`
`INTERNAL REV 1 (02/02/93) - TO ADD QUALITY PLAN NO ITEM 5
`
` - TO ADD NOTES
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`5
`1
`
` - TO ADD ITEM 32A
` - TO AMEND DESCRIPTION ITEMS 14, 21,
` - TO ADD PRICE FOR SECTION VII
` - TO AMEND QTY ITEM 31
` - TO AMEND UNIT COST ITEM 36
` REV 3 (12/03/93) - TO AMEND SOURCE ITEM 35
` - TO ADD ITEMS 37 AND 38
` - TO AMEND DESCRIPTION AND ADD P/N
` - TO AMEND DESCRIPTION ITEMS 20, 21
` - TO AMEND HYD. SYSTEM CLEANLINESS
` - TO AMEND PRICE ITEM 15
` - TO AMEND PRICE AND DESCRIPTION ITEM
` REV 2 (09/02/93) - TO AMEND PRICE AND DESCRIPTION ITEM
`
` REV 5 (23/03/93) - TO AMEND DESCRIPTION ITEM 8
`
`
`
`
`
`
`
`
`
`
` REV 4 (17/03/93) - TO AMEND P/NO'S ITEMS 9 AND 29
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`23, 25, 26, 35 AND 38
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`ITEM 36
`AND 23
`CLASS ITEM 15
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`SKID
`3. TREE CAD & RUNNING TOOL
`2. TREE SKID 10 T. GROSS
`1. TUBING HANGER SKID
`01/03/93
`1ST DECEMBER 1992
`
`A10-9681
`
`PC-008471
`9633
`
`DENMARK
`6700 ESBJERG
`VAREHUS NO. 1
`KANALEN 1
`MAERSK OLIE OG GAS A.S.
`
`50 ESPLANADEN
`MAERSK OLIE OG GAS A.S.
`
`Dril-Quip, Exh. 1007, Page 1 of 25
`
`
`
` REV 8 (20/05/93) - TO ADD ITEM 66, TO ADD P/NO ITEM 61
` REV 7 (08/04/93) - TO AMEND PART NO. ITEM 34
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
` AND DESCRIPTION ITEMS 30 AND 31
`
` REV 6 (01/04/93) - TO AMEND DESCRIPTION AND P/NO ITEM
`
` - TO ADD ITEMS 64 AND 65
` - TO AMEND P/N ITEM 40
` - TO ADD NOTE ITEM 35
` - TO AMEND P/N ITEM 34
` - TO AMEND DESCRIPTION ITEM 27
` - TO AMEND PAINT SPEC ITEM 26
` - TO AMEND P/N AND QP NO ITEM 16
`-TO DELETE NOTE ITEM 15
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`34
`
` (IN LINE WITH DQ INC S/ORDER 20-
`
` - TO AMEND P/NO ITEM 51
` - TO AMEND DESCRIPTION ITEM 62
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`9798 REV 8).
`
`& 63
`
`A20- 9633
`
`Dril-Quip, Exh. 1007, Page 2 of 25
`
`
`
`49,330.00
`
`49,330.00
`
`RING HAS QTY SIX (6) ANTI-ROTATION KEYS AND QTY THREE (3)
`INTERNAL PROFILE THAT LANDS ONTO 36" LANDING JOINT (ITEM 1).
`THIS SHALL INCLUDE THE SUPPLY OF A LOAD BEARING RING WITH AN
`WELLHEAD PROTECTION FRAME CENTRE RING ASSY:
`
`4-800000-
`
`02
`
`1
`
`5
`
`INCLUDED IN ITEM 2
`
`INCLUDED IN ITEM 2
`
`PLATE (ITEM 3).
`500 FT. OF 0.500" DIA WIRE ROPE FOR RETRIEVAL OF ANTI-ROTATION
`
`917215-06WIRE ROPE:
`
`Q51-240565-02
`FOR 36" X 1.500" WALL QUIK JAY "8" IV PIN.
`
`240565-02ANTI-ROTATION PLATE:
`
`1
`
`4
`
`1
`
`3
`
`7,685.00
`
`7,685.00
`
`QP-Q51-2-200179-03
`PIPE. STANDARD SERVICE. INCLUDES:
`PREPARATION ON TOP SUITABLE FOR WELDING TO 36" X 1.500" WALL
`36" X 1.500" WALL QUIK-JAY PIN WITH MACHINED BUTTWELD
`36" QUIK-JAY "8" IV PIN:
`
`2-200179-
`
`03
`
`1
`
`2
`
`21,850.00
`
`21,850.00
`
`A20- 9633
`
`QP-Q51-2-300221-02
`PIPE. MINIMUM I.D. 26.250". STANDARD SERVICE.
`PREPARATION ON BOTTOM SUITABLE FOR WELDING TO 36" X 2.00" WALL
`OR MINUS 7-1/2 DEGREE ALIGNMENT. UNIT TO HAVE MACHINE BUTTWELD
`COMPLETION/PROTECTIVE FRAME STRUCTURE. UNIT PROVIDES FOR PLUS
` O.D. HAS ORIENTATION/LOCKING PROFILE TO ACCEPT
`LOCKDOWN GROOVE FOR LANDING AND LOCKING THE 20" MUDLINE HANGER.
