................................................................................................................................. 13
`6.1.1
`Downlink reference signals ....................................................................................................................... 13
`6.1.2
`Uplink reference signals ............................................................................................................................ 15
`6.1.3
`Downlink Control Signalling ...................................................................................................................... 17
`6.1.4
`Uplink Control Signalling ........................................................................................................................... 25
`6.1.5
`Mapping of virtual resource blocks to physical resource blocks ........................................................ 31
`6.1.6
`Bit Scrambling sequences for UL/DL transmissions ............................................................................ 34
`6.1.7
`Remaining issues for TDD and FDD HD ................................................................................................ 35
`6.1.8
`Other remaining issues for 36.211 ........................................................................................................... 38
`6.2
`Finalization of TS 36.212 ................................................................................................................................. 38
`6.3
`Finalization of TS 36.213 ................................................................................................................................. 38
`6.3.1
`Timing synchronization .............................................................................................................................. 38
`6.3.2
`UL/DL Power Control ................................................................................................................................. 39
`6.3.3
`Inter-cell Interference Coordination ......................................................................................................... 42
`6.3.4
`UE Procedures for downlink shared channel ........................................................................................ 43
`6.3.5
`UE Procedures for uplink shared channel .............................................................................................. 43
`6.3.6
`Remaining issues for TDD and FDD HD ................................................................................................ 44
`6.3.7
`Other remaining issues for 36.213 .......................................................................................................... 44
`6.4
`Finalization of TS 36.214 ................................................................................................................................. 44
`6.5
`Finalization of TS 36.306 ................................................................................................................................. 45
`7.
`Enhanced Uplink for Cell_FACH State in FDD ............................................................................... 47
`8.
`Study Item on Synchronized E-DCH ................................................................................................ 52
`9.
`Study Item on HS-PDSCH serving cell change enhancements ................................................... 56
`10. Study Item on Scope of future HSPA Evolution for 1.28Mcps TDD ............................................. 57
`11. Work Item on 64QAM for 1.28Mcps TDD HSDPA .......................................................................... 57
`12. Work Item on Enhanced CELL_FACH state in 1.28Mcps TDD (UL/DL) ..................................... 57
`13. Closing of the meeting ........................................................................................................................ 57
`Annex A: List of participants at RAN1 #52 .............................................................................................. 59
`Annex B: TSG RAN WG1 meetings in 2008 .......................................................................................... 60
`Annex C: List of CRs agreed at RAN1#52 .............................................................................................. 61
`Annex D: List of Outgoing LSs from RAN1#52 ...................................................................................... 63
`Annex E: List of Tdocs at RAN1 #52 ....................................................................................................... 65
`Annex F: List of actions ............................................................................................................................. 66
`
`
`2 2
`
`Ericsson Exhibit 1023
`ERICSSON v. ETRI
`
`
`
`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`R1-081166
`
`Executive summary
`3GPP TSG WG RAN1 #52 meeting took place in Hilton Sorrento Palace, Sorrento, ITALY.
`The meeting started at 9:10 on Monday 11th February and finished at 17:00 on Friday 15th February 2008.
`
`
`
`The week was scheduled as follows:
`
` Monday: Common session on Agenda items 1, 2, 3, 4 and 6.1.3 – Parallel session in the afternoon for Agenda
`item 5 chaired by Dirk Gerstenberger and discussions on 6.3.4 chaired by Juho Lee.
`
` Tuesday: Parallel session in the morning for Agenda item 7 chaired by Dirk Gerstenberger and discussions on
`6.3.4 chaired by Juho Lee. Parallel session in the afternoon for Agenda items 8, 9, 10 and 11 chaired by Dirk
`Gerstenberger and discussions on 6.1.3 chaired by Stefan Parkvall. No contributions to AI 12.
`
` Wednesday: Parallel session for Agenda item 6.3.3 and discussions on 6.2 (chaired by Sadayuki Abeta) –
`Common session on Agenda items 6.1.7, 6.1.6 and 6.1.4 in the afternoon.
`
` Thursday: Common session on Agenda items 6.3.2, 6.1.5, 6.1.2 and 6.1.1.
`
` Friday: Common session on Agenda items 6.4 and 6.3.6. Review of the parallel session’s results and pending
`action points before closure.
`
`
`
`The list of action points that required RAN1 close follow-up is listed in Annex F (end of document).
`
`
`
`The number of contribution documents for this meeting was 504, and those documents were categorized as followed.
