`September 24, 2021
`
`Filed Electronically
`
`The Honorable Kimberly D. Bose, Secretary
`Federal Energy Regulatory Commission
`Attention: OEP/DHAC
`888 First Street, NE
`Washington, D.C. 20426
`
`RE:
`
`P‐2242 – Carmen‐Smith Hydroelectric Project
`License Article 3 – Instream Flows Design Plans and Schedules
`Subject: Response to July 22, 2021 letter regarding Request for Extension of Time to
`file Revised Plan & Schedule and 100% design package for Carmen Diversion Flow
`Release Structure.
`
`
`Dear Secretary Bose:
`
`On July 22, 2021, the Federal Energy Regulatory Commission (FERC) transmitted a letter to the
`Eugene Water & Electric Board (EWEB) regarding the 30 percent and 60 percent design plans
`and schedules for Carmen Diversion Dam Flow Release Structure and Carmen Power Plant
`Bypass at the Carmen‐Smith Hydroelectric Project (Project No. 2242). Settlement Agreement
`Article 3 requires Eugene Water & Electric Board (EWEB) to implement the instream flows
`required under Section 4.2 of the Aquatics Management Plan (AMP). Section 4.2.1.2 of the AMP
`requires EWEB to include a description of the flow release system, including at least a 60 cfs
`capacity for the flow release system, and any compliance monitoring equipment and its
`operation. On May 17, 2021, EWEB filed a 60% design plan and schedule with the Commission
`for the Carmen Diversion Dam Flow Release System. In its May 17 filing, EWEB included a
`record of consultation with the Fish Working Group (FWG), including responses to comments
`from Oregon Department of Fish & Wildlife and Oregon Department of Environmental Quality.
`
`The Commission’s July 22 letter directs EWEB to (1) submit a plan and schedule for Carmen
`Diversion Dam Flow Release Structure concurrently with a 100% design package by October 14,
`2021, and (2) submit a request for extension of time for filing a plan and schedule for Carmen‐
`Smith Load Bank along with a 100% design package within 14 days from the date of the letter
`(August 5, 2021). EWEB submitted a response to requirement (2) above, a request for extension
`of time to file a plan and schedule for Carmen‐Smith Load Bank along with a 100% design
`package, on August 5, 2021.
`
`
`Page 1 of 4
`
`
`
`This letter addresses requirement (1) above and submits a request for extension of time for
`filing a revised plan and schedule and 100% design package for Carmen Diversion Flow Release
`Structure.
`
`Current Progress
`
`Since October 2020, EWEB has communicated with the FWG the anticipated need for an
`extension of time request to build the Carmen Diversion Flow release structure. EWEB has also
`assured the fish agencies that, except for stopping flow for brook trout management, EWEB will
`continue meeting the Carmen‐Smith Settlement Agreement interim measure of 30 cubic feet
`per second (cfs) block flows to Upper Carmen Bypass Reach until the flow release structure is
`built. EWEB and its engineering contractors have progressed the flow release structure design
`through the 60% design phase and completed consultation on that design with the FWG in
`March 2021. On May 17, 2021, following a 30‐day consultation with the FWG, EWEB submitted
`to FERC a plan and schedule based on these 60% designs.
`
`Considering the requests for more information in FERC’s July 22 letter, EWEB offers the
`following details about the flow release structure in this extension of time request, which will
`be addressed more thoroughly in its revised plan and schedule.
`
`Description of the Carmen Diversion Dam flow release system and how the proposed system
`will provide the requisite bypass flows
`
`The Carmen Diversion Dam flow release system will consist of the following major features:
`
`Installation of two flow‐release gates mounted to roller gates within each sluiceway. The
`roller gates provide a means to control the maximum water surface elevation (WSE)
`within Carmen Reservoir. The flow‐release gates provide a means to maintain a
`minimum flow of 30 cfs into Upper Carmen Bypass Reach. This design was selected to
`better control WSE, which is a risk reduction measure associated with the sinkholes
`within and geology of Carmen Reservoir, and to meet the requirements of the
`Settlement Agreement.
` Replacement of the existing debris boom to provide a more effective means of trapping
`debris.
`Installation of a flume to direct flow downstream of the flow‐release gate near the
`location of a potential future fish ladder and below the tailwater elevation.
` Repair of spillway concrete.
