throbber
US006324404B1
`
`a2 United States Patent
`
`Dennison et al.
`
`(10) Patent No.:
`5) Date of Patent:
`
`US 6,324,404 B1
`#Nov. 27, 2001
`
`(54)
`
`(75)
`
`(73)
`
`*)
`
`@D
`(22)
`
`(63)
`
`CELLULAR TELEPHONE SYSTEM THAT
`USES POSITION OF A MOBILE UNIT TO
`MAKE CALL MANAGEMENT DECISIONS
`
`Inventors: Everett Dennison, Canficld, OH (US);,
`Timothy J. Duffy, West Middlesex, PA
`(US); Gregory T Pauley, Canficld, OH
`(US); Scott L. Jones, Sharon, PA (US);
`Albert H. Pharis, Jr., Canfield;
`Warren P. Williamson, IV, Loveland,
`both of OH (US)
`
`Assignee: Sycord Limited Partnership, Zephyr
`
`Cove, NV (US)
`
`Notice: This patent issued on a continued pros-
`ecution application filed under 37 CFR
`1.53(d), and is subject to the twenty year
`patent term provisions of 35 U.S.C.
`
`154(a)(2).
`
`Subject to any disclaimer, the term of this
`patent is extended or adjusted under 35
`U.S.C. 154(b) by 0 days.
`
`This patent is subject to a terminal dis-
`claimer.
`
`Appl. No.:
`Filed:
`
`08/848,082
`Mar. 21, 1996
`
`Related U.S. Application Data
`
`Continuation-in-part of application No. 08/813,494, filed on
`Mar. 7, 1997, now Pat. No. 6,006,106, which is a continu-
`ation-in-part of application No. 08/555,884, filed on Oct. 23,
`1995, which is a continuation-in-part of application No.
`08/402,976, filed on Mar. 13, 1995, which is a continuation
`of application No. 08/057,833, filed on May 7, 1993, which
`is a continuation of application No. 07/813,494, filed on
`Dec. 26, 1991, now Pat. No. 5,235,633.
`
`(FROM 107 FIG. 8)
`
`(51) Int.Cl7 H04Q 7/20
`(52) US.ClL . 455/456; 455/406; 455/432
`(58) Field of Search 455/422, 432,
`
`455/436, 440, 456, 405-409, 445
`
`References Cited
`
`(56)
`U.S. PATENT DOCUMENTS
`
`5,235,633 * 8/1993 Dennison et al. .....ccecerveennene 455/456
`5,303,297 * 4/1994 Hillis .cccoeevevreneencnecereeeenne 455/406
`5,546,445 * 8/1996 Dennison et al. .....ccccoeeeueene 455/456
`
`FOREIGN PATENT DOCUMENTS
`
`2-210923 * 2/1989 (IP).
`
`* cited by examiner
`
`Primary Examiner—Dwayne D. Bost
`Assistant Examiner—Nay Maung
`(74) Attorney, Agent, or Firm—Terry M Gernstein
`
`(7) ABSTRACT
`
`A cellular telephone system has call management decisions
`made based on the exact geographic location of the mobile
`unit. These call management decisions include billing and
`taxing decisions, cell site selection, frequency selection and
`even cellular system selection. The decisions are continu-
`ously updated during a call whereby decisions can be made
`and changed regardless of where a call originated. Cell site
`location, and even cellular system selection, can be made in
`a specific manner to best serve the needs of the mobile user,
`the cellular system as well as the public. It is even possible
`for a cellular system to locate one or more of its cell sites in
`the geographic area served by another cellular system. In
`some cases, cellular systems might even share cell sites.
`
`41 Claims, 21 Drawing Sheets
`
`'CD IDENTIFIED FOR
`SUBSCRIBER
`
`CHARACTERISTICS |
`
`PROPER CALL ROUTE
`
`‘OPTIMUM ROUTING
`BASED ON EGL
`OFTHECD 4
`
`LOCATION
`INFORMATION
`vo
`
`‘SUBSCRIBER
`DATABASE
`
`ANNOUNCEMENT
`ROUTING ..
`
`{70 108 FIG. 8)
`
`FIG. 9B
`CALLROUTING
`(107 OF FIG. 8)
`
`|
`|
`|
`I
`|
`|
`|
`|
`|
`|
`| SELECTED FOR
`|
`[
`I
`I
`I
`|
`|
`|
`|
`|
`|
`
`SUBSGRIBER
`DATABASE IDOF THECD,
`
`TELL PSAP WHO IS THE
`GOMMUNICATIONS
`PROVIDER,
`
`EGLOF THECD,
`
`MEDICAL HISTORY. ETC.
`w0
`
`
`
`
`
`
`
`
`
`U.S. Patent
`
`Nov. 27, 2001
`
`Sheet 1 of 21
`
`US 6,324,404 Bl
`
`BASE
`~ /©
`.