`QUIK-JAY BOX UP WITH 26.250" MACHINED LANDING SHOULDER AND
`36" LANDING JOINT :
`SECTION I - DRIL-THRU MUDLINE EQUIPMENT
`
`AND SUBSEA COMPLETION EQUIPMENT
`DRIL-THRU MUDLINE DRILLING SYSTEM
`
`2-300221-
`
`02
`
`1
`
`1
`
`Dril-Quip, Exh. 1007, Page 3 of 25
`
`
`
`29,660.00
`
`29,660.00
`
`9,730.00
`
`9,730.00
`
`A20- 9633
`
`ASSEMBLY AND TUBING HANGER ASSEMBLY. UPPER SECTION OF 12-3/8"
`9-5/8" SPLIT RING CASING HANGER AND 12-3/8" X 9-5/8" SEAL
`HOUSING TO HAVE AN INTERNAL PREPARATION TO LAND, LOCK AND SEAL
`MOVEMENT BETWEEN HOUSING AND 20" MUDLINE COMPLETION HANGER.
`TO HAVE A SHEAR PIN LOCKDOWN MECHANISM TO PREVENT VERTICAL
`CENTRALIZATION AND LOCATION IN 20" COMPLETION HANGER. HOUSING
`O.D. 18.510" MACHINED AT TWO (2) LOCATIONS TO PROVIDE ACCURATE
`PROFILE (TOP). EXTERNAL LANDING SHOULDERED O.D. PROFILES MAX.
`HOUSING TO HAVE 12-3/8" 5,000 PSI MWP DRIL-QUIP QUIK-CLAMP
`12-3/8" - 5,000 PSI WP WELLHEAD HOUSING
`
`QP-Q51-2-300223-02
`20" X 0.625 BUTTWELD PREP DOWN. STANDARD SERVICE.
`SUPPORT THE 12-3/8" WELLHEAD HOUSING. UNIT TO HAVE MACHINED
`SHOULDER I.D. MIN. 17.553" WITH EXTENDED BORE TO CENTRALIZE AND
`LAND IN 36" HOUSING, CENTRALIZING BUTTWELD REACTION SUB.
`EXTERNAL LANDING SHOULDER AND SHEAR PIN LOCKDOWN MECHANISM TO
`20" HANGER WITH SEAL BORE ON TOP, LEFT HAND RUNNING THREADS,
`20" MUDLINE COMPLETION HANGER
`QUALITY PLAN NO: 9633-05
`PRIOR TO SHIPMENT.
`REMAINDER TO BE FILLET WELDS. UNIT IS TO BE BLASTED AND PRIMED
`COVERS. ALL WELDS TO CENTER RING TO BE FULL PENETRATION AND
`550MM BEAMS ARE TO BE BOXED IN WITH 15MM PLATE WITH 10MM END
`COMPLETE WITH CIW TYPE POST TOPS. POSTS ARE 10' LONG. ALL
`EACH BOLT-ON GUIDE POSTS LOCATED 180o APART ON 4 FT. RADIUS
`MM BEAMS 1900 MM FROM C/L OF WELL TO END OF BEAM AT 60o. TWO
` EACH BEAM LOCATED AT 180o. UNIT ALSO INCLUDES FOUR EACH 550
`TWO EACH 550 MM BEAMS 3300 MM FROM C/L OF WELL TO END OF BEAM.
`UNIT INCLUDES:-
`PIPE WITH JAY TYPE RUNNING TOOL.
`FRAME STRUCTURE AND PROVIDES FOR RUNNING STRUCTURE ON DRILL
`FEATURES. UNIT TO BE FABRICATED INTO COMPLETION/PROTECTIVE
`AUTOMATIC LOCK-DOWN DOG ASSYS WITH DIVER OPERATED MANUAL LOCK
`
`2-300225-
`
`02
`
`1
`
`7
`
`2-300223-
`
`02
`
`1
`
`6
`
`Dril-Quip, Exh. 1007, Page 4 of 25
`
`
`
`6,525.00
`
`6,525.00
`
`PROTECTS I.D. OF HOUSING AND HANGER. RUN AND RETRIEVED WITH
`
`290227-0212-3/8" X 9-5/8" WEAR BUSHING
`
`1
`
`12
`
`8,995.00
`
`8,995.00
`
`6,760.00
`
`6,760.00
`
`QP-Q51-400023-02
`THREAD TOOL PREPARATION TOP. H2S SERVICE.
`RESILIENT SEAL WITH RIGHT HAND THREAD BOTTOM AND 'J' RUNNING
`
`400023-0212-3/8" X 9-5/8" EMERGENCY SEAL ASSEMBLY
`
`1
`
`11
`
`QP-Q51-400019-02
`RUNNING TOOL PREPARATION TOP. H2S SERVICE.
`METAL-TO-METAL SEAL WITH RIGHT HAND THREAD BOTTOM AND 'J'
`
`400019-0212-3/8" X 9-5/8" SEAL ASSEMBLY
`
`1
`
`10
`
`12,160.00
`
`12,160.00
`
`9,760.00
`
`9,760.00
`
`NOTE:40# NKK 3SB BOX TO BE MACHINED IN ABERDEEN.
`QP-Q51-2-300228-01
`5/8" 40 PPF NKK 3SB BOX CONNECTION DOWN. H2S SERVICE.
`RUNNING THREAD AND RIGHT HAND SEAL INSTALLATION THREAD UP. 9-
`HOUSING. MAXIMUM O.D. 12.265", MINIMUM I.D. 8.803" LEFT HAND
`9-5/8" SPLIT RING CASING HANGER TO LAND IN 12-3/8" WELLHEAD
`12-3/8" x 9-5/8" SPLIT RING CASING HANGER
`
`2-300228-
`
`02
`
`1
`
`9
`
`QP-Q51-290219-02
`PIPE SUB, WITH SHEAR PINS. 9.365" I.D. H2S SERVICE.
`SPLIT RING LOCKING MECHANISM. RUN AND RETRIEVED WITH DRILL
`
`290219-0212-3/8" BORE PROTECTOR
`
`1
`
`8
`
`QP-Q51-2-300225-02
`H2S SERVICE.