`A walkway bridge, standby generator, sluiceway repairs, and site improvements will also be
`provided.
`
`Flow‐release gate design criteria require that the means of release of the 30 cfs minimum flow
`from Carmen Diversion Reservoir will be via an upward‐acting, submerged slide gate to be
`located within each sluiceway roller slide gate. The gate will be manually modulated to
`maintain the setpoint flow release via a submerged orifice created by the upward‐acting gate,
`
`
`
`Page 2 of 4
`
`
`
`based on the reservoir elevation. Additional criteria that will be considered in design of the
`flow‐release gate include:
` Gate opening of no less than 6 inches.
` Flume in the eastern‐most sluiceway channel to be used for attraction water for future
`fish ladder.
` Water depth in the flume should be a minimum of 4 inches with a maximum velocity of
`25 feet per second (fps).
`
`
`Description of compliance monitoring equipment and its operation
`
` A
`
` level element will be installed to determine the water surface elevation in Carmen Diversion
`Reservoir. This data will be used in combination with the gate opening position to determine
`the flow release from Carmen Diversion Reservoir. EWEB is still developing a system to record
`this data and the frequency of recording.
`
`Current Design Status and Request for Extension of Time
`
`In response to FERC’s correspondence on July 22, 2021, EWEB respectfully requests a 14‐month
`extension to submit the revised plan and schedule and 100% designs for the flow release
`structure from October 14, 2021, to December 14, 2022. This proposed extension allows time
`for FERC approval of a Dewatering plan for Carmen Diversion Dam spillway stilling basin
`(expected in February 2022), FERC dam safety inspection (expected in June 2022), and
`completion of the 100% design package (expected in winter 2022). This timeline is subject to
`change if the spillway stilling basin dewatering and inspection by FERC dam safety reveals
`needed repairs.
`
`Consultation Record
`
`EWEB conducts consultation with other Carmen License Settlement Parties according to
`section 4.2 of the Settlement Agreement, which requires a minimum of 30 days for
`Settlement Parties to review consultation materials. In addition, FERC has communicated
`to EWEB that they expect to receive a request for extension of time no later than six weeks
`before the deadline, and earlier if the requirement involved is a substantial project. Under
`normal circumstances, this means that EWEB must initiate consultation with Settlement
`Parties on an extension request no later than about 10 weeks before the current deadline.
`
`On July 22, 2021, EWEB received a letter from FERC directing EWEB to submit a revised
`plan and schedule and 100% design package for the Carmen Diversion Flow Release
`Structure by October 14, 2021. EWEB initiated consultation on this extension request with
`all Fish Working Group members as soon as practically possible on August 23, 2021. The
`consultation period was 30 days long, closing on September 22. The Fish Working Group
`members also had an opportunity to comment at a meeting on August 24, 2021.
`
`
`Page 3 of 4
`
`
`
`During the consultation period, EWEB received written comments from U.S. Fish and
`Wildlife Service (FWS), the Forest Service (FS), Oregon Department of Fish and Wildlife
`(ODFW), and National Marine Fisheries Service (NMFS). Generally, these comments
`reflected a shared opinion that this extension request will have limited negative impacts to
`fish and wildlife resources, provided EWEB continues as planned to provide all required
`flows to Upper Carmen Bypass Reach until the flow release structure is constructed. The
`agencies expressed general concern with the delays to EWEB’s Settlement Agreement
`obligations and recommended that the flow release structure be constructed within one
`year of EWEB filing the final 100% designs.
`
`Sincerely,
`
`
`
`Patricia A. Boyle
`Generation Contracts Supervisor
`
`Enclosures
`Comments by U.S. Fish and Wildlife Service.
`Comments by the Forest Service.
`Comments by Oregon Department of Fish and Wildlife.
`Comments by National Marine Fisheries Service.
`Carmen‐Smith Work Group Membership as of 9/24/2021.