`MOBILE
`- =
`FROM/TO 18 14 15 FROM/TO 8 4
`BASE MOBILE
`ANTENNA ANTENNA 6
`T 1 \
`RECEIVER : TRANSMITTER RECEIVER ! TRANSMITTER "O
`_____ e e ——— — o] 17 e o o e o - e o 5\
`CONTROL . / CONTROL <t
`TERMINAL - LOGIC \ 4
`—
`TELEPHONE CELL SITE MOBILE UNIT
`LAND LINE 20
`e
`CD
`l \
`| 12A CENTRAL
`OFFICE
`| N, |
`| |
`| | FIXED-POSITION
`LAND-BASED
`I o I TELEPHONE
`L _ O R | sN
`12 TRANSMISSION
`
`LINK, L1
`
`v
`
`FIGT.
`(PRIOR ART)
`
`
`
`
`
`
`
`
`U.S. Patent Nov. 27, 2001 Sheet 2 of 21 US 6,324,404 B1
`
`IDLE MOBILE UNIT SCANS
`OVERHEAD MESSAGE TO
`DETERMINE WHAT CELL
`SIGNAL IS STRONGEST.
`
`y
`
`MOBILE UNIT LOCKS
`ONTO THAT CELL.
`
`LAND INITIATED CALL
`TRANSFERRED FROM
`TELEPHONE TO MTSO.
`ANEIGHBOR CELL WILL IDENTIFY
`‘ THAT IT HAS THE MOBILE UNIT
`AT A PARTICULAR STRENGTH
`MTSO SENDS OUT A ‘
`“LOCATE REQUEST” ‘
`SIGNAL TO ALL CELLS, TS0 COMPARES NEW
`‘ STRENGTH WITH TABLE OF
`: ALLOWABLE SIGNAL STRENGTHS.
`THAT CELL RELAYS ID
`INFORMATION TO MTSO : ‘
`STS;ITNSEWSBT&ESSS.CE MTSO SIGNALS MOBILE
`UNIT VIA OLD CELLTO
`‘ RETUNE TO NEW CELL.
`MTSO ESTABLISHES VOICE *
`AND DATA LINKS WITH
`MOBILE UNIT VIA THE CELL. MOBILE UNIT RETUNES
`‘ TO NEW CELL.
`CELL CHECKS SIGNAL STRENGTH. L
`MTSO RE-ROUTES
`l (HANDS OFF) THE MOBILE
`UNIT TO THE NEW CELL.
`IF SIGNAL STRENGTH DROPS
`BELOW A THRESHOLD LEVEL,
`CELL SIGNALS MTSO.
`MTSO SENDS OUT A F l G : 2 :
`“LOCATE REQUEST” PRIOR ART
`TO ALL NEIGHBOR CELLS,
`
`
`
`
`
`
`
`
`
`US 6,324,404 B1
`
`Sheet 3 of 21
`
`Nov. 27, 2001
`
`U.S. Patent
`
`¢ 9l4
`
`Kiopunog WaySAS 4aju|
`
`\3»
`
`2o}
`
`age-
`sseo \ %95t
`Sa> ¥ 1a%- ////
`WV %
`‘gt mwM
`8 AHOLIMYIL P /Jv J
`/
`
`dolanp
`
`4 [J.AHOLIMN3L ¥
`
`D
`
`DTS P A
`
`19
`
`
`
`
`
`
`
`
`
`U.S. Patent Nov. 27, 2001 Sheet 4 of 21 US 6,324,404 B1
`
`Null Zones (Hatched)
`
`120°Antenna Array (2)
`240° Coverage
`
`Authorized
`. Terrttory'J ’
`
`180° Antenna
`
`‘Prior Art’
`Null Zone Problem
`
`Authorized
`Territory'H’
`MTSO ~<
`
`
`
`
`
`
`
`
`US 6,324,404 B1
`
`Sheet 5 of 21
`
`Nov. 27, 2001
`
`U.S. Patent
`
`VG 9l4
`
`1]
`=
`
`lllm
`
`il
`
`Il
`
`HLEIH
`WSS
`
`A
`@ A f041a49)
`ERITVETS
`
`——
`P —— e e —
`
`1do [
`M= 2dd |
`Fa
`— - 1
`m.mm._ Al -
`= - j
`7~
`y: e 4 7,
`/
`P
`7 - 7
`IV
`/ y/
`/
`S <
`r £dd
`I
`Vs Vs J
`4 ,
`\\\\
`P X
`
`|
`
`faopu nog waysAsaatu|
`{
`
`% % L X A0p1443] 301049
`
`|I\\\\\|\
`
`
`
`
`
`
`
`
`
`US 6,324,404 Bl
`
`Sheet 6 of 21
`
`Nov. 27, 2001
`
`U.S. Patent
`
`-——————— P
`b.ro‘_ofl_E&. ul £3|(DA
`A8AL4 Ul 213404} pOOY
`g 19D 104
`36049402 400d j0 DAY
`! _“ '
`__" 1wl []
`s i ". '
`AL . ." .“"
`.“"- 1
`g (18D
`g Y40MiaN
`
`Aaopunog 3d1A4ag
`
`4G 914
`
`V HAOM3N
`
`B
`
`IV 118D
`
`
`
`
`
`
`
`
`US 6,324,404 Bl
`
`Sheet 7 of 21
`
`Nov. 27, 2001
`
`U.S. Patent
`
`VNN LNV
`WOH4/01
`
`H3AIZ03H
`
`INOHJOHOIN
`
`Sd9
`
`Noe
`
`AHOW3IN
`
`ge
`
`AYLINOHID
`a1901
`
`)
`
`91
`
`v
`
`aQvdAIM
`
`H3IMv3dS
`
`
`
`
`
`
`
`
`
`U.S. Patent Nov. 27, 2001 Sheet 8 of 21 US 6,324,404 B1
`
`20 /
`BASE 22
`ANTENNA
`
`\l\ 1 SATELLITE
`MOBILE GPS RCVR.