`
`Agenda Item
`Liaison statement handling
`Maintenance of R99, Rel4, Rel5, Rel6, Rel7
`Evolved UTRA and UTRAN
`Enhanced Uplink for Cell_FACH State in FDD
`Study Item on Synchronized E-DCH
`Study Item on HS-PDSCH serving cell change
`enhancements
`Study Item on Scope of future HSPA Evolution for
`1.28Mcps TDD
`Work Item on 64QAM for 1.28Mcps TDD HSDPA
`Work Item on Enhanced CELL_FACH state in
`1.28Mcps TDD (UL/DL)
`
`Input
`Document
`23
`25
`385
`20
`41
`7
`
`Discussed
`Document
`22
`24
`
`19
`36
`7
`
`2
`1
`-
`
`2
`1
`-
`
`
`
`
`
`3 3
`
`Ericsson Exhibit 1023
`ERICSSON v. ETRI
`
`
`
`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`The following set of documents is missing. The corresponding contributions have not been handed over by companies.
`
`R1-081166
`
`R1-080656
`
`Bitwidths for CQI reporting on PUCCH for MIMO support
`
`Qualcomm Europe
`
`R1-080657
`
`System analysis comparing best-M and cycling CQI report
`mechanisms
`
`Qualcomm Europe
`
`R1-080743
`
`System Results for Nd=3
`
`R1-080780
`
`Simulation on the 64-QAM modulation indication scheme for
`1.28Mcps TDD
`
`R1-080818
`
`UE-specific RS pattern
`
`R1-080867
`
`Uplink SRS, discussion/proposals on remaining issues
`
`R1-080901
`
`Holes in the L1 specification
`
`Motorola
`
`ZTE
`
`Philips
`
`Ericsson
`
`Ericsson
`
`R1-081059
`
`Consideration of Supportable MCS for E-UTRA DL
`
`Texas Instruments
`
`R1-081060
`
`CQI Reporting Procedure for E-UTRA
`
`R1-081061
`
`CQI and PMI Report Combinations on PUSCH
`
`Texas Instruments
`
`Texas Instruments
`
`R1-081070
`
`Way forward on modifying LBRM procedure to avoid inconsistency
`
`Broadcom
`
`R1-081154
`
`TR25.823 v0.1.4
`
`Nokia Siemens Networks
`
`
`
`
`
`
`
`4 4
`
`Ericsson Exhibit 1023
`ERICSSON v. ETRI
`
`
`
`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`R1-081166
`
`Opening of the meeting
`1
`Mr. Dirk Gerstenberger (RAN1 Chairman) welcomed the participants to the 52sd RAN WG1 meeting and opened the
`meeting at 09:10.
`
`Mr. Enrico Buracchini from Telecom Italia welcomed the delegates on behalf of the European Friends of 3GPP.
`
`Call for IPR
`1.1
`The Chairman drew attention to Members’ obligations under the 3GPP Partner Organizations’ IPR policies. Every
`Individual Member organization is obliged to declare to the Partner Organization or Organizations of which it is a
`member any IPR owned by the Individual Member or any other organization which is or is likely to become
`essential to the work of 3GPP.
`
`
`The attention of the members of this Technical Specification Group is drawn to the fact that 3GPP
`Individual Members have the obligation under the IPR Policies of their respective Organizational Partners
`to inform their respective Organizational Partners of Essential IPRs they become aware of.
`
`The members take note that they are hereby invited:
`
`to investigate in their company whether their company does own IPRs which are, or are likely to become
`Essential in respect of the work of the Technical Specification Group.
`
`to notify the Director-General, or the Chairman of their respective Organizational Partners, of all
`potential IPRs that their company may own, by means of the IPR Statement and the Licensing declaration
`forms (e.g. see the ETSI IPR forms http://webapp.etsi.org/Ipr/).
`
`Approval of the agenda
`
`
`
`
`
`
`
` 2
`
`Draft Agenda for RAN1#52 meeting
`R1-080630
`Dirk Gerstenberger (Chairman) proposed the agenda for the meeting.
`
`RAN1 Chairman
`
`Discussion (Question / Comment):
`Decision: The agenda was approved.
`
`Approval of the minutes from previous meeting
`
` 3
`
`
`
`Draft report of RAN1#51 bis meeting
`R1-080631
`The document was presented by Patrick Mérias.
`
`Discussion (Question / Comment):
`Decision: The document is approved.