`
`
`cc:
`
`
`
`Carmen‐Smith Fish Work Group, Lisa Krentz, EWEB Records Retention Center
`
`Page 4 of 4
`
`
`
`From:
`To:
`
`Subject:
`
`Gray, Ann E
`Tori Wilder; Finlay Anderson; Annie Birnie; Patty Boyle; Robert Bumstead; "Marilyn Fonseca"; Kenny Gabriel; Nick
`Grant; Brandon Green; Matt Helstab; Brad Houslet; Andrew Janos; Al Johnson; Melissa Jundt; Shane Kamrath;
`James Kapla; Michael Karnosh; Mike Kennedy; Lisa Krentz; Jared McKee; Laura Ohman; Scarlett Philibosian; Bill
`Richardson; Jeremy Romer; Jared Rubin; Kregg Smith; Derek Staab; Chris Stine; Andrea Sumerau; Andrew
`Talabere; Trevor Taylor; Stan Van de Wetering; Nathan Wallace; Joel Watts; Kate Wells; Dave Wiley; John
`Zauner; Jeff Ziller
`Re: [EXTERNAL] Carmen-Smith Consultation Notice - Request for Extension of Time for Carmen Diversion Flow
`Release Structure - 100% Designs and revised Plan & Schedule
`Wednesday, September 22, 2021 4:43:43 PM
`
`Date:
`
`Caution: This email originated from outside of the organization
`
`Hi Tori-
`USFWS has reviewed EWEB's 14 month extension request for the Carmen Diversion Flow
`Release Structure (design, plan, and schedule). USFWS has limited concerns with EWEB's
`proposed delay provided that EWEB continues to maintain 30 cfs minimum release block flow
`to the upper Carmen Bypass Reach year-round (or higher flows if needed to meet a minimum
`of 160 cfs in the Lower Carmen Bypass Reach), except during periods to assist with brook trout
`control efforts as agreed to by ODFW, USFS, and USFWS. Our primary concern is the delay
`and subsequent lack of a permanent release structure will result in less certainty that the
`required downstream flows are met. EWEB has had many delays in its implementation of its
`obligations that were previously negotiated in 2016 Settlement Agreement and later
`formalized in the new License for this project. However, unlike several of these delays, this is
`a rare instance where it appears there are limited negative impacts to fish and wildlife
`resources, provided EWEB provides all flow requirements below Carmen Diversion Dam.
`USFWS recommends the flow release structure to be completed and fully operational within 1
`year after the complete design is filed.
`Please contact me if you have any questions.
`
`Ann E. Gray (she/her)
`U.S. Fish and Wildlife Service
`TELEWORK- SHELTER IN PLACE: 503-847-4531
`503-231-6179 (Office)
`503-231-6195 (fax)
`LAMPREY TECHNICAL WORKGROUP
`
` -- o /////--////////
`({ >< })\\\iiiiiii\\\\\\\\\\\\\\\\\\\\\\\\\\\\~~~~~~~
` -^- \\\\\\\\\\\\\\\
`
`From: Tori Wilder <Tori.Wilder@EWEB.ORG>
`Sent: Monday, August 23, 2021 7:51 AM
`To: Finlay Anderson <finlay.anderson@kleinschmidtgroup.com>; Annie Birnie
`
`
`
`From:
`To:
`
`Subject:
`
`Date:
`Attachments:
`
`Johnson, Al- FS
`Tori Wilder; Finlay Anderson; Annie Birnie; Patty Boyle; Robert Bumstead; "Marilyn Fonseca"; Gabriel, Kenny- FS;
`Grant, Nicholas - FS; Ann Gray; Green, Brandon -FS; Helstab, Joseph -FS; Brad Houslet; Andrew Janos; Melissa
`Jundt; Kamrath, Shane -FS; James Kapla; Michael Karnosh; Mike Kennedy; Lisa Krentz; Jared McKee; Laura
`Ohman; Scarlett Philibosian; Bill Richardson; Jeremy Romer; Jared Rubin; Kregg Smith; Derek Staab; Chris Stine;
`Andrea Sumerau; Andrew Talabere; Trevor Taylor; Stan Van de Wetering; Nathan Wallace; Joel Watts; Kate
`Wells; Dave Wiley; John Zauner; Jeff Ziller
`RE: [External Email]Carmen-Smith Consultation Notice - Request for Extension of Time for Carmen Diversion
`Flow Release Structure - 100% Designs and revised Plan & Schedule
`Wednesday, September 22, 2021 5:00:07 PM
`image001.png
`image002.png
`image003.png
`image004.png
`
`Caution: This email originated from outside of the organization
`
`Hi Tori,
`The USFS has reviewed EWEB's 14 month extension request for the Carmen Diversion Flow
`Release Structure (design, plan, and schedule). The USFS has no substantial concerns with
`EWEB's proposed extension request. However, the USFS is concerned about EWEB delays in
`implementation of obligations that were previously negotiated in 2016 Settlement Agreement
`and later formalized in the new License for this project. Please let me know if you have any
`questions.