`? w
`10 !
`
`S
`
`|« ~|
`
`FROM/TO 18 8 FROM/TO 4!
`BASE 14 MOBILE
`ANTENNA I'4 ANTENNA 6
`. : \r \
`
`RECENETJ TRANSMITTER RECEIVER | TRANSMITTER |
`L e e e — ] 249 | A e
`CONTROL \\~_ GPS CONTROL 7\
`TERMINAL \ RCVR. LOGIC \ =
`7 O
`TELEPHONE CELL MOBILE UNIT ’//
`LAND LINE SITE 5 HANDSET
`F——tf———————————
`|
`I CENTRAL
`I OFFICE |
`i TRANSMISSION |
`I LINK | FIXED-POSITION
`LAND-BASED
`| I TELEPHONE
`| SWITCHING |
`I NETWORK I
`| |
`\ I ————————— e ] ESOSS |
`
`
`
`
`
`
`
`
`US 6,324,404 B1
`
`Sheet 9 of 21
`
`Nov. 27, 2001
`
`U.S. Patent
`
`V. 9Ol
`
`(o)
`
`"NOILYWHOSNI NOILYD07 SdD
`01 103dS3H HLIM LYWHOA
`4vINaY1 NI GaNI43a - ————
`JOVHIA0D 3 LIS T130 HOA
`SHILINVHVD QIHVYdIH4
`
`“TAATT TYNDIS OL
`103dS34 HLIM 1vWHO4
`HYINavL NI d3NId3a
`JOVH3A00 31IS T130 HOA
`SHILINVHYd INFHHND
`
`S3LS TIED OL anwa) [3avL
`
`YN V1vQ | B3N] vea | [ oww | | 30100
`HITIOHINOD
`1nd1NO/ 1NdNi
`
`L
`
`JOvHOlLS J9VHOLS
`WYHO0Hd viva
`
`Nda
`
`S3ILITMOV4 NV
`®S3IUS T30 oL
`STINNVHD 3010A
`
`H3ITI0H1INOD
`JOVSSIN TYHINID
`
`JINAOW
`WHIHdIH3d
`
`JINAonw
`WH3HdIH3d
`
`f
`
`| yHOMLIN
`ONIHOLIMS
`
`
`
`
`
`
`
`
`
`U.S. Patent
`
`Nov. 27, 2001
`
`Sheet 10 of 21
`
`| CD POWERUP flfl
`
`ONLINE USES
`(REAL TIME)
`
`—
`
`— EGL RECORDED
`FOR BILLING
`
`EMERGENCY
`> 911
`120
`B TAXES
`
`121
`
`e CP RATING
`(FIG 9A) 122
`
`CUSTOMER
`SERVICE
`
`123
`
`| FREQUENCY ,,
`
`—»*
`
`|(F.G o) REGISTRATION PROCESS 102 |
`
`v
`
`SET TIMER REGISTRATION 103
`
`YES
`TIMER
`
`EXPIRED ?
`
`IS CP
`INITIATED ?
`
`[¢Fio9) REGISTRATION PROCESS 1 |
`
`US 6,324,404 B1
`
`CHANGING FREQ.
`—®] DUAL FREQUENCY
`(FIG 14) 125
`
`— CHANGE
`CELL SITE 1%
`
`| CHANGE CELL
`SYSTEM
`
`(FiGeB) CP ROUTING 107 | ONE-TIME
`OFFLINE USES
`COMMUNICATIONS
`ESTABLISHED 108 E(EIE)SEB(I:E)LTS(I;ED
`+ > 109
`STORE EGL FOR CP
`MANAGEMENT & BILLING 114
`EMERGENCY
`911
`114A 1148 110
`HAS UPDATE ON
`UPDATE CRITERIA '(':";fig\g:\k
`EXPIRED? (TIME, DISTANCE) TAXES 1
`UPDATE EGL 15 ] CP RATING
`+ (FIG 9A) 112
`USE UPDATED EGL FOR CP CUSTOMER
`MANAGEMENT SERVICE
`AND BILLING DECISIONS 116 113
`NO
`IS CP INVENTIVE SYSTEM
`
`COMPLETED?
`
`[ CP COMPLETED 18 I
`
`FIG.8.
`
`
`
`
`
`
`
`
`U.S. Patent Nov. 27, 2001 Sheet 11 of 21 US 6,324,404 B1
`r— = —— = — — = —
`(FROM 101, 105 OF FIG 8)
`GPS 202
`
`CD EGL DETERMINED
`
`201
`
`SIGNAL STRENGTH 203
`
`LORAN 204
`
`HOME SYSTEM
`
`HOME SYSTEM LOCATION
`SERVICE BOUNDARIES
`
`205
`
`SERVICE BOUNDARY
`
`HOME
`
`YES
`
`CELL LIST
`VOICE CHANNEL
`CCH
`FREQUENCY 206
`
`SYSTEM?