`LBS/FT) ON BOTTOM OF HOUSING, PROFILE I.D. MINIMUM. 12.303".
`LINED DX RING GROOVE AREA. 13-3/8" BUTTRESS BOX CONNECTION (68
`HOUSING TO HAVE LEFT HAND RUNNING THREADS AND STAINLESS STEEL
`
`A20- 9633
`
`Dril-Quip, Exh. 1007, Page 5 of 25
`
`
`
`8.783" I.D. H2S SERVICE.
`
`QP-Q51-290227-02
`'J' TOOL.
`
`A20- 9633
`
`Dril-Quip, Exh. 1007, Page 6 of 25
`
`
`
`3,595.00
`
`3,595.00
`
`65,565.00
`
`65,565.00
`
`A20- 9633
`
`QP-Q51-2-300248-02
`OF TUBING HANGER.
`RUNNING STING ON T.A. CAP J-TOOL. PROTECTS I.D. AND TOP FACE
`MATERIAL: AISI 4130 LOW ALLOY STEEL. RUN INSIDE 13-3/8"
`TO PREVENT INGRESS OF DEBRIS ONTO TUBING HANGER. BASE
`TUBING HANGER 'CRUD CAP'
`
`QP-Q51-2-300235-02
`EDITION) H2S SERVICE.
`MODIFIED, F6NM, PSL 3 AND CONFORMS TO NACE MR-01-75 (LATEST
`CONNECTION. BASE MATERIAL: STAINLESS STEEL TYPE 410
`A STAINLESS STEEL 718 SWAGELOK TYPE FITTING FOR CONTROL LINE
`COMMUNICATION PORT, TERMINATING IN BOTTOM CONNECTION TO ACCEPT
`THROUGH BORE 9,000 PSI MWP RATED D.H.S.V. HYDRAULIC
`THROUGH BORE OF TUBING HANGER = 3.958" I.D. ONE (1) 1/4" NOM
`1.75 IN2, WITH A "FAIL AS IS" MODE OF OPERATION. MINIMUM
`ANNULUS PISTON TYPE VALVES PROVIDING AN ANNULUS FLOW AREA OF
`ASSEMBLY, LOCK DOWN RING, INTEGRAL HYDRAULIC PRESSURE BALANCED
`THREAD UP. INCLUDES INTEGRAL WEIGHT SET METAL-TO-METAL SEAL
`4-1/2" NEW VAM BOX DOWN 12.6 LBS/FT AND LEFT HAND ACME RUNNING
`W.P. WITH
`SINGLE TUBING STRING SYSTEM NOM 12-3/8" X 4-1/16" 5,000 PSI
`MUDLINE TUBING HANGER
`EQUIPMENT
`SECTION II - SUBSEA X-MAS TREE, TUBING HANGER AND COMPLETION
`
`2-300248-
`
`02
`
`1
`
`14
`
`2-300235-
`
`02
`
`1
`
`13
`
`Dril-Quip, Exh. 1007, Page 7 of 25
`
`
`
`577,180.00577,180.00
`
`A20- 9633
`
`GROOVE (ANNULUS ACCESS AND BLEED)
`* STUDDED API OUTLET - 2-1/16" NOM BORE 5K MWP W/BX 152 RING
`VALVE).
`MWP W/BX 151 RING GROOVE (FOR D.H.S.V. ISOLATION CONTROL
`* STUDDED OUTLET - API 1-13/16" 10,000 PSI FOR 0.500" BORE 9K
`RING GROOVE (FOR CHEMICAL INJECTION)
`* STUDDED API SIDE OUTLET - 2-1/16" NOM BORE 5K MWP W/BX 152
`RING GROOVE (PRODUCTION WING)
`* STUDDED API SIDE OUTLET - 4-1/16" NOM BORE 5K MWP W/BX 155
`VALVE BLOCK SIDE OUTLETS
`COATING.
`TO BE PROTECTED FROM CORROSION BY WEAR RESISTANT
`* ACTUATED VALVES FITTED WITH A MECHANICAL OVERRIDE FEATURE AND
`W.P. MEETS API17D & 6A REQUIREMENTS.
`* HYDRAULIC FAILSAFE CLOSE - SWAB VALVE - 4-1/16" 5,000 PSI
`17D & 6A REQUIREMENTS.
`LINE OF STANDARD CARBON STEEL BRIGHT API 9A. METS API 14D,
`PSI W.P. UMV IS CAPABLE OF CUTTING 0.108" DIAMETER SLICK
`* HYDRAULIC FAILSAFE CLOSE - UPPER MASTER VALVE - 4-1/16" 5,000
`6A & 17D REQUIREMENTS.
`* MANUAL LOWER MASTER VALVE - 4-1/16" 5,000 PSI W.P. MEETS API
`GATE VALVES AND ACTUATORS
`HOUSING.
`TO ENABLE EMERGENCY RELEASE OF CONNECTOR FROM WELLHEAD
`* WELLHEAD CONNECTOR TO HAVE TWO (2) MECHANICAL OVERRIDE RODS
`ENGAGEMENT.
`INCLUDES EXTENDED GUIDE SKIRT TO PRE-ALIGN TREE PRIOR TO
`CONNECTOR COMPLETE WITH 12-3/8" DX RING GASKET,
`* 12-3/8" 5K MWP DRIL-QUIP QUIK-CLAMP HYDRAULIC WELLHEAD
`WELLHEAD CONNECTOR
`MR-01-75 (LATEST EDITION) INCLUDES THE FOLLOWING:-
`NACE
`STAINLESS STEEL TYPE 410 MODIFIED, F6NM PSL 3 AND CONFORMS TO
`SUBSEA XMAS TREE BLOCK VALVE ASSEMBLY - PSL-3
`
`2-800004-
`
`02
`
`1
`
`15
`
`Dril-Quip, Exh. 1007, Page 8 of 25
`
`
`
`GROOVE (FOR PRESSURE TESTING 12-3/8" DX GASKET).