`
`MCC Support
`
`5 5
`
`Ericsson Exhibit 1023
`ERICSSON v. ETRI
`
`
`
`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`4
`
`Liaison statement handling
`
`R1-081166
`
`= R2-080520
`RAN2, Ericsson
`Response LS on BCCH transmission
`R1-080632
`The document was presented by Erik Dahlman from Ericsson and reports decisions made in RAN2 on BCCH
`transmission.
`
`Discussion (Question / Comment): Mr Chairman suggested discussing with RAN2 colleagues if additional information
`on what has been decided is still required.
`Decision: Document is noted.
`
`
`
`Reply LS on various aspects related to GERAN to E-UTRAN
`R1-080635
`interworking
`The document was presented by Juan Montojo from Qualcomm.
`
`RAN2, Qualcomm
`
`= R2-080609
`
`Discussion (Question / Comment): No change to Physical Layer Cell ID is expected.
`Decision: Document is noted.
`
`
`
`LS on LS on enhancing radio bearer parameters in 34.108 for
`R1-080636
`64QAM, MIMO and Enhanced Layer 2
`The document was presented by Arto Lehti from Nokia.
`
`RAN2, Nokia
`
`= R2-080618
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`Response LS to RAN1 and RAN2 on HSPA RB and SRB
`R1-081041
`configurations in 34.108
`The document was presented by Johan Bergman from Ericsson.
`
`RAN5, Ericsson
`
`= R5-080525
`
`Discussion (Question / Comment):
`Decision: Document is noted. Document shall be revisited providing more time for reviewing the parameters definition.
`Reply LS in R1-081051.
`Friday 15th
`
`R1-081051
`
`Draft Reply LS on HSPA RB and SRB configurations in 34.108
`
`Ericsson
`
`The document was presented by Johan Bergman from Ericsson.
`
`Discussion (Question / Comment):
`Decision: Document is noted. Final LS is agreed in R1-081144.
`
`
`
`LS to RAN1 and RAN2 on new MCCH radio bearer configuration
`R1-081042
`in 34.108
`The document was presented by Johan Bergman from Ericsson.
`
`RAN5, Ericsson
`
`= R5-080526
`
`Discussion (Question / Comment):
`Decision: Document is noted. Document shall be revisited during the week. Reply LS in R1-081052.
`Friday 15th
`
`R1-081052
`
`Draft Reply LS on new MCCH radio bearer configuration in 34.108
`
`Ericsson
`
`The document was presented by Johan Bergman from Ericsson.
`
`Discussion (Question / Comment):
`
`6 6
`
`Ericsson Exhibit 1023
`ERICSSON v. ETRI
`
`
`
`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`Decision: Document is noted. Final LS is agreed in R1-081145.
`
`
`
`Physical-layer parameters to be configured by RRC
`R1-080900
`Document was not available. Recheck during the week.
`Friday 15th
`
`Decision is made to prepare LS for email approval until February 22sd.
`
`
`
`R1-081166
`
`Ericsson
`
`
`
`LS on RACH retransmission delay
`R1-080637
`The document was presented by Hidetoshi Suzuki from Panasonic.
`
`RAN2, Panasonic
`
`= R2-080621
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-080897
`Draft reply LS on RACH retransmission delay
`The document was presented by Stefan Parkvall from Ericsson.
`
`Ericsson, Fujitsu
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-080987
`Draft LS response on RACH transmission delay
`The document was presented by Hidetoshi Suzuki from Panasonic.
`
`Panasonic
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`
`
`Based on proposed responses (R1-080897/R1-080967), LS reply shall be prepared in R1-081054
`Friday 15th
`
`R1-081054
`Draft reply LS on RACH retransmission delay requirements
`The document was presented by Hidetoshi Suzuki from Panasonic.
`
`Ericsson, Panasonic,
`LG, Fujitsu
`
`
`
`Discussion (Question / Comment): Further checking on UE minimum processing delay is requested.
`Decision: Document is noted. LS for email approval until February 22sd
`
`
`
`R1-080766
`UL Sub-frame Bundling and VoIP coverage
`Nortel
`
`The document was presented by (…) from Nortel and looks at the performance of TTI bundling in order to improve the
`UL VoIP coverage. A comparison between 2 methods for ACK/NAK transmissions for persistent users is provided and the
`paper recommends adopting method 1 for ACK/NAK signalling for UL sub-frame bundling.