`
`FIG. 2.
`
`I NEIGHBOR Ni
`I CELL LIST
`VOICE CHANNEL
`NEIGHBOR N1 o, [ cCH
`I FREQUENCY 00
`| YES IF
`REDIRECT NEIGHBOR
`o 211 N1 ?
`I NEIGHBOR N2
`l CELL LIST
`VOICE CHANNEL
`| NEIGHBOR N2 ———————— cCH
`212
`| FREQUENCY ,
`I YES IF ‘
`REDIRECT NEIGHBOR EGL DETERMINED
`I Cch 215 Nz ? ‘ 216
`I EGL DETERMINED, _
`| FIG. 9 NNTH *
`REGISTRATION PROCESS
`|_ (102, 106 FIG. 8) (TO 103, 107 OF FIG. 8)
`
`
`
`
`
`
`
`
`U.S. Patent
`
`Nov. 27, 2001
`
`Sheet 12 of 21
`
`(FROM 109. 119 FIG. 8)
`
`!
`
`SUBSCRIBER
`DATABASE
`
`DC IDENTIFIED
`FOR SUBSCRIBER
`CHARACTERISTICS
`
`|
`
`US 6,324,404 Bl
`
`EGL COMPARED TO
`CP RATING TABLE
`
`CP RATING
`TABLE
`
`l
`
`CORRECT CP
`RATING CHOSEN
`
`l
`
`RECORD EGL AND TIME
`
`FOR CP RATING
`
`'
`
`(TO 109, 119 FIG. 8)
`
`FIG. 9A
`CP RATING
`
`
`
`
`
`
`
`
`U.S. Patent
`
`Nov. 27, 2001
`
`Sheet 13 of 21
`
`US 6,324,404 Bl
`
`I_—'_'__———___——_——___—]
`| (FROM 107 FIG. 8) l
`I CD IDENTIFIED FOR SUBSCRIBER |
`SUBSCRIBER l——— DATABASE |
`| CHARACTERISTICS 402
`401
`| YES |
`EMERGENCY
`l 911 CALL? I
`DOWE NO |
`l PROVIDE ANNOUNCEMENT
`I SERVICE? ROUTING 455 ¢ l
`YES ASK FOR CD/RX EGL
`l & RECORD 401 I
`PROPER CALL ROUTE
`| SELECTED FOR — v |
`OPTIMUM ROUTING
`OF THE CD 404 INFORMATIOI\EJ)Q 408
`TELL PSAP WHO IS THE
`| (TO 108 FIG. 8) COMMUNICATIONS |
`SUBSCRIBER PROVIDER,
`I DATABASE —» EGL OF THE CD, fl I
`411 1D OF THE CD,
`MEDICAL HISTORY, ETC.
`| 410 |
`y
`| IF PSAP ASKS FOR EGL, I
`UDATE & RESEND TO PSAP
`| 412 |
`DOES PSAP YES
`| FIG. 98 TRANSFER CALL . |
`CALL ROUTING TO ANOTHER
`l (107 OF FIG. 8) PSAP? |
`= |
`I CALL COMPLETE
`l_ RECORD CP EVENT 414 |
`
`
`
`
`
`
`
`
`US 6,324,404 Bl
`
`Sheet 14 of 21
`
`Nov. 27, 2001
`
`U.S. Patent
`
`spoday
`sjposlay
`sip3
`
`spoday
`swnjey
`
`Sip3
`SoINoY
`
`sesne) 0}
`suoday
`Buyng
`
`aseqele
`Bunig
`
`g
`Jawolsng
`
`Ol 9ld
`
`20IBG JBWIOISNY
`|||||| aus
`“l uofieso] Aq 4_ i
`a{qe) dn oo
`I bupgpre; .“ He
`b\tl Uoijeao
`-~ o = em am e me e -
`' uogeuuo
`. e I e N === 11T
`ey —_ - O
`siED skaps _E.B = ...
`—_— wed PIVTIEERTD
`wed BuioH - s
`idizoay -
`pazuoyny sjieD weoy e
`JAWRD WO 10} pajig Saxe) Bununcooy ebessapy m— —
`aewoINy il
`|||||| OSIW
`"n uoileo] Aq ."
`8jqe dmyooT]
`\ad I Gupg prey .h_
`>\t: |||||| sade] YWy uo padweig
`P = e - - - L] = - "
`1 uogewloy) 1 Lolewlol) g o
`L _ uogeooy Jopuap, L __Uojeooy ¢t L= ______
`Buing N 0 3.,
`Joured L T
`asno Buuesin P S 4 —
`soure) bupieg L e L
`Buwag —.
`spioday SjeQ weoy Bupunoooy sbessapy g | w
`(2= e] 0] X0) sexe] Jewony i1l
`OS1IN
`
`walsAg el
`
`D
`
`washg 1oy
`
`Seo
`Weoy
`
`
`
`
`
`
`
`
`U.S. Patent Nov. 27, 2001 Sheet 15 of 21 US 6,324,404 B1
`
`Inventive System
`Lots of Overlap with no Null Zones
`
`Authorized Territory ‘H'
`Authorized Territory ‘J’
`
`
`
`
`
`
`
`
`U.S. Patent Nov. 27, 2001 Sheet 16 of 21 US 6,324,404 B1
`
`County Boundary C System E
`
`/ | St P’
`
`F==-d-==mmm-—-== 1
`1 1 /
`1 1
`I 1
`t ' CD 10
`i ! °
`1 1
`1 L
`1
`[ 1
`1 1
`. : School District ‘B’
`1 !