`* STUDDED API SIDE OUTLET - 1-13/16" 10,000 PSI W/BX 151 RING
`(FOR PRESSURE MONITORING LINE)
`* STUDDED OUTLET -API 1-13/16" 10,000 PSI W/BX 151 RING GROOVE
`
`A20- 9633
`
`Dril-Quip, Exh. 1007, Page 9 of 25
`
`
`
` 3A DHSV
` 2A PRODUCTION UPPER MASTER VALVE
`* AND PRODUCTION CONTROL FOR FUNCTIONS
`9. DX RING GASKET PRESSURE TEST
`8. TUBING HANGER ANNULUS ISOLATION VALVE (OPEN)
`7. TUBING HANGER ANNULUS ISOLATION VALVE (CLOSE)
`6. TREE ANNULUS OPEN
`5. TREE CONNECTOR UNLOCK
`4. TREE CONNECTOR LOCK
`3. DHSV
`2. PRODUCTION UPPER MASTER VALVE
`1. PRODUCTION SWAB VALVE
`PROVIDE WORK OVER CONTROL FOR FUNCTIONS.
`* HYDRAULIC MANIFOLD IS COMPLETE WITH 11 OFF COUPLERS TO
`* TREE RUNNING/RE-ENTRY PROFILE UP, INTEGRAL TO VALVE BLOCK.
`TREE MANDREL/MANIFOLD ASSEMBLY
`SPECIFICATION FEBRUARY 1992, REV 1.
`01-75 (LATEST EDITION), F6NM - AND COMPLIES TO NILS
`* BASE MATERIAL OF VALVE BLOCK - DQM-0508 CONFORMS TO NACE MR-
`9,000 PSI MWP.
`MAIN D.H.S.V. COMMUNICATION PORT IS RATED TO
`ANNULUS, D.H.S.V. AND PRESSURE MONITORING PORTS. THE
`* TUBING HANGER STAB SUB - 4-1/16" 5,000 PSI W.P. WITH INTEGRAL
`HYDRAULIC WELLHEAD QUIK-CLAMP CONNECTOR
`* DX SEAL GASKET POCKET 12-3/8" 5,000 PSI W.P. TO ACCOMMODATE
`* BLOCK VALVE ASSEMBLY 12-3/8" 5K DRIL-QUIP QUIK-CLAMP PROFILE
`VALVE BLOCK BOTTOM PROFILE
`
`
`
`
`
`CONT
`15
`
`A20- 9633
`
`Dril-Quip, Exh. 1007, Page 10 of 25
`
`
`
`INCLUDED IN ITEM 15
`
`A20- 9633
`
`QP-Q51-2-700052-02
`MEETS API 17D REQUIREMENTS.
`MR-01-75 (LATEST EDITION). SUITABLE FOR H2S AND CO2 SERVICE.
`STAINLESS STEEL TYPE 410 MODIFIED, F6NM AND CONFORMS TO NACE
`CONFORMS TO NACE MR-01-75 (LATEST EDITION). VALVE TRIM:
`BODY MATERIAL: STAINLESS STEEL TYPE 410 MODIFIED, F6NM AND
`- FITTED WITH MECHANICAL OVERRIDE, DOWNSTREAM GASKET T.B.A.
`RING GROOVES HYDRAULIC (FAILSAFE CLOSE ACTUATED) VALVE ASSEMBLY
`API FLANGED END CONNECTIONS - 4-1/16" 5,000 PSI W.P. W/BX 155
`PRODUCTION WING VALVE
`
`QP-Q51-2-800004-02
`FLUSHED TO HYDRAULIC CLEANLINESS OF NAS 1638 (CLASS 6).
`TERMINATION BRACKET AND WITH THE COMPLETE HYDRAULIC SYSTEM
`SHALL INCORPORATE THE RE-ENTRY/COMPLETION VERTICAL HYDRAULIC
`ACTUATORS. THE ABOVE DESCRIBED FITTING AND PRESSURE TESTING,
`SWAB, WING VALVES, CHEMICAL INJECTION AND ANNULUS ACCESS VALVE
`ALLOWS FOR HYDRAULIC CONTROL/FUNCTION OF HYDRAULIC MASTER,
`COUPLERS AND ACTUATORS IN ACCORDANCE WITH SPECIFICATION THUS
`FITTING, ASSEMBLY, PRESSURE TESTING AND FLUSHING OF HYDRAULIC
`
`2-700052-
`
`02
`
`1
`
`16
`
`CONT
`15
`
`Dril-Quip, Exh. 1007, Page 11 of 25
`
`
`
`INCLUDED IN ITEM 15
`
`INCLUDED IN ITEM 15
`
`INCLUDED IN ITEM 15
`
`A20- 9633
`
`* WELLHEAD TO TREE DX GASKET TEST PORT
`* DHSV CONTROL PORT
`* PRESSURE MONITOR PORT
`1 EACH UNIT TO BE FITTED TO:-
`OUTLET BODY MATERIAL F6NM MANUFACTURED BY PACSON.
`API FLANGE W/BX 151 RING GROOVE INLET AND 1/2" NPT THREADED
`1/2" BORE ELASTOMERICALLY SEALED NEEDLE VALVE WITH 1 13/16" 10K
`1/2" BORE ISOLATION VALVE
`
`QP-Q51-2-700042-02
`REQUIREMENTS.