`
`Discussion (Question / Comment): Alcatel-Lucent requested some explanation on how Nortel’s conclusions have been
`obtained.
`Decision: Document is noted.
`
`R1-080831
`UL coverage considerations for VoIP transmission
`Philips, NXP
`
`The document was presented by Matthew Baker from Philips and proposes a way forward for the UL VoIP coverage issue,
`based on TTI bundling while keeping the retransmission latency short.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`7 7
`
`Ericsson Exhibit 1023
`ERICSSON v. ETRI
`
`
`
`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`R1-081166
`
`R1-080865
`On Uplink coverage for LTE
`Ericsson
`
`The document was presented by Stefan Parkvall from Ericsson and compares TTI bundling and L2 segmentation and
`concludes in favour of TTI bundling.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`Alcatel-Lucent
`Performance Comparison of Solutions for Subframe Bundling
`R1-080913
`The document was presented by Rainer Bachl from Alcatel-Lucent and addresses the two possible solutions for the issue
`with uplink coverage for LTE (performance comparison). Conclusions are:
`
` Alternative 2 provides a 1-3 dB coverage improvement compared to Alternative 1 for VoIP
`
` Unlike Alternative 1, Alternative 2 allows LTE VoIP to achieve similar coverage compared to HSUPA VoIP
`(10ms TTI), which is necessary in overlay scenarios
`
` Alternative 2 should be chosen as the solution to improve LTE uplink coverage
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`Alcatel-Lucent
`Implications of Solutions for Subframe Bundling
`R1-080914
`The document was presented by Rainer Bachl from Alcatel-Lucent. As both proposed solutions for the issue with uplink
`coverage for LTE make use of subframe bundling, this contribution discusses possible implications of the subframe
`bundling solutions on the standards specification.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Based on above set of contributions, Mr Chairman suggested informing RAN2 about RAN1 discussions mainly on
`Subframe bundling including Qualcomm’s comment, namely as follows:
`
` Subframe bundling is beneficial for coverage
`
`
`
`3 different alternatives are proposed
`
` One semi-static configuration of number of subframes in a bundle
`o Minimize the number of semi-static configurations of number of subframes in a bundle
`o on/off signalling of bundling
`Note: Code rate >1 is not precluded by this decision for first HARQ transmission (this needs to be discussed separately as
`part of MCS discussions)
`
`Tdoc number allocated to the LS shall be R1-081053.
`Wednesday 13th
`
`DRAFT Reply LS on Uplink Coverage for LTE
`R1-081053
`The document was presented by Stefan Parkvall from Ericsson.
`
`Discussion (Question / Comment):
`Decision: Document is noted and final LS agreed in R1-081103.
`
`
`
`Ericsson
`
`
`
`8 8
`
`Ericsson Exhibit 1023
`ERICSSON v. ETRI
`
`
`
`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`R1-081166
`
`5.
`
`Maintenance of UTRA R99 – Rel-8
`
`25.212 CR260 (Rel-8, F) Correction of RV mapping in HS-SCCH
`R1-080757
`QUALCOMM Europe
`
`type 3 for 64-QAM support
`The document was presented by (…) from Qualcomm and clarifies that the same RV mapping as in case of 16-QAM shall
`be used.
`
`Discussion (Question / Comment): Qualcomm mentioned that CR was identical to NSN (R1-080832).
`Decision: Document is noted.
`
`25212CR0261 (Rel-8, F), Correction to RV-coding in case of
`R1-080832
`simultaneous usage of 64QAM and MIMO
`The document was presented by Karri Ranta-aho from NSN.
`
`Nokia, Nokia Siemens
`Networks
`
`
`
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`
`R1-080833
`25214CR0479 (Rel-7, F), Correction to UE grant monitoring
`The document was presented by Antti Hiltunen from Nokia.
`
`Nokia, Nokia Siemens
`Networks
`
`
`
`Discussion (Question / Comment): Both Philips and Ericsson asked for reviewing off line the content together with
`Nokia and cleaning-up.
`Decision: Document is noted and shall be revisited during the week.
`
`R1-080834
`25214CR0480 (Rel-8, A), Correction to UE grant monitoring
`Refer to previous document and decision.
`Friday 15th
`
`Nokia, Nokia Siemens
`Networks
`
`
`
`Extra time is needed for reviewing. Thus, R1-080833 (resp. R1-080834) shall be revised in R1-081146 (resp. R1-081147)
`for email approval until February 22sd.