`1 1
`b e e e e m = — =
`r--~~~"~*~77=-=---
`' [4
`s eCD9 ,
`4
`, V2 | !
`’
`/ : /7 oCDB8I /
`' 2 J :
`£ § .
`/ e e S
`Systm W
`State ‘O’
`- >~ \
`System ‘W’ System ‘E’ Company ‘A’
`
`Border
`
`Inter System
`
`R FIG.12.
`
`
`
`
`
`
`
`
`¢l 9l
`
`US 6,324,404 Bl
`
`[, Mojua] pazuoyiny
`
`Sheet 17 of 21
`
`Nov. 27, 2001
`
`Aepunog wajsAsiaju|
`
`U.S. Patent
`
`OS1n
`
`sajis 1190 Jo Buueys waysAsialu|
`walsAg aAnuBAUj
`
`
`
`
`
`
`
`
`U.S. Patent Nov. 27, 2001 Sheet 18 of 21 US 6,324,404 B1
`
`
`
`
`
`
`
`
`
`U.S. Patent Nov. 27, 2001 Sheet 19 of 21 US 6,324,404 B1
`
`C1
`FIG.15.
`
`<5Db
`
`Signal Stay
`1Db
`B1 |5Db
`
`CD6 Al
`
`
`
`
`
`
`
`
`
`US 6,324,404 Bl
`
`Sheet 20 of 21
`
`Nov. 27, 2001
`
`U.S. Patent
`
`91 9l4
`
`() Aojluia)
`
`ZHIN 006
`2 wesAs
`
`ZYyn 0002
`Vv walsAs
`
`X Aempeoy
`
`€001Xas
`
`2001Xad
`
`ZHW 006
`Ly welsAg
`
`ZUN 002
`g walsis
`
`(@LAIEFET
`
`1 0071 X040
`
`@Fa041043)
`
`ZHIN 006
`a weishsg
`
`ZYW 0002
`2V WwalsAg
`
`I
`
`
`
`
`
`
`
`
`
`US 6,324,404 B1
`
`Sheet 21 of 21
`
`Nov. 27, 2001
`
`U.S. Patent
`
`Sd9
`
`ayjeies Aq
`aberanoo Juud 1004
`eale xe} aidiyny
`
`AN
`
`£ ealy xe]
`
`| BaY Xel
`
`Hun olpey 9liqon
`oNeres
`
`“
`|
`h
`‘
`~
`AWMV aNeles
`Sd9 HINS
`
`S|qeL
`
`dn oo xel
`/IR (ueroT) SdO
`,/ 20107
`\
`
`Ny “Wwon
`
`N a0I10
`7 (oueA0JO) |
`
`uoledo SdO N
`
`
`
`
`
`
`
`
`
`US 6,324,404 B1
`
`1
`
`CELLULAR TELEPHONE SYSTEM THAT
`USES POSITION OF A MOBILE UNIT TO
`MAKE CALL MANAGEMENT DECISIONS
`
`TECHNICAL FIELD OF THE INVENTION
`
`The present invention relates to the general art of wireless
`over-the-air communication, which includes cellular mobile
`radiotelephone (CMR) technology, and to the particular field
`of managing communication processes in a wireless over-
`the-air communication system. The present application is a
`continuation-in-part of pending U.S. Application Ser. No.
`08/555,884, filed Oct. 23, 1995 which is a continuation-in-
`part of U.S. application Ser. No. 08/402,976, filed Mar. 13,
`1995, which was a CIP of U.S. application Ser. No. 08/813,
`494, filed Mar. 7, 1997 now U.S. Pat. No. 6,006,106, issued
`on Dec. 21, 1999, now U.S. Pat. No. 5,235,494 which is a
`continuation of U.S. application Ser. No. 08/057,833, filed
`May 7, 1993 which is a continuation of U.S. application Ser.
`No. 07/813,494, filed Dec. 26, 1991 and issued as U.S. Pat.
`No. 5,235,633. The disclosures of each of these applications
`is fully incorporated herein by reference. Therefore, as used
`hereinafter, the term “prior art” refers to art that is relevant
`prior to the invention dates associated with this incorporated
`material.
`
`BACKGROUND OF THE INVENTION
`
`The present invention is concerned with wireless over-
`the-air communication using a plurality of transmit/receive
`cell sites or relay points. It should be understood that the
`transmit/receive relay points can be either land based or
`non-land based, such as satellite based, and that as used
`herein, the term “cell site” or its equivalent refers to one of
`the relay points of the system. CMR (Cellular Mobile Radio)
`is an example of one type of wireless over-the-air commu-
`nication system that can be included in the present disclo-
`sure. It is understood that the term CMR is not intended to
`be limiting, but is merely used as an example for the
`purposes of discussion. It is also to be understood that the
`term “cellular telephone system” or its equivalents is
`intended to be shorthand notation for the term “wireless
`over-the-air communications system” and no limitation is
`intended by the use of the term “cellular.” Also, as used
`herein, the terms “CD (Communication Device)” and “MU
`(Mobile Unit)” are intended to include any device used to
`communicate in the wireless over-the-air communication
`system. Also, the term “cellular telephone system” is used
`for purposes of discussion but can include any form of
`wireless over-the-air communication system. It is also noted
`that many forms of communication are and will be con-
`ducted over the wireless over-the-air networks. Therefore,
`the present disclosure will refer to a “communication pro-
`cess” which is intended to cover calls as well as other forms
`of communication that can be conducted in this manner.