`Al
`
`
`
`Al Johnson
`Hydrologist
`Forest Service
`Willamette & Umpqua National Forests
`p: 541-225-6431
`c: 541-650-1676
`f: 541-225-6377
`al.johnson@usda.gov
`3106 Pierce Parkway, Suite D
`Springfield, OR 97477
`www.fs.fed.us
`
`Caring for the land and serving people
`
`
`
`From: Tori Wilder <Tori.Wilder@EWEB.ORG>
`Sent: Monday, August 23, 2021 7:51 AM
`To: Finlay Anderson <finlay.anderson@kleinschmidtgroup.com>; Annie Birnie
`<annie.birnie@noaa.gov>; Patty Boyle <Patty.BOYLE@eweb.org>; Robert Bumstead
`<bumstead@pacificu.edu>; 'Marilyn Fonseca' <fonseca.marilyn@deq.state.or.us>; Gabriel, Kenny-
`FS <Kenneth.Gabriel@usda.gov>; Grant, Nicholas - FS <nicholas.grant@usda.gov>; Ann Gray
`<ann_e_gray@fws.gov>; Green, Brandon -FS <brandon.green@usda.gov>; Helstab, Joseph -FS
`
`
`
`From:
`To:
`Cc:
`
`Subject:
`
`Date:
`
`ZAUNER John R * ODFW
`Tori Wilder
`Finlay Anderson; Annie Birnie; Patty Boyle; Robert Bumstead; FONSECA Marilyn * DEQ; Kenny Gabriel; Nick
`Grant; Ann Gray; Brandon Green; Matt Helstab; Brad Houslet; Andrew Janos; Al Johnson; Melissa Jundt; Shane
`Kamrath; James Kapla; Michael Karnosh; Mike Kennedy; Lisa Krentz; Jared McKee; Laura Ohman; Scarlett
`Philibosian; Bill Richardson; Jeremy Romer; Jared Rubin; Kregg Smith; Derek Staab; STINE Chris * DEQ; Andrea
`Sumerau; Andrew Talabere; Trevor Taylor; Stan Van de Wetering; Nathan Wallace; Joel Watts; Kate Wells; Dave
`Wiley; John Zauner; Jeff Ziller
`RE: Carmen-Smith Consultation Notice - Request for Extension of Time for Carmen Diversion Flow Release
`Structure - 100% Designs and revised Plan & Schedule
`Wednesday, September 22, 2021 4:42:11 PM
`
`Caution: This email originated from outside of the organization
`
`Hi Tori,
`
`ODFW has reviewed EWEB’s request for a 14-month time extension to submit 100% designs
`and a revised Plan and Schedule for the Carmen Diversion Flow Release Structure. We have
`limited concerns with the proposed delay provided that EWEB continues to maintain the 30
`cfs minimum release block flow to the Upper Carmen Bypass Reach year-round (or higher
`flows if needed to meet a minimum of 160 cfs in the Lower Carmen Bypass Reach), except
`during periods to assist brook trout control efforts as agreed to by ODFW, USFWS, and USFS.
`Unlike other EWEB license obligation delays, this delay appears to have limited negative
`impacts to fish and wildlife. There is no construction completion date included in EWEB’s
`time extension request. ODFW recommends construction of the flow release structure within
`1 year after the complete design is filed.
`
`Thank you for the opportunity to comment.