`
`
`
`
`QUALCOMM Europe
`Reducing smallest E-TFCI value
`R1-080806
`The document was presented by Sharad Sambhwani from Qualcomm and evaluates the link level performance of reducing
`the smallest E-TFCI values as well as the L2 implications of MAC segmentation.
`
`As a conclusion, both the Link Budget analysis and MAC segmentation study indicate that there is no benefit of reducing
`the transport block sizes beyond 120 bits. In particular it is sufficient to segment the AMR Full Rate frame (VoIP or CS
`Voice over HS) into 3 segments of 120 bits each. It is no point trying to optimize segmentation of the SID frames, since the
`cell edge boundary must support transmission of full rate frames.
`
`Discussion (Question / Comment):
`Decision: Document is noted. This topic can be revisited if requested after having further discussed with RAN2.
`Friday 15th
`
`Conclusion: There is no agreement for reducing smallest E-TFCI.
`
`R1-080904
`HS-SCCH orders for HS-SCCH-less operation
`Ericsson
`
`The document was presented by Johan Bergman from Ericsson and proposes to introduce HS-SCCH orders for activation
`and deactivation of HS-SCCH-less operation, so that the HSDPA scheduler in the serving NodeB can signal dynamically
`to the UE whether HS-SCCH-less operation is required or not (to avoid unnecessary UE battery consumption).
`
`Ericsson is willing to discuss the way making the change either as a Rel-7 correction or as a part of the ongoing Rel-8
`work item on UE DRX enhancements.
`
`9 9
`
`Ericsson Exhibit 1023
`ERICSSON v. ETRI
`
`
`
`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`Discussion (Question / Comment): Find out whether there are L2 and L3 implications (Nokia concerns)
`Node B controlling the switching on/off is foreseen as the best alternative.
`Decision: Document is noted and RAN1/RAN2 CRs (including stage 2) shall be prepared for next meeting, based on the
`HS-SCCH orders to switch HS-SCCH-less transmission off.
`
`R1-081166
`
`
`
`
`Ericsson
`Initial Multi-Carrier HSPA performance evaluation
`R1-080902
`The document was presented by Johan Bergman from Ericsson and addresses some aspects of a potential multi carrier
`(MC) operation of a HSPA system. The paper concludes that higher data rates are achievable for most users, including
`users experiencing low and moderate SNR, resulting in more users having access to high data rates. Furthermore, due to
`scheduling gains, the system capacity is also expected to be increased compared to system where the carriers are used
`independently.
`
`Discussion (Question / Comment): Nokia raised concern on the number of users used for the performance simulation.
`Decision: Document is noted.
`
`
`
`
`RITT
`Introduction of optimized FS2 for TDD
`R1-080660
`The document was presented by Lin Hui from RITT and reflects the impact on stage 2 spec TS 36.300 for removing the
`FS1 for TDD and introducing the optimized FS2.
`
`Discussion (Question / Comment):
`Decision: Document shall be revisited on Wednesday.
`Thursday 14th
`
`No comments and the attached draft LS in agreed in R1-081112.
`
`
`
`
`CATT
`25.221 CR0152 (Rel7,F) E-AGCH timing for 1.28Mcps TDD EUL
`R1-080783
`The document was presented by Ke Wang from CATT and introduces the changes on timing between E-AGCH and E-
`DCH nE-AGCH to 7 timeslots minimum for LCR TDD.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`25.221CR0153 (Rel7,F) Clarification of the description about E-
`R1-080784
`PUCH for 1.28Mcps TDD EUL
`The document was presented by Ke Wang from CATT.
`
`CATT
`
`
`
`Discussion (Question / Comment):
`Decision: Document is agreed
`
`
`
`25.222 CR0144r1 (Rel7,F) Some corrections for 1.28Mcps TDD
`R1-081064
`EUL
`The document was presented by Ke Wang from CATT.
`
`CATT
`
`(R1-080785)
`
`Discussion (Question / Comment):
`Decision: Document is agreed
`
`25.222 CR0145 (Rel7,F) Clarification on TFCI mapping for
`R1-080790
`1.28Mcps TDD MBMS
`The document was presented by (…) from CATT
`
`Discussion (Question / Comment): Philips reported typo errors
`Decision: Document is noted and shall be revised in R1-081065.