`
`CMR is a rapidly growing telecommunications system.
`The typical CMR system includes a multiplicity of cells. A
`particular geographic area can be subdivided into a multi-
`plicity of subareas, with each of the subareas being serviced
`by a stationary transmitter/receiver setup. The cells are set
`up to carry signals to and from mobile units in the range of
`the cell. If one cell site becomes too crowded, it can be
`divided into smaller cells, by a process known as cell site
`splitting. Any particular geographic area can become quite
`complicated with cells overlapping each other, and overlap-
`ping cells of other neighboring cellular systems. Further,
`null zones with inadequate coverage, or even no coverage,
`can result. It is noted that the term “cellular” is intended to
`
`15
`
`20
`
`25
`
`30
`
`35
`
`40
`
`45
`
`50
`
`55
`
`60
`
`65
`
`2
`
`be a term of convenience, and is not intended to be limiting.
`The present disclosure is intended to encompass any com-
`munication system in which an overall area can be divided
`into one or more subareas, and also to any communication
`system having at least some portion of the communications
`occurring over the air.
`
`A typical CMR set up is indicated in FIGS. 1 and 2, and
`will be described so an understanding of the problem to
`which this invention is directed can be obtained.
`
`Shown is a typical cellular telephone unit having a unique
`mobile identification number stored in a suitable location
`such as an electrically erasable programmable read-only
`memory (not shown). Telephone units of this kind are
`known to those skilled in this art, and thus will not be
`described in detail.
`
`The telephone unit includes a handset 4 having a keypad
`5 as well as a speaker 6 and a microphone 7. A transceiver
`8, ordinarily built into the telephone unit, exchanges signals
`via an antenna 10 with a mobile telecommunications switch-
`ing office or MTSO 12 via a cell site 14. A duplexer 15
`connects the antenna to the transceiver. The cell site 14
`includes an antenna 16 connected to a control terminal 17
`via a transceiver 18. The cell site 14 is connected to the
`MTSO via a transmission link 20. The Mobile Telephone
`Switching Office has historically been known as the center
`of the wireless over-the-air communications system. It is
`where the communication process management decisions
`are made, billing records are produced and where mainte-
`nance activities are initiated for wireless over-the-air com-
`munications systems. The MTSO is not a specific piece of
`equipment, but is comprised of many individual pieces. The
`MTSO will contain a telephone switch, peripheral
`processors, adjunct processors, and various other informa-
`tion gathering equipment used in the operation and man-
`agement of a wireless over-the-air communications system.
`Each of the different pieces of equipment may directly or
`indirectly be involved providing the highest quality connec-
`tion possible. The makeup of the MTSO therefore comprises
`many different pieces of equipment and many components,
`which can be supplied by different vendors. Therefore,
`communication process management decisions made at the
`MTSO can actually be made outside of a switch and can be
`made in a cluster of nodes housed along the network or even
`in separate cell sites. Therefore, as used herein the term
`MTSO really refers to all of the systems, nodes, modules,
`equipment and components that combine to define a wireless
`over-the-air communication process management network,
`regardless of the physical or system location of these ele-
`ments. The term MTSO therefore is not intended to be
`limiting to the “switching off ice” as it may have been
`viewed in the prior art. The term is intended to be much
`broader than that and to include any combinations of
`equipment, etc that may be connected within the commu-
`nication processing network of the service provider. The
`term MTSO is one of convenience and is intended to include
`all the information processing hardware and software asso-
`ciated with the wireless over-the-air communication process
`management process within a wireless over-the-air system,
`no matter where the hardware or software is located in the
`system. It is also noted that the term “intrasystem” refers to
`actions and components within a particular system; whereas,
`the term “intersystem” refers to actions and components
`located outside a particular system.
`
`Referring to FIGS. 1 and 2, the operation of the CMR can
`be understood. The mobile unit M moves about the geo-
`graphic areas covered by the various cells. As that mobile
`unit moves about, it decodes the overhead message control
`
`
`
`
`
`
`
`
`US 6,324,404 B1
`
`3
`
`signals generated by various cell site control channels. The
`mobile unit locks onto the cell site that is emitting the
`strongest signal. The mobile unit rescans channels periodi-
`cally to update its status. If, for example, a fixed-position
`land-based telephone T is used to call the mobile unit, a
`signal is sent via landlines L, to the central office CO of a
`public/switched telephone system (PTSN) 12A. This system
`then utilizes the switching network SN associated therewith
`to call the MTSO 12 via a transmission link L1. The MTSO
`then utilizes its own switching network and generates a page
`request signal to cell sites via transmission links, such as the
`transmission link 20. The cell site which has been notified of
`the presence of the mobile unit M sends a signal back to the
`MTSO via the landlines or wireless links alerting the MTSO
`of the presence of the mobile unit. The MTSO then orders
`the mobile unit, via the notifying cell site, to tune to an
`assigned channel and receive the communication process.