`
`John
`
`John Zauner
`ODFW
`
`
`From: Tori Wilder <Tori.Wilder@EWEB.ORG>
`Sent: Monday, August 23, 2021 7:51 AM
`To: Finlay Anderson <finlay.anderson@kleinschmidtgroup.com>; Annie Birnie
`<annie.birnie@noaa.gov>; Patty Boyle <Patty.BOYLE@eweb.org>; Robert Bumstead
`<bumstead@pacificu.edu>; FONSECA Marilyn * DEQ <marilyn.fonseca@deq.state.or.us>; Kenny
`Gabriel <kenny.gabriel@usda.gov>; Nick Grant <ngrant02@fs.fed.us>; Ann Gray
`<ann_e_gray@fws.gov>; Brandon Green <bkgreen@fs.fed.us>; Matt Helstab
`<jmhelstab@fs.fed.us>; Brad Houslet <brad.houslet@ctwsbnr.org>; Andrew Janos
`<Andrew.Janos@EWEB.ORG>; Al Johnson <ajohnson@fs.fed.us>; Melissa Jundt
`<melissa.jundt@noaa.gov>; Shane Kamrath <skamrath@fs.fed.us>; James Kapla
`<James.Kapla@jacobs.com>; Michael Karnosh <michael.karnosh@grandronde.org>; KENNEDY Mike
`
`
`
`From:
`To:
`Cc:
`
`Subject:
`
`Date:
`Attachments:
`
`Kathleen Wells - NOAA Federal
`Johnson, Al- FS
`Tori Wilder; Finlay Anderson; Annie Birnie; Patty Boyle; Robert Bumstead; Marilyn Fonseca; Gabriel, Kenny- FS;
`Grant, Nicholas - FS; Ann Gray; Green, Brandon -FS; Helstab, Joseph -FS; Brad Houslet; Andrew Janos; Melissa
`Jundt; Kamrath, Shane -FS; James Kapla; Michael Karnosh; Mike Kennedy; Lisa Krentz; Jared McKee; Laura
`Ohman; Scarlett Philibosian; Bill Richardson; Jeremy Romer; Jared Rubin; Kregg Smith; Derek Staab; Chris Stine;
`Andrea Sumerau; Andrew Talabere; Trevor Taylor; Stan Van de Wetering; Nathan Wallace; Joel Watts; Dave
`Wiley; John Zauner; Jeff Ziller
`Re: [External Email]Carmen-Smith Consultation Notice - Request for Extension of Time for Carmen Diversion
`Flow Release Structure - 100% Designs and revised Plan & Schedule
`Thursday, September 23, 2021 2:37:22 PM
`image001.png
`image002.png
`image003.png
`image004.png
`
`Caution: This email originated from outside of the organization
`
`NMFS has no comment specific to the delay of the 100% designs for the Diversion Flow
`Release Structure, but we do remain extremely concerned regarding the continued delays in
`implementation of EWEB's Settlement Agreement obligations.
`
`Kate Wells
`she/her Why this is important
`Willamette Branch Chief
`NMFS Oregon Washington Coastal Office
`(503)-230-5437
`
`On Wed, Sep 22, 2021 at 5:00 PM Johnson, Al- FS <Alvin.Johnson1@usda.gov> wrote:
`
`Hi Tori,
`
`The USFS has reviewed EWEB's 14 month extension request for the Carmen Diversion
`Flow Release Structure (design, plan, and schedule). The USFS has no substantial concerns
`with EWEB's proposed extension request. However, the USFS is concerned about EWEB
`delays in implementation of obligations that were previously negotiated in 2016 Settlement
`Agreement and later formalized in the new License for this project. Please let me know if
`you have any questions.
`
`Al
`
`
`
`
`
`Al Johnson
`
`
`
`Carmen-Smith Settlement Agreement work group membership as of 09/24/2021
`
`Policy
`
`Designated Rep
`
`x
`x
`
`x
`
`x
`x
`
`x
`
`x
`
`x
`
`x
`x
`
`x
`
`x
`
`x
`x
`
`Fish
`x
`x
`
`x
`x
`x
`x
`
`x
`x
`x
`
`x
`
`Veg
`
`T-line
`
`Wildlife
`
`Historic
`
`Roads,
`Waste,
`Staging
`
`Fire
`
`Recreation
`
`x
`x
`
`x
`
`x
`
`x
`
`x