`Friday 15th
`
`10 10
`
`CATT
`
`
`
`Ericsson Exhibit 1023
`ERICSSON v. ETRI
`
`
`
`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`R1-081065
`
`25.222 CR0145r1 (Rel7,F) Clarification on TFCI mapping for 1.28Mcps
`TDD MBMS
`
`CATT
`
`R1-081166
`
`The document was presented by (…) from CATT
`
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`
`
`
`TD Tech
`25.224 CR0174 (Rel-7, F) on EUL power control clarification
`R1-080782
`TD Tech mentioned that this CR was also partially covered by next document.
`
`25.224 CR0177 (Rel7,F) Clarification and Correction of E-PUCH
`R1-080788
`power control for LCR TDD
`The document was presented by Ke Wang from CATT.
`
`CATT
`
`
`
`
`
`Discussion (Question / Comment):
`Decision: Document is noted. Second change is agreed in principle and shall be written in separate CR (R1-081066).
`
`It’s also decided to discuss off line the merge between R1-080782 and first change in R1-080788. This shall be revisited
`later in the week.
`Friday 15th
`
`R1-081066
`
`25.224 CR0177r1 (Rel-7, F) Clarification and Correction of E-PUCH
`power control for LCR TDD
`
`CATT
`
`The document was presented by Ke Wang from CATT.
`
`Discussion (Question / Comment):
`Decision: Document is agreed. The question in relation with first change in R1-080788 is postponed as discussion shall
`continue.
`
`
`
`25.224 CR0175 (Rel7,F) Clarification of the E-AGCH monitoring
`R1-080786
`for 1.28Mcps TDD EUL
`The document was presented by (…) from CATT.
`
`CATT
`
`
`
`Discussion (Question / Comment):
`Decision: Document is noted. This CR shall be revisited after off line discussion.
`Friday 15th
`
`Discussion to continue
`
`
`
`25.224 CR0176 (Rel7,F) Improvement of the UL synchronisation
`R1-080787
`CATT
`
`of E-PUCH for 1.28Mcps TDD EUL
`The document was presented by Ke Wang from CATT and proposes improvement of the UL synchronisation of E-PUCH.
`
`Discussion (Question / Comment): RITT raised concern on wording. Mr Chairman recommended not leaving track
`changes on CR cover sheet in order avoiding confusion.
`Decision: Document is noted. This CR shall be revisited after off line discussion.
`Friday 15th
`
`No objection from off line discussion. R1-080787 is agreed.
`
`
`
`R1-080789
`
`25.224 Cr0178 (Rel7,F) Improvement of the non-scheduled E-
`DCH transmission procedure for 1.28Mcps TDD EUL
`
`CATT
`
`
`
`11 11
`
`Ericsson Exhibit 1023
`ERICSSON v. ETRI
`
`
`
`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`The document was presented by Ke Wang from CATT. An improvement of the non-scheduled E-DCH transmission
`procedure is Discussion (Question / Comment):
`
`R1-081166
`
`Decision: Document is noted. This CR shall be revisited after off line discussion.
`Friday 15th
`
`CR to TS 25.321 shall be prepared and discussed at next RAN2 meeting.
`
`
`
`
`
`
`QUALCOMM Europe
`Potential issues with large DRX cycles
`R1-080805
`The document was presented by Sandip Sarkar from Qualcomm and discusses strength/weakness of an enhancement to the
`CPC UE DRX in CELL_DCH.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`Ericsson
`On the introduction of a second UE DRX cycle in CELL_DCH
`R1-080903
`The document was presented by Johan Bergman from Ericsson and discusses some concerns with R1-080387, “Enhanced
`UE DRX for CELL_DCH state”, proposed by Nokia Siemens Networks, Nokia.
`
`Discussion (Question / Comment): NSN acknowledged all the observations made in the paper and agreed on the
`necessity for elaborating further the introduction of a second UE DRX cycle in CELL_DCH.
`Decision: Document is noted.
`
`Conclusion: Second DRX cycle for cell_DCH is not recommended by RAN1.
`
`
`
`
`
`12 12
`
`Ericsson Exhibit 1023
`ERICSSON v. ETRI
`
`
`
`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`6.
`
`6.1
`
`Evolved UTRA and UTRAN
`
`Finalization of TS 36.211
`
`R1-081166
`
`R1-080898
`Draft CR to 36.211 v8.1.0 including decisions from RAN1#51bis
`Ericsson
`
`The document was presented by Stefan Parkvall from Ericsson and provides a collection of changes that have been
`decided for inclusion into TS 36.211 as listed below:
`
`Specification of DwPTS/UpPTS lengths, UL/DL allocations (TDD); specification of VRB-to-PRB mapping (RB);
`definition of channelization for PUCCH format 0 and 1 (UL ctrl); specification of uplink reference-signal group hopping
`(UL RS); specification of RACH format 4 (RACH); specification of PHICH-to-RE mapping (DL ctrl); introduction of
`guard time for half-duplex FDD (HD-FDD); clarified support of single antenna port only for MBSFN (MBSFN); PBCH
`moved to second slot for both FDD and TDD (PBCH); specification of pseudo-random sequences for downlink reference
`signals (DL RS); scrambling sequences changed to length-31 (scrambling); normalization of large-delay CDD (PDSCH);
`normalization of DFT-precoder (PUSCH); editorial clarifications in multiple sections (editorial)
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`Thursday 14th
`
`Decision is made to endorse draft CR and to use R1-080898 as the basis for inclusion of additional corrections from up
`coming decisions.
`
`
`
`
`
`Downlink reference signals
`6.1.1
`Remaining issues on DL reference signals, e.g.
`
` UE specific RS pattern
`
`Initialisation of shift registers for PRBS generation (see also scrambling)
`
`
`
`
`Samsung
`Summary of Reflector Discussions on EUTRA DL RS
`R1-080661
`The document was presented by Aris Papasakellariou from Samsung providing feedback on topics discussed over email
`reflector.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`From the summary:
`
`Dedicated RS (DRS)
`
` DRS Pattern
`
`R1-081108
`
`Way Forward on Dedicated Reference Signal Design for LTE
`downlink with Normal CP
`
`Motorola, Nortel,
`Broadcomm, Nokia,
`NSN, NTT DoCoMo,
`NEC, Mitsubishi,
`Alcatel-Lucent, CATT,
`Huawei, Sharp, Texas
`Instrument, ZTE,
`Panasonic, Philips,
`Toshiba
`
`
`
`The document was presented by (…) from (…).
`
`Discussion (Question / Comment):
`Decision: Document is noted. The way forward is agreed with following note:
`
`13 13
`
`Ericsson Exhibit 1023
`ERICSSON v. ETRI
`
`
`
`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`o Support of DRS operation is a UE capability for FDD/TDD
` CQI Estimation
`o CQI estimation (DL) is always based on CRS
`
`
`
`RS Orthogonal Sequences
`
`R1-081166
`
`Nokia, Nokia Siemens
`Networks, Broadcom,
`Freescale, Huawei, LG
`Electronics, NXP
`Semiconductors,
`Samsung, Texas
`Intruments, ZTE,
`NextWave Wireless
`
`(R1-081047)
`
`R1-081096
`
`Way Forward on Orthogonal Sequences for DL Reference
`signals
`
`The document was presented by Asbjörn Grovlen from Nokia.
`
`Discussion (Question / Comment):
`Decision: Document is noted and the way forward is agreed.
`
`
`
`Pseudo-Random RS Sequences
`
` Covered in scrambling section (6.1.6)
`
`
`
`DRS pattern for extended CP for 12 RS
`
` Needs further discussion
`
`
`
`The following set of documents has not been treated.
`
`R1-080638
`
`Further details on dedicated RS structure for DL beamforming
`
`Qualcomm Europe
`
`R1-080639
`
`RS power balancing in the spatial domain and interference
`estimation issues
`
`R1-080640
`
`Specification details for PRS sequences
`
`Qualcomm Europe
`
`Qualcomm Europe
`
`R1-080767
`
`R1-080768
`
`Performance evaluation of Dedicated RS Structures for Beam-
`Forming Transmission
`Channel Estimation Performance Evaluation on PDCCH in BF
`Zones
`
`Nortel
`
`Nortel
`
`R1-080795
`
`UE specific reference pattern
`
`CATT, CMCC, RITT
`
`R1-080796
`
`Multiplexing of UE-specific RS and cell-specific RS in DL
`
`R1-080817
`
`Open issues on UE-specific RS
`
`R1-081013
`
`Clarifications in cell specific RS power boosting
`
`R1-081014
`
`Problems with unequal RS power scaling per antenna for control
`and broadcast channels
`
`R1-081033
`
`Views on Dedicated RS Structure in E-UTRA Downlink
`
`CATT
`