`
`On the other hand, during communication process
`origination, the mobile unit rescans the control channels to
`determine which is the best server based on signal strength.
`Upon selecting the best server, the mobile unit transmits cell
`site information on the control channel receive frequency
`and then receives a voice channel to tune to if the mobile unit
`is authorized to place a communication process.
`
`As the mobile unit moves, the signal strength between that
`mobile unit and the originating cell site changes, and per-
`haps diminishes. Since signal strength is an inverse function
`of the square of the distance between the mobile unit and the
`cell site, signal strength can change rapidly and drastically
`as the mobile unit moves with respect to the cell site and
`therefore must be monitored closely. The MTSO has a signal
`strength table, and signal strength from the mobile unit is
`constantly compared to acceptable signal strength levels in
`the table. Such a table can be located in each cell site if
`desired.
`
`Should signal strength diminish below a preset range, the
`MTSO generates a “locate request” signal to all cell sites
`that neighbor the original cell site. Each of such neighboring
`cell sites receiving a signal from the mobile unit signals the
`MTSO, and the signal strengths from such neighboring cell
`sites are checked against the signal strength table. The
`MTSO makes a decision as to which cell site should control
`the communication process, and notifies the original cell site
`to order the mobile unit to retune to a voice channel of the
`new cell site.
`
`As soon as the mobile unit retunes, the mobile unit
`completes the communication process via the new cell site
`channel. This transfer of control is known as a handoff.
`
`Typically, governments grant rights to provide wireless
`communication services to a specified land area based on
`geographic boundaries. Since wireless propagation does not
`end at exact geographic boundaries, many conflicts have
`arisen between service providers as to which service pro-
`vider should provide service at the location from where the
`Communication Process (CP) is being originated or
`received. Today, there are no methods or procedures to
`resolve these issues. A Communication Process (CP) can be
`defined as the exchange of information between communi-
`cation devices, such as, but not limited to, Analog or Digital
`radiotelephones, digital data communications, analog or
`digital video, and the like.
`
`When the initial wireless systems were built, they were
`constructed around major metropolitan areas. This created
`service voids between major metropolitan markets. In these
`early systems, boundary service problems did not arise
`because there were areas of “no service” buffering compet-
`
`10
`
`15
`
`20
`
`25
`
`35
`
`45
`
`50
`
`55
`
`60
`
`65
`
`4
`
`ing systems. Today, as rural systems fill in the patchwork of
`nationwide coverage, network service provision boundary
`disputes are becoming common. Prior to the Dennison, et al
`patent, U.S. Pat. No. 5,235,633 and the patents and appli-
`cations depending therefrom as continuations and
`continuations-in-part, the disclosures of which are fully
`incorporated hereinto by reference, and the invention dis-
`closed herein, it was impossible to honor the exact geo-
`graphic boundaries. Attempts are currently made to control
`coverage boundaries by installing directional antennas and
`adjusting cell site receive and transmit parameters. The
`methods used to match the system boundaries to the geo-
`graphic boundaries are not entirely successful due to the
`variations in terrain, environment and limitations of antenna
`design and wireless propagation. A common result of these
`problems is inadequate wireless signal strength or null
`coverage and border disputes around the geographic bound-
`aries and hence poor service.
`
`The incorporated material, including the Dennison et al
`patent disclose that cell sites sometimes have overlapping
`coverage due to the aforementioned variations in terrain and
`environment, and propose a solution. While the proposed
`solution works well, there is still room for further improve-
`ment in the areas of cost, subscriber service, billing and
`taxing.
`
`Furthermore, wireless propagation, such as but not limited
`to the cellular operating band of 800-900 MHz, is generally
`line-of-site transmission. This presents substantial chal-
`lenges when choosing sites in which to place wireless
`transmit/receive antennas. Boundaries assigned to service
`providers are based on maps depicting the geographic bor-
`ders of service boundaries. The question arises in a disputed
`territory of who will get to service the Communications
`Process (CP). In the past, it has been the cell site that can
`provide the highest signal strength from the CD
`(Communications Device), not the provider that owns the
`legal territorial rights to the Communication Process (CP)
`that has serviced the Communication Process (CP). Until the
`invention disclosed herein, the service provider that could
`receive the best signal would handle the communication
`process (CP), and depending on whether the Communica-
`tion Process (CP) was handed off and/or depending on the
`agreement made between the wireless communication
`systems, possibly keep all of the revenue from the commu-
`nication process CP. Additionally, with real estate values
`being very high in established communities, cell sites are
`harder to construct and more expensive to build. Each cell
`site must be optimized for the maximum effective coverage
`area to overcome the real estate problems encountered when
`constructing a cell site. This in turn creates problems with
`overlapping coverage between wireless systems and thus
`disputes over which wireless system handles the communi-
`cation process. Further, due to business considerations, it
`may be economically advantageous for one wireless system
`to own a cell site which is geographically located in the
`geographic area of another wireless system.
`
`Cell sites are very expensive to install and maintain, so
`there is a very real savings for a service provider if fewer cell
`sites could be constructed while also improving coverage.