`x
`
`x
`
`x
`x
`
`x
`
`x
`
`x
`x
`
`x
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`x
`
`x
`
`x
`
`x
`
`x
`
`Last Name
`Alcott
`Anderson
`Arient
`Aubertin
`Averett
`Bacon
`Birnie
`Boyle
`Brunfelt
`Bumstead
`Casamassa
`Champe
`Cole
`Dusek
`Evans
`Farris
`Fontecchio
`Gabriel
`Gillespie
`Grant
`Gray
`Green
`Hamilton
`Harwood
`Hebert
`Carmen WG members
`Henson
`Hillmann
`Houslet
`Hume
`Janos
`Johnson
`Jundt
`Kamrath
`Kapla
`Karnosh
`Kennedy
`Kentta
`Kirkendall
`Lambert
`Lawson
`Long
`Mailander
`Marriott
`McAllister
`McKee
`Meyer
`Ohman
`Olmstead
`Parzych
`Perrin
`Philibosian
`Phillips
`Pigsley
`Pouley
`Pouley
`Price
`Richardson
`Rogers
`Romer
`Rubin
`Schoessler
`Seitz
`Smith
`Staab
`State Historic Preservation Office
`Stenshoel
`Stine
`
`First Name
`Emily
`Finlay
`Laddie
`Deneen
`Adrienne
`Brent
`Annie
`Patty
`Mike
`Robert
`Glenn
`Christine
`Bryan
`Lauren
`Lowell
`Krista
`Chris
`Kenny
`Scott
`Nick
`Ann
`Brandon
`Steve
`Joe
`Theresa
`Matt
`Paul
`Laurel
`Brad
`Noah
`Andrew
`Al
`Melissa
`Shane
`James
`Michael
`Mike
`Robert
`Keith
`Chrysten
`Frank
`Emily
`Deb
`Anika
`Mike
`Jared
`Kate
`Laura
`Dan
`Joe
`Natalie
`Scarlett
`Shane
`Delores
`Cheryl
`John
`Lori
`Bill
`Dirk
`Jeremy
`Jared
`Michael
`Ruby
`Kregg
`Darek
`N/A
`Kris
`Chris
`
`Email Address
`Organization
`ealcott@interfluve.com
`Consu. Interfluve
`finlay.anderson@kleinschmidtgroup.com
`Consu. Kleinschmidt Associates
`EWEB
`laddie.arient@eweb.org
`Confederated Tribes of the Grand Ronde Comm Deneen.Aubertin@grandronde.org
`Oregon Department of Fish and Wildlife
`Adrienne.W.Averett@odfw.oregon.gov
`EWEB
`brent.bacon@eweb.org
`National Marine Fisheries Service
`annie.birnie@noaa.gov
`EWEB
`patty.boyle@eweb.org
`Consu. Interfluve
`mbrunfelt@interfluve.com
`McKENZIE FLYFISHERS
`bumstead@pacificu.edu
`US Forest Service
`gcasamassa@fs.fed.us
`Consu. Stillwater Sciences
`christine@stillwatersci.com
`Consu. MacKay Sposito
`bcole@mackaysposito.com
`Consu. Stillwater Sciences
`Lauren@stillwatersci.com
`US FOREST SERVICE
`lowell.evans@usda.gov
`US Forest Service
`krista.farris@usda.gov
`National Marine Fisheries Service
`chris.fontecchio@noaa.gov
`US Forest Service
`kenny.gabriel@usda.gov
`scott.gillespie@eweb.org
`EWEB
`US FOREST SERVICE
`ngrant02@fs.fed.us
`US Fish and Wildlife Service
`ann_e_gray@fws.gov
`US Forest Service
`bkgreen@fs.fed.us
`Consu. Historical Research Associates
`shamilton@hrassoc.com
`EWEB
`joe.harwood@eweb.org
`EWEB
`theresa.hebert@eweb.org
`US FOREST SERVICE
`jmhelstab@fs.fed.us
`US Fish and Wildlife Service
`paul_henson@fws.gov
`Oregon Parks and Recreation Department
`Laurel.Hillmann@oregon.gov
`Confederated Tribes of Warm Springs
`brad.houslet@ctwsbnr.org
`noah@stillwatersci.com
`Consu. Stillwater Sciences
`EWEB
`andrew.janos@eweb.org
`US FOREST SERVICE
`ajohnson@fs.fed.us
`National Marine Fisheries Service
`melissa.jundt@noaa.gov
`US FOREST SERVICE
`skamrath@fs.fed.us
`Consu. Jacobs
`James.Kapla@jacobs.com
`Confederated Tribes of the Grand Ronde Comm michael.karnosh@grandronde.org
`Confederated Tribes of Siletz Indians
`mikek@ctsi.nsn.us
`Confederated Tribes of Siletz Indians
`rkentta@ctsi.nsn.us
`National Marine Fisheries Service
`keith.kirkendall@noaa.gov
`Trout Unlimited
`chrysten.lambert@tu.org
`EWEB
`emily.long@usda.gov
`US FOREST SERVICE
`Oregon Department of Environmental Quality Deb.Mailander@deq.state.or.us
`State of Oregon
`anika.e.marriott@doj.state.or.us
`Consu. Interfluve
`mikem@interfluve.com
`Jared_McKee@fws.gov
`US Fish and Wildlife Service
`US FOREST SERVICE
`kate.meyer@usda.gov
`EWEB
`laura.ohman@eweb.org
`EWEB
`dan.olmstead@eweb.org
`Consu. Interfluve
`jparzych@interfluve.com
`Consu. Historical Research Associates
`nperrin@hrassoc.com
`EWEB
`scarlett.philibosian@eweb.org
`Consu. MacKay Sposito
`shane.phillips@mottmac.com
`Confederated Tribes of Siletz Indians
`see other ref tab
`Confederated Tribes of the Grand Ronde Comm THPO@grandronde.org
`SHPO
`john.pouley@oregon.gov
`EWEB
`lori.price@eweb.org
`Rocky Mountain Elk Foundation
`brichardson@RMEF.ORG
`US FOREST SERVICE
`dirk.rogers@usda.gov
`Oregon Department of Fish and Wildlife
`Jeremy.D.Romer@odfw.oregon.gov
`EWEB
`jared.rubin@eweb.org
`US Fish and Wildlife Service
`Michael.Schoessler@sol.doi.gov
`US FOREST SERVICE
`ruby.seitz@usda.gov
`Oregon Department of Fish and Wildlife
`Kregg.M.SMITH@odfw.oregon.gov
`Trout Unlimited
`dstaab@tu.org
`Oregon State Historic Preservation Office
`ORSHPO.Clearance@oregon.gov
`EWEB
`kris.stenshoel@eweb.org
`Oregon Department of Environmental Quality
`stine.chris@deq.state.or.us
`
`x
`
`x
`x
`x
`x
`x
`x
`x
`x
`x
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`x
`
`x
`x
`
`x
`
`x
`
`x
`x
`
`x
`
`x
`x
`x
`
`x
`x
`
`x
`x
`
`x
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`x
`x
`
`x
`x
`
`x
`
`x
`
`x
`
`x
`x
`
`x
`
`x
`
`x
`x
`
`x
`x
`x
`
`x
`
`x
`x
`x
`
`x
`x
`
`x
`
`x
`x
`
`x
`
`x
`
`x
`
`x
`x
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`x
`
`x
`
`X
`
`x
`
`x
`
`x
`
`HPWG ann.
`
`x
`x
`
`HPWG ann.
`x
`x
`
`x
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`x
`
`x
`x
`
`
`
`Sumerau
`Talabere
`Taylor
`Taylor
`Thomas
`Trapanese
`Van de Wetering
`Wallace
`Watts
`Wells
`Wilder
`Wilson
`Yearick
`Zauner
`Ziller
`
`Andrea
`Andy
`Chris
`Trevor
`Jon
`Dan
`Stan
`Nathan
`Joel
`Kate
`Tori
`Frank
`Vince
`John
`Jeff
`
`Confederated Tribes of Siletz Indians
`EWEB
`EWEB
`Oregon Parks and Recreation Department
`EWEB
`US FOREST SERVICE
`Confederated Tribes of Siletz Indians
`Consu. Jacobs
`Oregon Department of Fish and Wildlife
`National Marine Fisheries Service
`EWEB
`US Fish and Wildlife Service
`FERC
`Oregon Department of Fish and Wildlife
`Oregon Department of Fish and Wildlife
`
`asumerau@ctsi.nsn.us
`andrew.talabere@eweb.org
`chris.taylor@eweb.org
`Trevor.taylor@oregon.gov
`jon.thomas@eweb.org
`daniel.trapanese@usda.gov
`stanvandewetering@yahoo.com
`Nathan.Wallace@jacobs.com
`joel.watts@odfw.oregon.gov
`kathleen.wells@noaa.gov
`tori.wilder@eweb.org
`Frank.Wilson@sol.doi.gov
`see other ref tab
`John.R.Zauner@odfw.oregon.gov
`Jeffrey.S.Ziller@odfw.oregon.gov
`
`x
`
`x
`
`x
`
`x
`
`x
`x
`
`x
`
`x
`x
`x
`x
`x
`
`x
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`x
`
`x
`
`x
`
`x
`
`x
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`x
`
`HPWG ann.
`
`