`EDITION). SUITABLE FOR H2S AND CO2 SERVICE. MEETS API 17D
`EDITION). VALVE TRIM: CONFORMS TO NACE MR-01-75 (LATEST
`4130 LOW ALLOY STEEL, CONFORMS TO NACE MR-01-75 (LATEST
`ASSEMBLY FITTED WITH MECHANICAL OVERRIDE. BODY MATERIAL: AISI
`RING GROOVES HYDRAULIC (FAILSAFE CLOSE ACTUATED) VALVE
`API FLANGED END CONNECTIONS - 2-1/16" 5,000 PSI W.P. W/BX 152
`ANNULUS VALVE
`
`QP-Q51-2-700038-02
`SUITABLE FOR H2S AND CO2 SERVICE. MEETS API 17D REQUIREMENTS.
`MODIFIED, F6NM AND CONFORMS TO NACE MR-01-75 (LATEST EDITION).
`(LATEST EDITION). VALVE TRIM: STAINLESS STEEL TYPE 410
`STEEL TYPE 410 MODIFIED, F6NM AND CONFORMS TO NACE MR-01-75
`FITTED WITH MECHANICAL OVERRIDE. BODY MATERIAL: STAINLESS
`RING GROOVES HYDRAULIC (FAILSAFE CLOSE ACTUATED) VALVE ASSEMBLY
`API FLANGED END CONNECTIONS - 2-1/16" 5,000 PSI W.P. W/BX 152
`CHEMICAL INJECTION VALVE
`
`4-955033-
`
`002
`
`3
`
`19
`
`2-700042-
`
`02
`
`1
`
`18
`
`2-700038-
`
`02
`
`1
`
`17
`
`Dril-Quip, Exh. 1007, Page 12 of 25
`
`
`
`INCLUDED IN ITEM 15
`
`OF MATING FLANGE ON PROTECTION STRUCTURE.
`NOM ANSI B16.5 CLASS 2500 FLANGE C/W PIPEWORK TO SUIT POSITION
`2-1/16" 5,000 PSI WP API FLANGE W/BX 152 RING GROOVE X 2-1/2"
`CHEMICAL INJECTION SPOOL
`
`4-800003-
`
`02
`
`1
`
`22
`
`12,750.00
`
`12,750.00
`
`INCLUDED IN ITEM 15
`
`A20- 9633
`
`ACCUMULATOR MOUNTINGS AND PROJECTIVE COVER OVER STAB CONNECTORS
`PARKING PROVISION FOR TWO (2) SPARE PIGTAILS, BRACKETS FOR
`TO SUPPORT PRODUCTION CONTROL UMBILICAL STAB CONNECTORS AND
`TRAPS - FABRICATED AROUND WELLHEAD CONNECTOR. INCLUDED PLATE
`TWO (2) ARM SLOTTED GUIDE FUNNEL FRAMEWORK WITH GUIDE WIRE
`INTEGRAL GUIDE FRAME ASSEMBLY
`
`(LATEST EDITION)
`BASE MATERIAL: AISI LOW ALLOY STEEL CONFORMS TO NACE MR-01-75
`C/W 1/2" NOM BORE NEEDLE VALVE ASSEMBLY.
`WECO HAMMER LUG UNION. SIDE OUTLET WITH 1/2" NPT TAPPED PORT
`VERTICAL 2-1/16" API 5,000 PSI COMPANION FLANGE ASSEMBLY X 1502
`2-1/16" API 5,000 PSI X 90o STUDDED BLOCK
`2" ANNULUS MANIFOLD
`
`4-800002-
`
`02
`
`1
`
`21
`
`4-800001-
`
`02
`
`1
`
`20
`
`Dril-Quip, Exh. 1007, Page 13 of 25
`
`
`
`31,065.00
`
`31,065.00
`
`INCLUDED IN ITEM 15
`
`A20- 9633
`
`QP-Q51-2-800016-02
`SUITABLE FOR H2S.
`* BASE MATERIAL OF TREE CAP BODY - AISI 4130 LOW ALLOY BODY,
`PROD UPPERMASTER VIA UMBILICAL TO CALM BUOY.
` HYDRAULICALLY LINKED VIA TREE CAP. D.H.S.V. AND
`* IN THE PRODUCTION MODE THE FOLLOWING UPPER STAB COUPLERS ARE
`NOTE:
`* TOP CONNECTION HYDRAULIC LATCH TYPE MANDREL
`* GUIDE PIN RECEPTACLES FOR STAB PLATE/ASSEMBLY
`STEEL PIPEWORK AND STAB CONNECTORS)
`* UPPER STAB MANIFOLD PLATE ASSEMBLY (INCLUDES ALL STAINLESS
`* 4-1/16" 5,000 PSI DX GASKET PROFILE
`* 4-1/16" X 5,000 PSI W.P. HYDRAULIC LATCH TYPE CONNECTOR
`THIS ASSEMBLY CONSISTS OF THE FOLLOWING COMPONENTS:
`XMAS TREE CAP ASSEMBLY
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`GROOVE
`2. COOPER CHOKE 4-1/16" X API 5,000 PSI FLANGE W/BX-155 RING
`1. WALTHER COUPLINGS
`CUSTOMER SUPPLIED ITEMS:-
`ASSEMBLY.
`AND TESTING CUSTOMER SUPPLIED ITEMS. PRESSURE TESTING OF
`FOR FAIL SAFE VALVES. SUPPLY AND FITTING OF ANODES. FITTING
`1638 (CLASS 6). SUPPLY AND FIT UP OF COMPENSATOR ACCUMULATOR
`SUPPLY OF CONTROL LINES ETC. HYDRAULIC SYSTEM FLUSHING TO NAS
`SUPPLY OF ALL SBX RING GASKETS, STUDS AND NUTS AS REQUIRED.
`TO INCLUDE ASSEMBLY OF ITEMS 15, 16, 17, 18, 19, 20, 21 AND 22.
`TREE UNITIZATION
`
`2-800016-
`
`02
`
`1
`
`24
`
`4-800004-
`
`02
`
`23
`
`Dril-Quip, Exh. 1007, Page 14 of 25
`
`
`
`19,250.00
`
`19,250.00
`
`INCLUDED IN ITEM 24
`
`A20- 9633
`
`PROTECTIVE COATING OF STEEL - COLOUR WHITE (D.Q.C. 022).
`* AS PER MAERSK OLIE OG GAS TECHNICAL STANDARD TS-34 -
`INCLUDING THE WELLHEAD/TREE CAP PROTECTION FRAME COVER.
`ARM XMAS TREE GUIDE FRAME
`EPOXY PAINT SUBSEA TREE CONNECTOR/VALVE BLOCK ASSEMBLY, TWO (2)
`
`1
`
`26
`
`WITH SS-15 MULTI-PURPOSE TOOL.
`LIFTING SLINGS. RUNNING PREP IS RECESSED AND IS COMPATIBLE
`OPENING. INCLUDES ANODES ON UNDERSIDE, LIFTING POINTS AND
`UNIT LOCATES OVER GUIDE POSTS AND SITS ON PROTECTION FRAME TOP
`WELLHEAD PROTECTION FRAME COVER
`
`4-800005-
`
`02
`
`25
`
`Dril-Quip, Exh. 1007, Page 15 of 25
`
`
`
`5,980.00
`
`5,980.00
`
`6,210.00
`
`6,210.00
`
`7,795.00
`
`7,795.00
`
`A20- 9633
`
`NOTE:40 PPF NKK 3SB BOX THREAD TO BE MACHINED IN ABERDEEN.
`QP-Q51-2-300229-01
`HANGER 9-5/8". 40 PPF NKK 3SB BOX.
`LEFT HAND RUNNING THREAD TO MATCH 9-5/8" SPLIT RING CASING
`12-3/8" X 9-5/8" CASING HANGER FULL BORE RUNNING TOOL
`
`2-300229-
`
`02
`
`1
`
`29
`
`QP-Q51-2-300227-02
`12.303" MINIMUM BORE. H2S SERVICE.
`HOUSING. 13-3/8" 68 P.P.F. API BUTTRESS BOX CONNECTION UP.
`AND LEFT HAND RUNNING THREADS TO MATCH WITH THOSE IN 12-3/8"
`UNIT TO HAVE ELASTOMER SEAL RINGS TO SEAL IN 12-3/8" HOUSING
`12-3/8" WELLHEAD HOUSING RUNNING TOOL
`
`QP-Q51-2-300233-02
`SERVICE.
`FACILITATE WASH OUTS. 20" X .625" B.W.P. UP. STANDARD
`PASS AROUND 20" MUDLINE HANGER AND PROTECTIVE SKIRT TO
`TO MATCH WITH THOSE ON 20" HANGER. 18.740" BORE FOR FLUID BY-
`COMPLETE WITH METAL-TO-METAL SEAL. LEFT HAND RUNNING THREADS
`UNIT HAS ELASTOMER SEAL RINGS TO SEAL INSIDE 20" HANGER
`20" MUDLINE HANGER RUNNING TOOL
`SECTION III - SUBSEA INSTALLATION/COMPLETION RUNNING TOOLS
`
`2-300227-
`
`02
`
`1
`
`28
`
`2-300233-
`
`02
`
`1
`
`27
`
`Dril-Quip, Exh. 1007, Page 16 of 25
`
`
`
`40,915.00
`
`40,915.00
`
`7,785.00
`
`7,785.00
`
`23,855.00
`
`23,855.00
`
`A20- 9633
`
`* LIFTING HANDLING TEST SUB (PIN CONNECTOR DOWN X LOAD TESTED
`* 4-1/16" 5,000 PSI DX GASKET. STAINLESS STEEL.
`ASSEMBLY.
`ASSEMBLY
`* 'HYDRAULIC WORKOVER UMBILICAL' STAB MODULE MOUNTING PLATE
`GROOVE (TRANSITIONED BORE).
`LBS/FT (COUPLING UP) X 7-1/16" 15K TYPE BX 159 RING
`* CROSSOVER SUB/STRESS JOINT COMPATIBLE WITH 5" NEW VAM 18
`15K API STUDDED TOP OUTLET.
`ASSEMBLY C/W NINE (9) STAINLESS STEEL COUPLERS) X 7-1/16"
`* 4-1/16" X 5K HYDRAULIC CONNECTOR (UPPER STAB MANIFOLD
`SUBSEA TREE/RUNNING TOOL ASSEMBLY including the following:
`
`TO MOUNT FREE ISSUE STAB PLATE
`
`QP-Q51-2-300231-02
`SUPPLIED WITH QTY 12 SWAGELOK FITTING P/N: 4-955077-04
`VAM 12.6 LBS/FT BOX X BOX CONNECTIONS. H2S SERVICE. TO BE
`LINE PORTS X 1/2" NPT THREADS EACH END. 4-1/2" NOM BORE NEW
`7" O.D. B.O.P. TEST SUB X 48" OAL C/W SIX (6) HYDRAULIC CONTROL
`B.O.P. TEST SUB
`
`QP-Q51-2-300238-02
`TO BE SUPPLIED WITH QTY 5 SWAGELOK FITTING P/N: 4-955077-04
`* LOCKDOWN SLEEVE - LOCK AND UNLOCK FUNCTION H2S SERVICE
`* ANNULUS VALVES OPEN AND CLOSE
`* D.H.S.V.
`INCLUDES CONTROL PORTING FOR THE FOLLOWING:
`* LIFTING HANDLING TEST SUB
`* 4-1/2" NEW VAM BOX UP
`* LOWER STAB SUB PROTECTOR
`INCLUDING:-
`TUBING HANGER HYDRAULIC RUNNING/RETRIEVAL TOOL (T.H.R.R.T.)
`
`2-800010-
`
`02
`
`1
`
`32
`
`2-300231-
`
`02
`
`1
`
`31
`
`2-300238-
`
`02
`
`1
`
`30
`
`Dril-Quip, Exh. 1007, Page 17 of 25
`
`
`
`28,350.00
`
`28,350.00
`
`ABERDEEN MFG.
`* BASE FRAMEWORK TO INCORPORATE FOOT PADS - HOUSTON DESIGN -
`ABERDEEN MFG.
`* TWO MINI GUIDE POSTS FOR ALIGNMENT - HOUSTON DESIGN -
`DESIGN - ABERDEEN MFG.
`RING FOR TESTING TREE AND PROTECTION STRUCTURE - HOUSTON
`* PROVISION FOR DUMMY 20" HANGER, 36" QUIK-JAY BOX AND LANDING
`300249-02
`* PROVISION FOR DUMMY TUBING HANGER FOR TESTING TREE REF 2-
`300249-02
`* PROVISION FOR TESTING TUBING HANGER WITH TREE IN PLACE REF 2-
`X WELLHEAD BORE PROFILE INCLUDES:-
`12-3/8" - 5K MWP MANDREL WITH DRIL-QUIP QUIK-CLAMP PROFILE TOP
`SUBSEA XMAS TREE/SHIPPING SKID/TEST STUMP
`
`4-800027-
`
`02
`
`1
`
`34
`
`8,505.00
`
`8,505.00
`
`ASSEMBLY. ALLOWS FOR TESTING OF RUNNING TOOL.
`TO ACCOMMODATE TRANSPORTATION OF SUBSEA XMAS TREE RUNNING TOOL
`4-1/16" - 5K MWP MANDREL WITH DRIL-QUIP QUIK-CLAMP PROFILE TOP
`TREE RUNNING TOOL SKID
`
`2-800020-
`
`02
`
`1
`
`33
`
`TOOLS UMBILICAL JUNCTION PLATE
`TO ITEM 32 MOUNT AND CONNECT AS REQUIRED FREE ISSUE COOPER OIL
`SUBSEA TREE/RUNNING TOOL ASSEMBLY UNITIZATION
`QP-Q51-2-800010-02
`FRAME ASSEMBLY
`INCORPORATED INTO TWO (2) ARMED SLOTTED GUIDE FUNNEL GUIDE
`LIFTING EYE UP)
`
`
`
`4-800025-
`
`02
`
`1
`
`32A
`
`A20- 9633
`
`Dril-Quip, Exh. 1007, Page 18 of 25
`
`
`
`4,835.00
`
`4,835.00
`
`COUPLINGS.
`48" CENTRES. TO BE COMPATIBLE WITH 4-1/2" I.F. DRILL PIPE
`UNIT CONSISTS OF 2 OFF GUIDE ARMS COMPLETE WITH GUIDE CONES ON
`2-ARM GUIDE FRAME
`
`4-800012-
`
`02
`
`1
`
`38
`
`6,185.00
`
`6,185.00
`
`RECOVERED ON JAY TYPE TOOL.
`INSTALLATION OF WELLHEAD PROTECTION STRUCTURE. RUN AND
`PROVIDES PROTECTION FOR 20" AND 12-3/8" WELLHEAD HOUSING DURING
`UNIT CONSISTS OF PIN DOWN TO INTERFACE @ 36" QUIKJAY BOX.
`36" QUIK-JAY/PROTECTION FRAME GUIDE
`
`4-800011-
`
`02
`
`1
`
`37
`
`2,250.00
`
`1,125.00
`
`CONNECTOR AND STRAIGHT PULL SHEAR RELEASE.
`WITH INTERNAL LATCH WIRELINE CONNECTORS WITH STRAIGHT STAB
`5/8" X 80M LONG GUIDE WIRES
`
`4-800010-
`
`02
`
`2
`
`36
`
`6,420.00
`
`6,420.00
`
`A20- 9633
`
`NOTE:ABERDEEN TO MANUFACTURE/HOUSTON TO ENGINEER.
`SUB AND R/TOOL CROSSOVER SUB.
`MADE UP TO TUBING HANGER, TUBING HANGER RUNNING TOOL, BOP TEST
`FRAMEWORK TO INCLUDE BRACKETS TO SUPPORT 6' TUBING PUP JOINT
`TUBING HANGER SYSTEM SHIPPING SKID
`SECTION V - SUBSEA EQUIPMENT
`
`2-300247-
`
`02
`
`1
`
`35
`
`Dril-Quip, Exh. 1007, Page 19 of 25
`
`
`
`11,107.00
`
`11,107.00
`
`A20- 9633
`
`O-RING
`SPARES FOR 9-5/8" WEAR BUSHING
`
`327
`917158-
`
`3
`
`49
`
`SQUARE HD PIPE LUNG
`O-RING
`O-RING
`SPARES FOR 9-5/8" CASING HANGER RUNNING TOOL
`
`O-RING
`SPARES FOR BORE PROTECTOR
`
`O-RING
`ONE WAY SEAL
`O-RING
`O-RING
`O-RING
`SOCKET CAP SCREWS
`SPARES FOR WELLHEAD HOUSING RUNNING TOOL
`SECTION VII - COMMISSIONING SPARES
`
`277
`917155-
`279
`917155-
`
`1
`2
`2
`
`48
`47
`46
`
`327
`917158-
`
`3
`
`45
`
`289
`917155-
`902200-19
`286
`917157-
`288
`917155-
`331
`917157-
`292526
`
`1
`2
`2
`1
`1
`4
`
`44
`43
`42
`41
`40
`39
`
`Dril-Quip, Exh. 1007, Page 20 of 25
`
`
`
`O-RING
`FERRY HEAD CAP SCREWS
`SPARES FOR MILL AND FLUSH
`
`FERRY HEAD CAP SCREW
`SPARES FOR WEAR BUSHING RUNNING TOOL
`
`229
`917155-
`148
`917118-
`
`1
`4
`
`60
`59
`
`148
`917118-
`
`4
`
`58
`
`O-RING
`O-RING
`LEAD INDICATOR
`SOCKET HEAD SET SCREW FLAT POINT
`SPARES FOR SEAL ASSEMBLY RUNNING TOOL
`
`263
`917155-
`320
`917155-
`402033
`176
`917102-
`
`SPARES FOR DRILL PIPE SUB
`
`916100-12SHEAR PINS
`
`2
`2
`3
`2
`
`57
`56
`55
`54
`
`4
`
`53
`
`PIPE PLUG
`GROOVED PIN
`O-RING
`SPARES FOR 9-5/8" SEAL ASSEMBLY
`
`905102-03
`916100-27
`204
`917157-
`
`1
`4
`1
`
`52
`51
`50
`
`A20- 9633
`
`Dril-Quip, Exh. 1007, Page 21 of 25
`
`
`
`A20- 9633
`
`Dril-Quip, Exh. 1007, Page 22 of 25
`
`
`
`917542-04NEEDLE VALVE:10,000 PSI 1/2" FNPT X 1/2" FNPT WITH S/S HANDLE
`
`AND REGULATING STEM FOR H2S SERVICE.
`
`2
`
`66
`
`NEEDLE VALVE FOR TREE UTILIZATION
`
`RING GASKETS BX 156
`STAB SUB SEALS
`TREE CAP AND TREE RUNNING TOOL ASSEMBLIES
`
`2-800019-
`917440-04
`
`02
`
`2
`8
`
`65
`64
`
`400019-02SEAL ASSEMBLY - 12-3/8" X 9-5/8"
`
`1
`
`63
`
`QTY 6 - P/N 917167-04 - FLUSH PLUG
`QTY 1 - P/N 917157-258 - O-RING
`QTY 2 - P/N 917157-257 - O-RING
`QTY 2 - P/N 917157-256 - O-RING
`QTY 2 - P/N 917157-255 - O-RING
`QTY 2 - P/N 917155-266 - O-RING
`QTY 2 - P/N 917155-270 - O-RING
`QTY 2 - P/N 917155-268 - O-RING
`QTY 6 - P/N 917155-276 - O-RING
`T.H.R.R.T. (REDRESS KIT)
`INSTALLATION/COMPLETION TOOLS - 12-3/8" DX GASKETS
`ADDITIONAL SPARE PARTS
`
`2-899973
`
`N/A
`
`1
`2
`
`62
`61
`
`A20- 9633
`
`Dril-Quip, Exh. 1007, Page 23 of 25
`
`
`
`IN ABERDEEN
`UNITIZATION OF EQUIPMENT TO BE PERFORMED AT DRIL-QUIP FACILITY
`DNV.
`5. REVIEW OF SUB ORDERS AND INSPECTION AS DEEMED NECESSARY BY
`4. ISSUE OF INSPECTION RELEASE CERTIFICATE
`RULES AND REGULATIONS
`ALL CUSTOMER SPECIFICATIONS AND RELEVANT DANISH
`3. ISSUE OF STATEMENT OF COMPLIANCE TO VERIFY EQUIPMENT MEETS
`2. FABRICATION/MANUFACTURE/INSPECTION OVERVIEW
`1. DESIGN REVIEW
`SCOPE OF WORK:-
`DNV TO BE CERTIFYING AUTHORITY
`THIRD PARTY INSPECTION :
`FINAL ITEM ON SALES ORDER.
`FINAL DOCUMENTATION WILL BE SUBMITTED 7 DAYS AFTER DESPATCH OF
`MANUFACTURING/FABRICATION DATA BOOK TO BE SUPPLIED.
`DOCUMENTATION
`MAKE-UP AND APPROVAL.
`22/01/93 - QUALITY PLAN TO BE COMPILED AND SUBMITTED TO DNV FOR
`QUIP TABULATED EXCEPTIONS AND FAX FROM S. CORBETT DATED
`ITEM 5 TO BE MANUFACTURED IN ACCORDANCE WITH TS-33 WITH DRIL-
`MANUFACTURED TO API 6A, 14D AND 17D WHERE APPLICABLE.
`SPECIFICATION FOR NILS SUBSEA COMPLETION SYSTEM REV 1.
`
`TECHNICAL/INSPECTION
`
`NOTES:
`
`A20- 9633
`
`Dril-Quip, Exh. 1007, Page 24 of 25
`
`
`
`SALES ADMINISTRATION MANAGER
`BRIAN CHRISTIE
`
`ON BEHALF OF DRIL-QUIP (EUROPE) LIMITED
`
`DELIVERY:EX-WORKS, DRIL-QUIP, HOUSTON.
`TERMS:NET 30 DAYS AFTER DATE OF INVOICE.
`ABERDEEN: ITEMS 5, 19-23, 25-26, 35-38
`SOURCE:HOUSTON: ITEMS 1-4, 6-18, 24, 27-34, 39-65
`
`A20- 9633
`
`Dril-Quip, Exh. 1007, Page 25 of 25
`
`