`Another area that would be affected by this is problems of
`quality service. This is because the service provider has
`conflicting requirements. To provide good coverage next to
`borders the provider would like to have high signal strength.
`To allow for hand-offs between cell sites and networks the
`signal strength needs to “fade out” at just the right level near
`the border to invoke a low threshold to start a hand-off
`process. It would be ideal to have high signal strength right
`
`
`
`
`
`
`
`
`US 6,324,404 B1
`
`5
`
`up to a geographic boundary and then drop off beyond that
`boundary. However, at the present time, presently available
`systems do not permit this type of coverage.
`
`Some areas inherently have wireless propagation
`problems, such as service areas next to bodies of water or in
`steep valleys. Wireless propagation can provide some very
`undesirable results for a number of reasons, some of which
`have been mentioned above and in the incorporated mate-
`rial. Therefore, there is a need to provide each network
`information as to which system has a right to handle a
`Communications Process (CP). For instance, a communica-
`tions device (CD) might attempt to select a geographically
`incorrect service provider. Therefore, there is a need for a
`system that will permit a service provider to redirect the
`communication process to the geographically correct service
`provider, especially in a manner that is transparent to the
`Communications Device (CD) user.
`
`Since cellular system geographic borders can be non-
`linear and can have irregular shapes, problems can arise.
`Problems associated with irregular boundaries are indicated
`in FIG. 3. FIG. 3 graphically shows the problem of obtaining
`coverage for areas that have irregular boundaries. In this
`figure, areas A and C are serviced by Carrier X, and area B
`is serviced by Carrier Y. It is noted that areas A and C are
`intrasystem with respect to Carrier X and area B is intra-
`system with respect to Carrier Y, while areas A and C are
`intersystem with respect to Carrier Y and area B is inter-
`system with respect to Carrier X. It is also noted that areas
`A and B could be covered by just one cell site each but the
`overlap into adjacent territories would be difficult to resolve.
`Today, areas such as these would be split into two or more
`cell sites. For instance, Carrier X might elect to install three
`cell sites Al, A3 and A4 which provides a minimum of
`overlap into area B. Overlap is indicated at the shaded areas.
`Therefore, there is a need for a system what would allow
`Carrier X to install a cell site with a larger coverage area
`such as A2 (shown in dotted lines).
`
`FIG. 4 shows a prior art attempt of providing sectored
`cells. Using prior art technology requires installation of
`directional antennas to minimize the overlap into neighbor-
`ing territory in order to resolve a border issue. Since these
`antenna patterns cannot be made to follow curved geo-
`graphic borders, sectors are installed and directed for the
`best geographic coverage possible. This often involves
`obtaining a cell site location close to the border and “shoot-
`ing back” toward the wireless communication system’s own
`territory. This can leave null zones where cells back onto
`each other in an effort to keep signals from overlapping into
`neighboring territory. These null zones will have either poor
`quality service or even no service at all, thereby resulting in
`poor service. Therefore, there is a need to overcome this
`problem as well.
`
`FIGS. 5A and 5B illustrate a problem of how geographic
`terrain can affect prior art systems. In FIGS. 5A and 5B, a
`small rural network A is located just across the river from a
`large city C, which is part of a neighboring network B. The
`river defines the geographic and legal border between these
`two systems. The city C is in another state just across the
`river. In some river towns, there is a bluff on each side of the
`river. The network A can place their cell sites very near the
`border atop the bluff providing overlapping coverage into
`the city C. Network A will get all the service of the
`neighboring community D further away from the city C.
`Network A now has better line of cell site reception into the
`river valley with its corresponding traffic at river level than
`does network B who legally “owns” the territory. Network
`B would have to install additional cell sites in the river
`
`10
`
`15
`
`20
`
`25
`
`30
`
`35
`
`40
`
`45
`
`50
`
`55
`
`60
`
`65
`
`6
`
`valley to obtain the same coverage. Due to the stronger
`signal level provided by Network A, Network A will process
`a communications process (CP). The result is that subscrib-
`er’s Communication Process (CP) may not be processed by
`the correct service provider.
`
`Note in FIG. 5A that there are two service providers X and
`Y. The intersystem boundary is shown as a dashed line down
`the middle of the river. With a bluff on either side of the
`river, the cells can only service the opposite bluff. This is
`shown where Y1 cell site cannot “see” the subscriber CD'
`hidden below. cell site Y1 can however find CD3 in service
`provider X’s territory. This issue denies revenue to the
`wireless communication system that has legal right to serve
`the subscribers within its licensed geographic service bound-
`aries. Prior art systems are incapable of determining the
`geographic location of both the communications devices and
`their service boundaries and thus compromise quality of
`coverage. Therefore, there is a need to resolve this issue.
`
`There is also need for providing a wireless over-the-air
`communication system with the ability to adjust its coverage
`and billing as the mobile unit moves. This will permit the
`system to determine taxes based on where the communica-
`tion process is actually being made as opposed to the criteria
`used with the prior art. Still further, there is a need to permit
`a wireless over-the-air communication system to change
`frequencies as the mobile unit moves whereby a single
`wireless service provider can provide service to its subscrib-
`ers regardless of frequency.
`
`Still further, due to various business reasons, a single cell
`site may advantageously be u

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket